It is very difficult to apply stream flow data directly to the management of Total Maximum Daily Loads because there are some differences between the unit watershed and the stream flow monitoring network in their characteristics such as monitoring locations and its intervals. Flow duration curve can be developed by linking the daily flow data of stream monitoring network to 8 day interval flow data of the unit watershed. This study investigated the current operating conditions of the stream flow monitoring network and the flow relationships between the unit watershed and the stream flow monitoring network. Criteria such as missing and zero value data, and correlation coefficients were applied to select the stream flow reference sites. The reference sites were selected in 112 areas out of 142 unit watersheds in 4 river basins, where the stream flow observations were carried out in relatively normal operating conditions. These reference sites could be utilized in various ways such as flow variation analysis, flow duration curve development and so on for the management of Total Maximum Daily Loads.
Flow duration curve (FDC) can be developed by linking the daily flow data of stream flow monitoring network to 8-day interval flow data of the unit watersheds for the management of Total Maximum Daily Loads. This study investigated the applicable method for the development of long term FDC with the selection of the stream flow reference sites, and suggested the development of the FDC in 4 river basins. Out of 142 unit watersheds in 4 river basins, 107 unit watersheds were shown to estimate daily flow data for the unit watersheds from 2006 to 2010. Short term FDC could be developed in 64 unit watersheds (45%) and long term FDC in 43 unit watersheds (30%), while other 35 unit watersheds (25%) were revealed to have difficulties in the development of FDC itself. Limits in the development of the long term FDC includes no stream monitoring sites in certain unit watersheds, short duration of stream flow data set and missing data by abnormal water level measurements on the stream flow monitoring sites. To improve these limits, it is necessary to install new monitoring sites in the required areas, to keep up continuous monitoring and make normal water level observations on the stream flow monitoring sites, and to build up a special management system to enhance data reliability. The development of long term FDC for the unit watersheds can be established appropriately with the normal and durable measurement on the selected reference sites in the stream flow monitoring network.
Journal of The Korean Society of Agricultural Engineers
/
v.55
no.6
/
pp.177-186
/
2013
The purpose of this study was to analyze the temporal and spatial characteristics of the stream flow of small rural streams for investigating the status of stream depletion located downstream of irrigation reservoir. Bonghyun and Hai reservoirs and each downstream were selected for this study. Streamflow was measured for 8 stations downstream from two reservoirs from 2010 to 2012. The water quality samples were collected monthly from the 8 stream stations and 2 reservoir stations from 2011 to 2012. The stream depletion was found in most of the downstream of reservoirs for the non-irrigation period and even in the irrigation period when there were a lot of antecedent precipitation. We found that the stream segments where there were few streamflow, vegetation covers the stream and block the streamflow which makes the stream lost its original function as a stream. Water quality monitoring results of Bonghyun stream indicated that the concentration of SS, Turbidity, TOC, COD were decreased as the stream flows from the reservoir to downstream while the TN and TP were increased. The correlation analysis for water quality data indicated that the correlation between T-N and T-P was high for Bonghyeon and Sukji streams, respectively. Continuous monitoring for rural streams located in downstream of reservoirs are required to quantify the status of stream flow depletion and determine the amount of environmental flows.
Stream Pilot Project, which began in May 2003 and finished in December 2003, was selected to develop effective methods applicable to nature-like streams. Stream restoration projects aim to maintain or increase ecosystem goods and services while protecting downstream and coastal ecosystems. Fields environmental monitoring such as flow discharge and precipitation were conducted along the Idong stream for amount of channel zone change in 2007. This study selected three monitoring positions to measure the water level and discharge of flowing water. A stage-discharge relation is obtained from direct discharge measurements for three stations by fitting an empirical relationship to the data set. Since discharge measures are made only for low flow conditions, a curve of discharge against stage can then be built by fitting these data with a power curve. And this study used data obtained from floodmark checkup as well as HEC-RAS model to analyze the hydrodynamic characteristics of monitoring sites. Reach-averaged hydraulic parameters for the supply reach were calculated from the small area's HEC-RAS model for Idong stream, and a HEC-RAS model used to analyze hydraulics for a period in 2007, after the stream was considered bank stabilization.
Park, Kyug Seo;Choi, Ji-Woong;Park, Chan-Seo;An, Kwang-Guk;Wiley, Michael J.
Proceedings of the Korea Water Resources Association Conference
/
2015.05a
/
pp.106-106
/
2015
The information of flow regimes continues to be norm in water resource and watershed management, in that stream flow regime is a crucial factor influencing water quality, geomorphology, and the community structure of stream biota. The objectives of this study were to estimate Korean stream flows from landscape variables, classify stream flow gages using hydraulic characteristics, and then apply these methods to ungaged biological monitoring sites for effective ecological assessment. Here I used a linear modeling approach (MLR, PCA, and PCR) to describe and predict seasonal flow statistics from landscape variables. MLR models were successfully built for a range of exceedance discharges and time frames (annual, January, May, July, and October), and these models explained a high degree of the observed variation with r squares ranging from 0.555 (Q95 in January) to 0.899 (Q05 in July). In validation testing, predicted and observed exceedance discharges were all significantly correlated (p<0.01) and for most models no significant difference was found between predicted and observed values (Paired samples T-test; p>0.05). I classified Korean stream flow regimes with respect to hydraulic and hydrologic regime into four categories: flashier and higher-powered (F-HP), flashier and lower-powered (F-LP), more stable and higher-powered (S-HP), and more stable and lower-powered (S-LP). These four categories of Korean streams were related to with the characteristics of environmental variables, such as catchment size, site slope, stream order, and land use patterns. I then applied the models at 684 ungaged biological sampling sites used in the National Aquatic Ecological Monitoring Program in order to classify them with respect to basic hydrologic characteristics and similarity to the government's array of hydrologic gauging stations. Flashier-lower powered sites appeared to be relatively over-represented and more stable-higher powered sites under-represented in the bioassessment data sets.
The purpose of this study was to monitor the stream flow of rural streams for investigating the status of stream depletion located downstream of irrigation reservoir. Bonghyun and Hai reservoirs area, located in Hai-myeon, the city of Gosung, Gyeongsangnam Province, were selected for study watersheds and streams. Stream flow monitoring was conducted 7 times from March to September, 2011. Stream flow was measured for 8 stations downstream from two reservoirs. The stream depletion was found in most of the downstream of reservoirs for the non-irrigation period and even in the irrigation period when there were a lot of antecedent precipitation. The correlation analysis for water quality data indicated that the correlation between BOD and T-N was highest for the reservoirs. The correlation between BOD, T-N, and turbidity was high for Hai reservoir and Bonghyeon reservoir. Continuous monitoring for rural streams located in downstream of reservoirs are required to quantify the status of stream flow depletion and determine the amount of environmental flows.
Seo, Kyu-Woo;Kim, Dai-Gon;Kim, Nam-Gil;Sim, Bong-Joo;Won, Chang-Hee
Proceedings of the Korea Water Resources Association Conference
/
2006.05a
/
pp.746-751
/
2006
The geumjunggu of the onchunchun which is the upper stream have been maintained as a too much picture to become a concrete lining about existing low flow channel and the reservoir water protecting banks for the reason of the flow of an upper stream steep slope and back of the shortage of the channel area in a suitableness interval. This research made a rating-curve to decide since to ensure against risks to the flood control through the undo of the rivers. And we found the speed of current of a nature undo interval and existing concrete interval and water level change out. A result from this natural disposition we must apply as a data for the research about the plan to be established in the rivers maintenance basis plan of onchunchun.
Journal of Korean Society of Environmental Engineers
/
v.32
no.8
/
pp.802-808
/
2010
This study was carried out to apply the method of priority order selection for water quality improvement of watershed. The monitoring of flow and water quality, grouping branch streams and discharge load density were estimated on 18 branch streams located in middle and lower area of Geum River, Chungcheongnam-do. Based on average BOD concentration of stream at low flow, the results of the water quality analysis of stream which excess river living standard class 2 (less than BOD 3 mg/L) are Jeongancheon, Bangchukcheon, Gilsancheon, Jocheon, Seokseongcheon and Ganggyeongcheon. As a result of grouping stream, stream that have more than $10\;m^3/min$ of flow and more than 3.0 mg/L of average BOD concentration such as Group A are Jocheon, Seokseongcheon, Ganggyeongcheon and Jeongancheon. In Group A, stream corresponds to over than discharge load density as of 10 BOD kg/$day{\cdot}km^2$ is Jocheon, Seokseongcheon and Ganggyeongcheon. In view of the selected results to improve water quality basin through monitoring of flow and water quality, grouping stream, and estimation of discharge load density, Jocheon in Yeongi, Seokseongcheon located on the border of Buyeo and Nonsan, Ganggyeongcheon on Nonsan such as stream basin were urgent to improve water quality.
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.5B
/
pp.479-486
/
2010
Reliable hydrologic data acquisition is the basic and essential requirement for efficient water management. Especially the acquisition of various stream data in a certain location is very important to construct on alarm system to response an urban flood which occurs frequently due to the effect of climate change. Although the frequency of stream inundation flood occurrence becomes low owing to the consistent stream improvement, the urban flood due to the drainage system problems such as deterioration and bad management occurs continuously. The consistent management and current status understanding of the urban drainage system is essential to reduce the urban flood. The purpose of this study is to develop the urban runoff network flow velocity monitoring system which has the capability of collecting stream data whenever, wherever and to whomever without expert knowledge using Code Division Multiple Access technique and Bluetooth near-distance wireless communication technique. The urban runoff network flow velocity monitoring system consists of three stages. In the first stage, the stream information obtained by using ubiquitous floater is transferred to the server computer. In the second stage, the current state of the urban drainage system is assessed through the server computer. In the last stage, the information is provided to the user through a GUI. As a result of applying, the developed urban runoff network flow velocity monitoring system to Woncheon-Stream in Suwon, the information necessary for urban drainage management can be managed in real time.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
2002.10a
/
pp.253-256
/
2002
A hydrologic gauging network include a real-time measuring equipment was established within the Balhan watershed. Rainfall, stream water level, flow velocities were monitored at the six gauging stations. For stream flow gauging stations, the stage-discharge relationships were developed. The flow rate of the Balan watershed was 83.60% in 2001 and 48.79% in 2002.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.