• Title/Summary/Keyword: Stocks-and-Flows Diagram

Search Result 2, Processing Time 0.018 seconds

An Improvement of Coherence and Validity between CLD and SFD of System Dynamics (시스템 다이내믹스의 CLD와 SFD의 일관성 및 타당성 개선에 관한 연구)

  • Jung, Jae Un;Kim, Hyun Soo
    • Journal of Digital Convergence
    • /
    • v.12 no.6
    • /
    • pp.69-77
    • /
    • 2014
  • System Dynamics(SD) is one of the complexity theories that has attracted attention as a computer-aided simulation methodology to analyze a dynamic problem and to develop a policy(strategy) in social science. Though there are properly unproven cases in research models which were developed in various fields by SD methodology during the last five decades, they are utilized as models to represent SD sub-theories. For this reason, this study targeted the population dynamics model which was frequently utilized to explain SD fundamentals and it proved errors of reasoning a structure of the existing causal and dominant feedback loop. Consequently, we presented a strategy to strengthen the coherence between CLD(causal loop diagram) and SFD(stocks-and-flows diagram) for improving validity of the existing model. The findings of this study contribute to the advancement of the existing SD and to the reinforcement of validation for policy research models of SD.

Spatiotemporal chronographical modeling of procurement and material flow for building projects

  • Francis, Adel;Miresco, Edmond;Le Meur, Erwan
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.119-139
    • /
    • 2019
  • Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.