• 제목/요약/키워드: Steam Power Plant

검색결과 734건 처리시간 0.03초

화력발전소에서 응축수 회수계통의 증기배관 개선에 의한 발전시스템의 효율 향상 (The improvement of the efficiency of power plant by the reformation of steam line in the return system)

  • 권영수;서정세
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 추계학술대회논문집B
    • /
    • pp.867-871
    • /
    • 2001
  • The main reason for reviewing the condensate water return system in the auxiliary steam system is to obtain the thermal high efficiency of the power plant and thus save the fossil energy in power plant. This study intends to analyze the thermal efficiency of the power plant and predict the increasing in the generator output by the return system reformation of auxiliary steam line in the thermal power plant.

  • PDF

증기 원동소의 엑서지 손실에 관한 연구 (A Study on the Exergy Losses of Steam Power Plant)

  • 박재철;장문석;이창식
    • 설비공학논문집
    • /
    • 제1권3호
    • /
    • pp.235-243
    • /
    • 1989
  • The purpose of this paper is to obtain enthalpy balance and exergy analysis for the energy losses in a steam power plant. The enthalpy and exergy analysis of the steam power plant were carried out on the various output of steam turbine. While enthalpy analysis shows that circulating loss in the condenser is maximum, exergy evaluation of the power plant shows that the losses of the boiler and turbine are considerably larger than those of condenser and feed water heater. Most irreversible losses of the power plant occur at the boiler. For improving the performance, the precise study about the irreversible losses of the boiler is necessary.

  • PDF

타워용 태양열발전 시스템 흡수기 기술동향 (Technical Trend of Receiver for Solar Power Tower)

  • 김종규;김진수;이상남;강용혁
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 춘계학술대회 논문집
    • /
    • pp.161-164
    • /
    • 2008
  • For the development of solar thermal power tower plant from the early 80' to today, various kinds of receiver have been tested and evaluated. Most of 1st generation receiver used water/steam as a working fluid to operate steam turbine and now the first commercial solar power tower PS-10 also makes saturated steam. However, to increase thermal efficiency of storage system and to obtain practical use of solar energy, molten salt system have been used from THEMIS project in France at 1984. The Solar Tres plant of 17 MWe power generation will be constructed in Spain and have plan to operate 24 hours in summer. The air volumetric receiver system can be integrated with combined cycle of gas turbine and HRSG and also with steam turbine easily. Therefore, related researches to develop higher efficient solar power tower plant and to operate with stable are widely performed in the world.

  • PDF

북제주 화력 발전소 스팀 터빈 발전기용 인텔리전트 디지털 조속기 개발 (Development of Intelligent Digital Governor System for Steam Turbine Generator in Buk-Cheju Thermal Power Plant)

  • 전일영;하달규;신명철;김윤식
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 1999년도 전력전자학술대회 논문집
    • /
    • pp.608-613
    • /
    • 1999
  • This thesis aims at developing of a digita governor system for the steam turbine generator on the Buk-Cheju Thermal Power Plant of KEPCO. The steam turbine generator of the Buk-Cheju Thermal Power Plant is modelled. As a hardware platform, a triple modular system which is fitted 32-bit microprocessor of Motorola company to perform the digital governor system is used. The parameters of the PID controller algorithm in the speed control block is tuned on the basis of the estimated model.

  • PDF

증기발생기 파울링과 전기출력의 상관성 고찰 (A Study on the Relationship between Steam Generator Fouling and the Electric Power)

  • 조남철;신동만;김용식
    • 한국압력기기공학회 논문집
    • /
    • 제13권2호
    • /
    • pp.31-37
    • /
    • 2017
  • The heat transfer function or thermal performance is the most important function of the steam generator component in nuclear power plants. The declining of thermal performance, fouling does not affect the electric power of the nuclear power plant within a certain fouling level, but it affects the output when goes beyond the governor valve wide open of the turbine. The VWO steam pressure can be predicted through the thermal performance evaluation of steam generators in the nuclear power plant. In consideration of the fouling characteristics of the steam generator, methods of the thermal performance evaluation and fouling cases are reviewed, and also the critical VWO value is estimated through the actual thermal performance evaluation. It is necessary to apply the VWO theory based on the thermal performance of the steam generators.

원전 증기발생기 수위제어를 위한 MPC 제어기 개발 (The devlepment of a MPC controller for water level control in the steam generator of a nuclear power plant)

  • 손덕현;한진욱;이환섭;이창구
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.359-359
    • /
    • 2000
  • Generally, level control in the steam generator of a nuclear power plant is difficulty process control, because the low power operating can lead nonminimum phase characteristics(swell and shrink phenomenon) and flow measurement are unreliable and nonlinear characteristics. This paper presents a framework for solving this problem based on the constrained linear model predictive control and introduces the design of method for the level of the controller in the entire operating power of the steam generator, and compares with conventional PI controller.

  • PDF

울진1,2호기 출력최적화 및 증기발생기 교체가 주급수 제어계통 안정도에 미치는 영향연구 (Research on a Stability of Feedwater Control System after Stretched Power Uprate and Replacement Steam Generator for Ulchin Units 1&2)

  • 윤덕주;김인환;이재용
    • 한국압력기기공학회 논문집
    • /
    • 제8권2호
    • /
    • pp.14-20
    • /
    • 2012
  • Full load rejection capability of nuclear power plant depends primarily on steam dump capacity (SDCAP) and steam generator level control capability. Recently, Ulchin Units 1&2 have performed stretched power uprate (SPU) and replacement steam generator (RSG) projects, which increase the power by 4.5 percent. They change major design or operating parameters and especially reduces steam dump capacity at full power due to increase of the steam flow. The reduction of SDC after SPU results in degradation of heat removal capability in full load rejection transients. Therefore, we should perform evaluation to determine whether reactor trips occur in large load rejection transients. Uchin Units 1&2 have experienced full load rejection (FLR) three times from 2004 to 2010. Operating data from the plant occurrence of FLR at Ulchin Units 1&2 showed that steam generator (SG) level transients were limiting in point of reactor trip. However the plant had never reached reactor trip in the FLR and successfully continued in house load operation. The parameters and setpoints for the SG will be changed if the SG is replaced. Therefore, we evaluated the appropriateness of steam dump, main feedwater and steam generator water level control system preventing the plant from reactor trip in case of FLR by the parameter sensitivity study whether SG water level operated smoothly after SPU and RSG projects.

Load Test Simulator Development for Steam Turbine-Generator System of Nuclear Power Plant

  • Jeong, Chang-Ki;Kim, Jong-An;Kim, Byung-Chul;Choi, In-Kyu;Woo, Joo-Hee
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.1384-1386
    • /
    • 2005
  • This paper focuses on development of load test simulator of a steam turbine-generator in a nuclear power plant. When load is taken off from electrical power network, it is very difficult to effectively control the steam flow to turbine of the nuclear turbine-generator, because of disturbances, such as electrical load and network unbalance on electrical network. Up to the present time, the conventional control system has been used for the load control on nuclear steam generator, owing to the easy control algorithms and the advantage which have been proven on the nuclear power plant. However, since there are problems with stability control during low power and start-up, only a highly experienced operator can operate during those procedures. Also, a great deal of time and an expensive simulator is needed for the training of an operator. The KEPRI is developed simulator for 600MW nuclear power plant to take a test of generator load rejection, throttle valve, and turbine load control. Total load test is implemented before start up.

  • PDF

복합화력 발전플랜트의 근사 최적 열설계 해석 (Approximate Optimum Thermal Design Analysis of Combined Cycle Power Plant)

  • 전용준;신흥태;이봉렬;김동섭;노승탁
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 추계학술대회논문집B
    • /
    • pp.782-787
    • /
    • 2001
  • An optimum thermal design analysis of the combined cycle power plant with triple pressure heat recovery steam generator was performed by the numerical simulation. The optimum design module used in the paper is DNCONF, a function of IMSL Library, which is widly known as a method to search for the local optimum. The objective function to be minimized is the cost of total power plant including the steam turbine power enhancement premium. The result of this paper shows that the cost reduces if the design point of power plant becomes the local optimum, and many calculations at various initial conditions should be carried out to get the value near the global optimum.

  • PDF

Application of Dynamic Model for Steam Turbine and its Parameter Estimation in a Fossil Fired Power Plant

  • Choi, Inkyu;Woo, Joohee;Kim, Byoungchul;Son, Gihun
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제2권3호
    • /
    • pp.409-413
    • /
    • 2016
  • The 500 MW rated steam turbine model in coal fired power plant is developed to be used for validation and verification of controller rather than for the education of operator. The valve, steam turbine, reheater and generator are modeled and integrated into the simulator. And the data from the plant heat balance diagram are used for estimation of the model parameters together with actual operating data. It is found that the outputs of model such as pressure, temperature and speed are similar to the operating ones. So, it is expected that the developed model will play a very big role in controller development.