• Title/Summary/Keyword: Static Economic Dispatch

Search Result 3, Processing Time 0.018 seconds

An efficient dynamic load dispatch algorithm with Lagrange multipliers adjustment (라그랑지승수 수정에 의한 효율적인 동적부하배분 알고리즘)

  • 송길영;오광희;김용하
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.45 no.4
    • /
    • pp.467-473
    • /
    • 1996
  • This Paper presents a new algorithm to solve Dynamic Economic Dispatch problem. Proposed algorithm is composed of two computational modules; one is dispatch, the other adjusting module. In the dispatch module based on the traditional Static Economic Dispatch method, the power dispatch of each unit is calculated. And in case the results of dispatch module violate ramp rate constraints, Lagrange multipliers are adjusted in the adjusting module. Tests and computer results on test systems are given to show the efficiency of the proposed algorithm. (author). 11 refs., 6 figs., 4 tabs.

  • PDF

A Computation Method of B-coefficient With Static Voltage Dependent Load Model (정적 전압의존형 부하모델을 적용한 B계수 산정법)

  • Lee, Myung-Hwan;Chae, Myung-Suk;Shin, Joong-Rin
    • Proceedings of the KIEE Conference
    • /
    • 1997.11a
    • /
    • pp.218-220
    • /
    • 1997
  • In power system, economic dispatch problem is to minimize fuel cost with inequality constraints of generator output. To solve this problem it is very important to express power loss equation that have Quadratic function of generator power included B-coefficient. This paper presents a method in determining B-coefficient by use A-matrix that is calculated by power flow considering voltage dependent static load model. The proposed algorithm is tested with IEEE 6 bus sample system, which shows the result in each cases by the change of load component factor.

  • PDF

OPF with Environmental Constraints with Multi Shunt Dynamic Controllers using Decomposed Parallel GA: Application to the Algerian Network

  • Mahdad, B.;Bouktir, T.;Srairi, K.
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.1
    • /
    • pp.55-65
    • /
    • 2009
  • Due to the rapid increase of electricity demand, consideration of environmental constraints in optimal power flow (OPF) problems is increasingly important. In Algeria, up to 90% of electricity is produced by thermal generators (vapor, gas). In order to keep the emission of gaseous pollutants like sulfur dioxide (SO2) and Nitrogen (NO2) under the admissible ecological limits, many conventional and global optimization methods have been proposed to study the trade-off relation between fuel cost and emissions. This paper presents an efficient decomposed Parallel GA to solve the multi-objective environmental/economic dispatch problem. At the decomposed stage the length of the original chromosome is reduced successively and adapted to the topology of the new partition. Two subproblems are proposed: the first subproblem is related to the active power planning to minimize the total fuel cost, and the second subproblem is a reactive power planning design based in practical rules to make fine corrections to the voltage deviation and reactive power violation using a specified number of shunt dynamic compensators named Static Var Compensators (SVC). To validate the robustness of the proposed approach, the algorithm proposed was tested on the Algerian 59-bus network test and compared with conventional methods and with global optimization methods (GA, FGA, and ACO). The results show that the approach proposed can converge to the near solution and obtain a competitive solution at a critical situation and within a reasonable time.