• Title/Summary/Keyword: Standard unit cost

Search Result 197, Processing Time 0.022 seconds

Analysis on Housing Energy for Applying Geothermal System in Mongolia (몽골에서의 지열 시스템 적용을 위한 주택 에너지분석)

  • Kim, Jin-Ho;Kim, Joong-Hun;Shin, Seung-Ho
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.10 no.2
    • /
    • pp.19-23
    • /
    • 2014
  • In the capital of Mongolia where the air quality is getting worse due to the coal consumption used for electricity generation and district heating, the application of geothermal systems in the housing sector is recently designed for high class resort. In this study, the case of applying a geothermal system in a house in Mongolia is examined. The effects of passive house design on the needed heat pump capacity, as well as the annual energy consumption are analyzed. Moreover, as the initial costs, except labor fee, are assumed similar to Korea, cost analysis for several cases is examined, too. From the results, if a house is designed according to passive house standard instead of ASHRAE standard, the heat pump capacity can be expected to be reduced from 16 to 5~6 RT. Furthermore, although the initial cost of architectural cost might increased by 29 M\, the total initial cost is reduced by 14 M\, while the annual energy consumption is reduced by 14%. This is mainly driven by the fact that the geothermal system which serves as the main system to cover the building needs, with a high initial cost for fulfilling the peak requirements.

Macro-level Methodology for Estimating Carbon Emissions, Energy Use, and Cost by Road Type and Road Life Cycle (도로 종류와 도로생애주기별 탄소배출량, 에너지소모량 및 비용에 대한 거시적 분석방법)

  • Hu, Hyejung;Baek, Jongdae
    • International Journal of Highway Engineering
    • /
    • v.17 no.2
    • /
    • pp.143-150
    • /
    • 2015
  • PURPOSES : The authors set out to estimate the related carbon emissions, energy use, and costs of the national freeways and highways in Korea. To achieve this goal, a macro-level methodology for estimating those amounts by road type, road structure type, and road life cycle was developed. METHODS : The carbon emissions, energy use, and costs associated with roads vary according to the road type, road structure type, and road life cycle. Therefore, in this study, the road type, road structure type, and road life cycle were classified into two or three categories based on criteria determined by the authors. The unit amounts of carbon emissions and energy use per unit road length by classification were estimated using data gathered from actual road samples. The unit amounts of cost per unit road length by classification were acquired from the standard cost values provided in the 2013 road business manual. The total carbon emissions, energy use, and cost of the national freeways and highways were calculated by multiplying the road length by the corresponding unit amounts. RESULTS: The total carbon emissions, energy use, and costs associated with the national freeways and highways in Korea were estimated by applying the estimated unit amounts and the developed method. CONCLUSIONS: The developed method can be employed in the road planning and design stage when decision makers need to consider the impact of road construction from an environmental and economic point of view.

Evaluation of Menu Management and Nutrition Supply in Industrial Foodservice by Food Cost (식품원가 분류에 따른 산업체급식의 식단관리 및 영양공급량평가)

  • Park, Myung-Hee;Choi, Bong-Soon
    • Journal of the Korean Society of Food Culture
    • /
    • v.8 no.2
    • /
    • pp.91-101
    • /
    • 1993
  • Unit price of meal provision in industrial foodservice differs with each business. It is believed that menu management work, contents of menu, and nutrition supply performed by dietitian are different with unit price of meal provision. In this sense, purposes of this study are to examine meal management work and contents of menu, by food cost, at industrial foodservice in Taegu, Kyungbuk area and to evaluate variety of menu and nutrition supply. Results of the study are as follows: 1. Average number of side dishes provided at meal, including Kimchi, was 2 at low unit price, 3.0 at middle unit price and 3.1 at high unit price. 2. Possession ratio of account books using for menu management was low. 3. With regard to kind of menu, high unit price was most various and showed more various, compared to low unit price, especially in cooking oil-used cook methods such as broil, pan-fried food, fry, and roast. 4. High unit price was found as the highest in kind of used food and supply volume. 5. Sugar, Mineral, Vitamine, and Protein were satisfied with standard food content, but fat and calcium were not. 6. Supply volume of food was positively correlated to supply volume of nutrient, but kinds of cook methods and food type were not correlated to that of nutrient.

  • PDF

An Dynamic Optimal Allocation for the Stratified Randomized Response Technique (층화확률화 응답기법에 대한 동적 최적배분)

  • Son, Chang-Kyoon;Hong, Ki-Hak;Lee, Gi-Sung
    • Communications for Statistical Applications and Methods
    • /
    • v.16 no.4
    • /
    • pp.595-603
    • /
    • 2009
  • Typically the standard optimal allocation method distributes the sample for each stratum considering survey cost. In case of varying survey cost for each survey unit, we need to consider more practical allocation method. In other words, according to characteristics of an individual unit, we consider the optimal dynamic allocation method which first selects the survey unit having maximum value of benefit cost ratio. In terms of this, the proposed allocation method is different from standard optimal allocation method which allocate samples for each stratum and selects the random sample according to each size of sample. This paper is considered the dynamic optimal allocation method for the stratified randomized response technique which surveys for sensitive characteristic of survey units such as drug abuse, abortion, alcoholic. We prove the practical usefulness of proposed method using the numerical example.

A Case Study to Estimate the Unit Standard Infrastructure Cost in Levying the Korean Development Impact Fees (기반시설부담구역제에서의 표준단위설치비용 산정 사례연구)

  • Choei, Nae-Young
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.19 no.3
    • /
    • pp.127-136
    • /
    • 2011
  • The typical unit infrastructure cost estimation techniques adopted so far in implementing the Korean Impact Fee Zoning have rather been centered around the unilateral simple cost models. The techniques, as such, have frequently been criticized for their lack of flexibility in properly reflecting the regional differences as well as the peculiarities of individual development projects. The Ministry of Land, Transport, and Maritime Affairs (MLTM), in this regard, has recently introduced an enhanced alternative technique. Using the NGIS data, the study probes the viability of the MLTM's new technique by testing the entire estimation process based on the case area in Ansung City. Reflecting the City's characteristics, the study assumes a composite land use plan that accommodates the industrial area in addition to typical residential areas. As an extensive empirical case study, the research has found from the new technique considerable technical merits to overcome the existing shortcomings and summarized its significant policy implications.

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target (수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로)

  • Park, Hong Tae;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.328-335
    • /
    • 2012
  • The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.

Analysing Construction Cost Index Fluctuation on Apartment Housing (공동주택 건설공사비지수의 변동추세 분석)

  • Park, Won-Young;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.226-227
    • /
    • 2019
  • The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.

  • PDF

The Study of Rationality for Public Organizations' Cost Allocation Method (공공기관의 운영합리화를 위한 원가산정 방안에 대한 연구 -별정우체국을 중심으로-)

  • Park, Sung-Jong;Han, Kyung-Il
    • Journal of Digital Convergence
    • /
    • v.10 no.8
    • /
    • pp.91-96
    • /
    • 2012
  • The purpose of this study is to examine the rationality for public organizations' cost allocation method through the case of special post offices. The proper use of allocation method is crucial to promote and nurture the public organization sector. On that note, this paper presents how to apply the proper estimation method. The cost allocation method is to split the total expense into appropriate services and departments. Using the basic expense rate and the standard depreciation rate and area at each post office, the total cost is calculated into the cost per person and area. As a result, the correct cost can be assigned through allocation per according service unit.

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.

Estimating Standards and Cost Data for Modernized Korean Hosing (Hanok) (신한옥 건설 특성을 반영한 표준품셈 개발)

  • Kim, Suji;Kim, Min;Lee, Yunsub;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.66-75
    • /
    • 2016
  • As the demands for traditional Korean housing has been increased in recent years, modernized Korean traditional housing (Hanok) was developed as a way of providing Hanok for the public. Modernized Hanok attempts to remedy the shortcomings of the traditional hanok (i.e., high unit cost of building and low energy performance). In the previous researches, standardization and productivity improvement for modernized Hanok dissemination have been intensely developed. Above all, cost estimating for modernized Hanok is also an important factor. In an effort to provide effective system for Hanok construction, this paper developed 'standard cost data' for modernized Hanok. Distinct characteristic of modernized Hanok construction were analyzed first. Then, basic structure was identified, and major items were selected for Hanok standard cost data. However, this set of cost data was developed based on two mock-up Hanok projects actually constructed. Accordingly, this standard cost data will be further updated and modified by continuously accumulating real-world Hanok projects