• Title/Summary/Keyword: Standard recycling rate DB

Search Result 2, Processing Time 0.019 seconds

A Study on Monitoring System Architecture for Calculation of Practical Recycling Rate of End of Life Vehicle (폐자동차의 실질적 재활용률 산정을 위한 모니터링 체계에 관한 연구)

  • Park, Jung Whan;Yi, Hwa-Cho;Park, Myon Woong;Sohn, Young Tae
    • Clean Technology
    • /
    • v.18 no.4
    • /
    • pp.373-378
    • /
    • 2012
  • The end-of-life vehicles (ELV) are important recycling sources, and there are several stages involved in the recycling such as dismantling, shredding, and treatment of shredder residues (ASR). The legal recycling rate should be at least 95% on and after 2015, while we need a proper system to monitor recycling of ELV components and to calculate the practical recycling rate. The paper suggests a monitoring system that calculates practical recycling rates of dismantled components by use of a database of standard recycling rate as well as a web-based monitoring, which is linked to the Eco Assurance system for electric & electronic equipment and vehicle (EcoAS). Also the system supports dismantling and monitoring process by incorporating a standard vehicular component database, which facilitates recording dismantled weight data but also monitoring of dismantled components.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.