• Title/Summary/Keyword: Standard of construction estimate

Search Result 176, Processing Time 0.024 seconds

Realization of Smart Greenhouse Cost Using Greenhouse Structural Code and Greenhouse Construction Estimate (온실구조기준 및 온실공사 품셈을 활용한 스마트 온실 단가 현실화 연구)

  • Lee, Chul-sung;Kim, Hyuk;Shin, Seung-wook;Park, Mi-lan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.2
    • /
    • pp.29-36
    • /
    • 2022
  • This study analyzed the effects of building and greenhouse structural code on the structural design and the greenhouse construction cost. The over-design possibility of greenhouse was analyzed when building structural code was applied using standard smart greenhouse drawings. The possibility of decrease in greenhouse construction cost was investigated if the currently applied building structural code was replaced with greenhouse structural code. As a result of comparing the member sizes with the standard drawings, building structural code was designed with 13%~74% more steel than greenhouse structural code. When building construction estimate was replaced with greenhouse construction estimate, it was possible to reduce the total construction cost of the glass greenhouse by 17% and that of the vinyl greenhouse by 14%. Since there is no standard construction estimate suitable for greenhouses, the wage unit price is set excessively, and the construction cost of the smart greenhouse is increasing. In conclusion, it is necessary to establish greenhouse structural code and greenhouse construction estimate to lower the greenhouse construction cost.

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

A Study on the Changing Factors in Cost Estimate Standard for Reinforced Concrete Structure Maintenance (철근콘크리트 구조물 유지보수 공사비산정기준 개정요인에 관한 연구)

  • Song, Tae-Seok;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.315-316
    • /
    • 2021
  • The proportion of maintenance work has been increasing due to the recent aging of the infrastructure, but the standardized construction cost estimation standards are insufficient for this. In particular, reinforced concrete structures are being applied to many structures such as buildings and bridges, and various construction methods for maintenance of reinforced concrete structures are being developed and applied. In this study, we surveyed about the current status of the construction method for the maintenance work of reinforced concrete structures and analyze the factors of the revision of the construction cost estimate standard for the reinforced concrete structure maintenance.

  • PDF

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction - (공기산정 영향요인별 실적공기 비교분석 - 사무소 건축공사 공기산정기준을 중심으로 -)

  • Hwang Hyo-Sang;Kim Kyung-Rai;Suh Sang-Wook;Kim Chang-Duk;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.84-93
    • /
    • 2002
  • It is important to reduce construction duration in private sales and lease business for management of cash now in the owner's aspect. However, because the concept of standard duration hasn't been established in the domestic construction industry, it is difficult to present the standard of duration estimate. To solve this problem, this paper (1) grasped the effecting elements considered in the duration estimate through referring the existing literature related to the schedule management, (2) accomplished a comprehensive research on actual duration based on office buildings through the questionnaire survey and the expert interview, (3) presented the collected research data analyzed by effecting elements as standard duration, (4) compared standard duration with actual duration of countries advanced in construction projects as well as analyzed them, and then (5) raised the necessity of duration reduction in the domestic construction industry.

A Study on Factors Affecting Changes in Estimating Standards in Plaster Work (미장공사의 품기준 변화 요인에 관한 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.232-233
    • /
    • 2019
  • The plater work in the standard of estimate presents a variety of construction types. However, there is a part that does not fit the change of specification standards and on-site construction status, and it was revised in 2019's standard of estimate. In this study, we analyzed in detail the factors affecting the changes in estimating standards in the plater work. There were changes in the specification standards previously presented as primary coat, secondary coat, and formal coat as well as changes in on-site construction status such as thickness according to the number of plastering. Therefore, it is analyzed that the estimating standards can be classified by the number of finishes according to the site conditions by reflecting the analysis of the specification standards and site application status, and suggesting the finishing standards according to the number of plastering.

  • PDF

Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction (시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Min-Su;Ha, Jae-Hoon;Kim, Oe-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material (표준품셈 관부설 및 접합공사 품 개정 요인 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF

Analysis of Trends in the Labor Productivity and Actual Amount of Labor Input in the Reinforced Concrete Construction of Health Facilities (의료시설 철근콘크리트공사에서 생산성과 실투입 노무량의 추이에 관한 분석)

  • Jeong, Jae-Woong;Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.103-104
    • /
    • 2015
  • Process management of reinforced concrete construction that many labor quantity and cost is put at a construction site is very important and gives a lot of influence on the subsequent process. Thus, there will be only used as a useful tool for process control by medical facilities and trend analysis of the flow of the process by the amount of labor input and productivity in reinforced concrete construction. productivity by type and quantity, and comparative analysis. In addition, it is necessary to calculate the standard of estimate and real commitment to labor productivity by type and quantity, and comparative analysis.

  • PDF

How to Use Standard Market Prices for Ordinary Management System of Construction Equipment Prices in Poom-Saem (시가표준액을 활용한 건설공사표준품셈 건설기계가격 상시관리 방안)

  • Ahn, Bang-Ryul;Huh, Youngki;Kim, Dae Young;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.98-99
    • /
    • 2014
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Despite its importance, the construction equipment cost may not reflect the current market value since the equipment database is being updated every 6 years at most. To keep construction equipment cost up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a gap to adopt the standard market price system for the construction equipment cost computing system. Therefore, this paper suggests an effective way to develop a construction equipment cost estimation system.

  • PDF