Phase transition of Zirconia by surface treatments (지르코니아 표면 가공에 따른 상변이)

  • Lee, Jung-Soo;Shim, Jeong-Seok;Jung, Hyung-Ho
    • Journal of Technologic Dentistry
    • /
    • v.32 no.2
    • /
    • pp.57-63
    • /
    • 2010
  • Purpose : This study aimed to find out the effects of treatments on the surface of Zirconia. Methods : To this end, we selected six treatments that have been used widely: steam cleaning, 2bar & 6bar sand blasting, grinding by green stone point, grinding by diamond bur, and grinding by diamond bur with water spray. Results : The results of our study showed that monoclinic rate increased from all six treatments. Monoclinic rate varied by treatments, ranged from 0.6% (steam cleaning) to 6.5% (6bar sand blasting). These values from all six treatments were below ISO 13356 standard, which is 25%. Also, we found that two treatments (green stone point and diamond bur) increased roughness of surface of Zirconia. Conclusion : This study concluded that phase changes of Zirconia were not significant by using six treatments we employed.

A Study on Blasting Vibration Control Criteria for Pre-insulated Pipe through the Numerical Analysis (수치해석을 이용한 이중보온관 발파진동 관리기준에 관한 연구)

  • Choi, Bong-Hyuck;Cho, Jin-Woo;Kim, Jin-Man;Yoo, Han-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1471-1478
    • /
    • 2013
  • In this paper, numerical analysis with varying distance and burial depth was performed to recommend the blasting vibration control standard for pre-insulated pipes. The blasting load model applied in the numerical analysis was verified to the comparison with the results of the field tests. It was determined from the results of the numerical analysis that the effective stress either exceeds or approaches the allowable stress of the inner steel pipe for vibration velocity greater than 4.0cm/sec while stability is obtained for vibration velocity below 4.0cm/sec. Therefore, it was determined that the blasting vibration control criteria for pre-insulated pipes must not exceed 4.0cm/sec.

A Study on Blasting Aspect of Steel Member and Concrete Member According to Separation distance of Explosives (폭약 이격에 따른 강판과 콘크리트 부재의 파괴양상 연구)

  • Yang, Hyung-Sik;Kim, Jung-Gyu;Ko, Young-Hun;Noh, You-Song;Shin, Myeong-Jin
    • Explosives and Blasting
    • /
    • v.32 no.1
    • /
    • pp.1-9
    • /
    • 2014
  • TNT was blasted on the surface of steel plates and concrete block to study the effect of separation distance between object and charge. The equation of US Army Corps of Engineers turned out to be rather conservative. Effect of separation distance is larger for steel plate than concrete block. Steel plate cannot be cut by standard or more charge in the case of 2 cm separation while the concrete block can be crushed with the same distance.

Displacement and Stress Monitoring for Excavation Deep Foundation (인접지역의 깊은 터파기 굴착에서 변위 및 응력의 계측)

  • 원연호
    • Explosives and Blasting
    • /
    • v.17 no.1
    • /
    • pp.27-55
    • /
    • 1999
  • The excavation works for deep foundation in urban areas have recently increased complaints of blasting vibration and settlement of ground level. Foundation must be excavated approximately up to 24-28m depths from the surface. The roads and subway line pass through the excavation area. The Dae-chung station is also located at the nearest distance 5-35m from the working site. To protect subway station and adjacient some structures from blasting and settlement, the level of ground vibration, displacements and stress were monitored and analyzed. The results can be summarized as follows ; 1. An empirical particle velocity equation were obtained by test blasts at Nassan Missi 860 Office tel construction site. $V{\;}={\;}K(D/\sqrt{W})^{-n}$, where the values for n and k are estimated tobe 0.371 and 1.551. From this ground vibration equation, the max. charge weight per delay time against distance from blasting point is calculated. Detailed blasting method is also presented. 2. To measure the horizontal displacement in directions perpendicular to the borehole axis, 6 inclinometers installed around working sites. The displacement at the begining was comparatively high because the installation of struts was delayed, but after its installation the values showed a stable trend. Among them, the displacement by 3 inclinometers installed on a temporary parking area showed comparatively high values, for example, the displacement measured at hole No. IC-l recoded the max. 47.04mm for 6 months and at hole No. IC-2 recorded the max. 57.33mm for 7 months. So, all of these data was estimated below a safe standard value 103mm. 3. Seven strain gauge meter was installed of measure the magnitude and change of stress acted on structs. The measured value of maximum stress was $-465{\;}kgf/\textrm{cm}^2,{\;}-338.4{\;}kgf/\textrm{cm}^2,{\;}302.3{\;}kgf/\textrm{cm}^2$ respectively. In compareto the allowable stress level of steel, they are estimated to be safe.

  • PDF

A Study on the Standard Rock fracture Method Using the Finecker Plus (미진동파쇄기를 이용한 표준암반반쇄굴착공법에 관한 연구)

  • Kim Young-Geun;Kim Il-Jung;Ki Kyung-Chul
    • Explosives and Blasting
    • /
    • v.23 no.1
    • /
    • pp.19-30
    • /
    • 2005
  • In this study, the standard particle velocity equations and the equation for calculating specific charge weight with application of rock fracture method using the finecker plus are suggested and the existing equation of fragmentation was transformed into one applicable to finecker plus. Standard rock fracture pattern was designed. Square root scaled equation is $V=345.39(D/\sqrt{W})^{-1.4484$. computable equation to specific charge wei인t is $W_f=(2.3\~2.5)\;f_agdV$, charge weight per hole is 0.54kg, and proportion of diameter 30cm fragmentation is about $48.7\%$. This rock fracture method nay him out to be more excellent than the other methods.

A Evaluation of Standard Support Pattern for Two-Arch Road Tunnel (2-Arch 도로터널에 적용된 표준지보패턴의 적정성 검토)

  • Chun, Byungsik;Choi, Kwangbo;Kim, Hyeyang;Yoo, Junhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.7
    • /
    • pp.25-35
    • /
    • 2008
  • In domestic cases, the standard support pattern of 2-lanes road tunnels is presented because construction experience and high degree various data was abundant. But, it is not desirable to apply standard for 2-Arch tunnels that the precedent and measuring data is insufficient existing support pattern blasting plan and interpretation of separate way concerning specific terrain and rock quality. In this study, behavior according to load distribution ratio and Unsymmetrical Pressure about standard support pattern which is applied in design and construction of 2-arch tunnels was analysed and the examination of blasting vibration has influence on the center wall is conducted as a consequence reasonableness of support whether or not with presumed support pressure and ground reaction curve method. In result appropriateness of standard support pattern, support quantity is proper but considers specific terrain and rock quality condition when design and construction of further step 2-arch tunnel standard support pattern must be decided by considering terrains, soil properties and construction condition of the objective tunnel.

  • PDF

A Study on Practicalization of Low Vibration New KINRECKER-II (미진동 발파용 New KINECKER-II 실용화에 관한 연구)

  • Jang, Seung-Ho;Park, Hee-Won;Lim, Jung-Hyuk;Lee, Chang-Yeop;Ahn, Bong-Do;Kang, Dae-Woo;Lee, Ha-Young
    • Explosives and Blasting
    • /
    • v.35 no.1
    • /
    • pp.43-52
    • /
    • 2017
  • Mountain and hill areas occupy by more than 70% in South Korea and Rock drilling should be applied in order to reduce noisy & vibration from massive civil engineering business such as road expansion, high-way construction, subway construction and construction of site renovation such as a newly-built & re-development of apartment, newly-built of high-rising building in downtown area. As Blasting noise & vibration such as vibration, noise, fly rock etc caused by blasting operation from large small scale construction occurs, neighboring residents who demand the compensation file a civil complaint so that the business reach a deadlock. As the excavation method for these areas, There are blasting of micro-vibration, mechanical excavation method(Rock splitter, Breaker etc), similar blasting method(plasma, gel fragmentation etc) to date. In this study, we are trying to find the feature & performance which get improved economic feasibility & construct ability through improving sympathetic detonation of New KINECKER-I used in blasting of micro-vibration & formulation and would provide convenience for use by introducing standard blasting pattern & construction method. Also, checked and confirmed all the blasting with connecting cap has been cleary detonated.

Establishment of a Safe Blasting Guideline for Pit Slopes in Pasir Coal Mine (파시르탄광의 사면안전을 위한 발파지침 수립 연구)

  • Choi, Byung-Hee;Ryu, Chang-Ha;SunWoo, Coon;Jung, Yong-Bok
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.418-426
    • /
    • 2008
  • A surface blasting method with a single tree face is currently used in Pasir Coal Mine in Indonesia. The single free face is usually the ground surface. This kind of blasting method is easy to use but inevitably causes enormous ground vibrations, which, in turn, can affect the stability of the slopes comprising the various boundaries of the open pit mine. In this regard, we decided to make a specific blasting guideline for the control of found vibrations to ensure the safety of the pit slopes and waste dumps of the mine. Firstly, we derived a prediction equation for the ground vibration levels that could be occurred during blasting in the pits. Then, we set the allowable levels of ground vibrations for the pit slopes and waste dumps as peak particle velocities of 120mm/s and 60mm/s, respectively. From the prediction equation and allowable levels, safe scaled distances were established for field use. The blast design equations for the pit slopes and waste dumps were $D_s{\geq}5\;and\;D_S{\geq}10$ respectively. We also provide several standard blasting patterns for the hole depths of $3.3{sim}8.8m$.

Review of National Standards for Allowable Limit of Blast Vibration on Structures (구조물에 대한 국외 발파진동 허용 규제기준 분석)

  • Ryu Chang-Ha
    • Explosives and Blasting
    • /
    • v.23 no.3
    • /
    • pp.1-10
    • /
    • 2005
  • Blast-induced ground vibration nay cause an environmental impact such as neighbour's complaints or damage on adjacent structures and facilities. Complaints associated with blasting have often become a target of public grievances. One of the difficulties to solve the problem is that we do not have a national standard for the acceptance level of blast-induced ground vibration. A peak particle velocity criterion, which was suggested for urbane underground construction, has often been widely used. Efforts have been made to establish more rational criteria. It seems that differing cultures have often differing thresholds of the toleration of vibration, and that technical data or rational grounds for establishing the limits are hardly provided. In this paper, national standards for allowable limit of blast vibration were presented and discussed.

Structural response of concrete gravity dams under blast loads

  • Sevim, Baris;Toy, Ahmet Tugrul
    • Advances in concrete construction
    • /
    • v.9 no.5
    • /
    • pp.503-510
    • /
    • 2020
  • Concrete dams are important structures due to retaining amount of water on their reservoir. So such kind of structures have to be designed against static and dynamic loads. Especially considering on critical importance against blasting threats and environmental safety, dams have to be examined according to the blast loads. This paper aims to investigate structural response of concrete gravity dams under blast loads. For the purpose Sarıyar Concrete Gravity Dam in Turkey is selected for numerical application with its 85 m of reservoir height (H), 255 m of reservoir length (3H), 72 m of bottom and 7 m of top widths. In the study, firstly 3D finite element model of the dam is constituted using ANSYS Workbench software considering dam-reservoir-foundation interaction and a hydrostatic analysis is performed without blast loads. Then, nearly 13 tons TNT explosive are considered 20 m away from downstream of the dam and this is modeled using ANSYS AUTODYN software. After that explicit analyses are performed through 40 milliseconds. Lastly peak pressures obtained from analyses are compared to empirical equations in the literature and UFC 3-340-02 standard which provide unified facilities criteria for structures to resist the effects of accidental explosions. Also analyses' results such as displacements, stresses and strains obtained from both hydrostatic and blasting analysis models are compared to each other. It is highlighted from the study that blasting analysis model has more effective than the only hydrostatic analysis model. So it is highlighted from the study that the design of dams should be included the blast loads.