• 제목/요약/키워드: Standard Schedule

검색결과 231건 처리시간 0.026초

건축공사 안전관리비 비율 산정 모형에 관한 연구 (A Study on the Estimating Rate of Safety Management Cost in Building Work)

  • 손기상;갈원모;양학수
    • 한국안전학회지
    • /
    • 제22권5호
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

건설공사 상대적 위험도 산정 (Estimating Relative Risk Level of Construction Work)

  • 손기상;양학수;갈원모
    • 한국안전학회지
    • /
    • 제21권5호
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

야간전담간호사와 3교대간호사의 표준 교대근무 지표(Standard Shiftwork Index) 차이 (A Comparison of Standard Shiftwork Index between Night Shift Fixed Nurses and Rotating Shift Nurses)

  • 김정희;김명숙;김연희
    • 임상간호연구
    • /
    • 제23권1호
    • /
    • pp.54-63
    • /
    • 2017
  • Purpose: The purpose of this study was to compare the working status and Standard Shiftwork Index (SSI) between night shift-fixed nurses and rotating shift nurses. Methods: Participants were 367 nurses working as registered nurses at 7 different medical institutions. The data were collected from August 8, 2016 to September 30, 2016. Results: Night shift fixed nurses were more satisfied with work schedule than rotating shift nurses. Rotating shift nurses reported higher SSI scores, such as chronic fatigue, musculoskeletal problems, than night shift fixed nurses. In SSI's sub-items, rotating shift nurses reported higher scores, such as the amount of sleep, feeling well after sleep, heartburn or stomach-ache and heartbeat irregularities, than night shift fixed nurses. Conclusion: The results indicated that night shift fixed system might be an effective method to improve nurses' work satisfaction. It is necessary to figure out any suitable night shift fixed system based on the characteristics of each nursing organization. The SSI might be an useful tool to measure the nurses' satisfaction in reference to their work shift.

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

A Study on the Performance Improvement of Message Transmission over MVB(Multifunction Vehicle Bus)

  • Choi, Myung-Ho;Park, Jae-Hyun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2003년도 ICCAS
    • /
    • pp.2198-2202
    • /
    • 2003
  • The data transmission of MVB(Multifunction Vehicle Bus) of TCN(Train Network Communication) is divided into the periodic transmission phase and the sporadic transmission phase. TCN standard defines the event-polling method for the message transfer in the sporadic phase. However, since the event-polling method does not use pre-scheduling to the priority of the messages to be transmitted, it is inefficient for the real-time systems. To schedule message transmission, a master node should know the priority of message to be transmitted by a slave node prior to the scheduling the sporadic phase, but the existing TCN standard does not support any protocol for this. This paper proposes the slave frame bit-stuffing algorithm, with which a master node gets the necessary information for transmission scheduling and includes the simulation results of the event-polling method and the proposed algorithm.

  • PDF

TCN을 통한 메시지 전송 능력 향상에 관한 연구 (Performance Improvement of Message Transmission over TCN(Train Communication Network))

  • 최명호;문종천;박재현
    • 대한전기학회논문지:시스템및제어부문D
    • /
    • 제53권10호
    • /
    • pp.720-726
    • /
    • 2004
  • The data transmission over MVB(Multifunction Vehicle Bus) of TCN(Train Communication Network) is divided into the periodic transmission phase and the sporadic transmission phase. TCN standard recommends the event-polling method as the message transfer in the sporadic phase. However, since the event-polling method does not use pre-scheduling to the priority of the messages, it is inefficient for the real-time systems. To schedule message transmission, a master node should know the priority of message to be transmitted by a slave node prior to the sporadic phase, but the existing TCN standard does not support any protocol for this. This paper proposes the slave frame bit-stuffing algorithm, with which a master node gets the necessary information for scheduling and includes the simulation results of the event-polling method and the proposed algorithm.

공동주택 공사의 작업간 간섭 감소 방안에 관한 연구 (A Study on the Measures for Work Interference Reduction in Apartment Construction)

  • 안성훈;김준호;강경인
    • 한국건축시공학회지
    • /
    • 제6권1호
    • /
    • pp.117-122
    • /
    • 2006
  • Apartments construction is a one of largest parts in buildings construction. In apartments construction, work interferences are frequently occurred in work processing because workspaces are very various and numerous. However, though work process is important for mainly influencing to the schedule, quality and cost of apartments construction, these work interferences are considered a kind of uncertainty, which is difficult to anticipate at construction planning stage, in work processing. Therefore, this study proposed the measures for work interference reduction in apartment buildings construction and the actual planning for practices. The results can be summarized as follows: (1) the standard of work process is checked regularly. (2) The scope of work and work process is adjusted. (3) The standard of drawings process and cost about work interferences work profess is established.

제조업 생산능력 측정의 기준과 모델의 개발 (Development of a model and criteria for production capacity measurement of manufacturing industry)

  • 유일근;조성기
    • 경영과학
    • /
    • 제13권3호
    • /
    • pp.143-161
    • /
    • 1996
  • For an industry, production capacity is defined as the maximum level of output that plants can maintain within the framework of a realistic work schedule, taking account of normal downtime, and assuming sufficient availability of inputs to operate machinery and equipment in place. Such capacity is one of the important and basic due to measure, manage and evaluate the production performance and ability of any industrial bodies. However, the estimating methods now in use in Korea are seemed far from the definition above. And there are not any standard estimating method suggested even in the same sort of manufacturing and also no applicable theory for objective and exact measurement. Thus, in this paper, a new measuring model is suggested as standard and supporting theories are developed for general measurement purpose to any manufacturing industries.

  • PDF

다목적 전술차량의 주행내구도 시험 절차 및 검증 (Endurance test procedure and validation of Multipurpose tactical vehicle)

  • 정의봉;강동석;최지호;김한생;최만식
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2014년도 추계학술대회 논문집
    • /
    • pp.256-261
    • /
    • 2014
  • Endurance test procedures of multipurpose tactical vehicle is constructed by comparing the Korea defence standard and TOP-2-2-506. The plan was to make the best reflect the operational environment and the actual production purposes. Endurance test of multipurpose tactical vehicle more stringent than the existing other military vehicles validation procedures. But the test plan, it is possible to reduce the cost and schedule of long verification that occurs because of the Endurance test. Through a comparison of the dynamic characteristic analysis, change of test center was to ensure the reliability and validity.

  • PDF

통신부문 표준품셈 환경개선에 관한 연구 (A Study on the Environmental Improvement for the enacting Standard of Construction Estimate in Communication Field)

  • 설동화;이광희
    • 정보통신설비학회논문지
    • /
    • 제2권2호
    • /
    • pp.5-13
    • /
    • 2003
  • This paper suggests an environmental improvement scheme for the enactment and revision process of the standard of construction estimation in communication field. The first subject is a simplification of process on the enactment and revision. It can be achieved by transfer the function to the professional board from the subordinate council. The second process is an adoption of tentative step on enactment and revision. And the last subject is creation of maintenance part. All the improvement shall be carried on in long term schedule and on the sufficient financial support from government.

  • PDF