• Title/Summary/Keyword: Standard Construction Process

Search Result 590, Processing Time 0.026 seconds

A Study on the Standard Joint Material and Reference Plane for the Standard of Construction in the Apartment (공동주택 시공표준화를 위한 조립기준면 및 표준마무리재에 관한 연구)

  • Lim, Seok-Ho;Park, Keun-Soo;Lee, Ga-Kyung
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.230-235
    • /
    • 2009
  • In our country, the application of the design method of face to face dimension in wall-slab apartment has passed 10 years. So MC design method has fixed in the design step to some degree. In Design and Work Execution of House the exclusive area of the apartment was calculated by face to face dimension. And the term of face to face dimension was known broadly to clients, construction company, etc. But design method of face to face dimension is not to simply extend the room size so far as wall depth in design process but to ensure the actual space should be considered with efficient use and assembly of building components. That is to say, Design method of face to face dimension is not to be defined by design step but to be related with construction and maintenance. However in construction process the point of face to face design method was not understood even now. So the purpose of this study was to extract the effect and question of face to face design method in construction process by survey of actual condition of structure and construction quality, and compare this result with existing construction method. The following project of this study is to survey of actual condition of interior components such as gypsum board, windows & doors etc. Therefore this study is to induce architectural long-life through architectural standardization construction and component's exchange, and, by the subject of the study on Apartment to have design guideline and basis for joining part between Gypsumboard and windows.

  • PDF

A Study on the Standard Joint Material and Reference Plane for the Standard of Construction in the Apartment - Joining Part between Gypsumboard and Windows - (공동주택 시공표준화를 위한 조립기준면 및 표준마무리재에 관한 연구 - 석고보드 마감재와 창호재의 접합부위를 중심으로 -)

  • Lim, Seok-Ho;Park, Keun-Soo;Lee, Ga-Kyung
    • Journal of the Korean housing association
    • /
    • v.20 no.4
    • /
    • pp.31-38
    • /
    • 2009
  • In our country, the application of the design method of face to face dimension in wall-slab apartment has passed 10 years. So MC(Modular Coordination) design method has fixed in the design step to some degree. In Design and Work Execution of House the exclusive area of the apartment was calculated by face to face dimension. And the term of face to face dimension was known broadly to clients, construction company, etc. But design method of face to face dimension is not to simply extend the room size so far as wall depth in design process but to ensure the actual space should be considered with efficient use and assembly of building components. That is to say, Design method of face to face dimension is not to be defined by design step but to be related with construction and maintenance. However in construction process the point of face to face design method was not understood even now. So the purpose of this study was to extract the effect and question of face to face design method in construction process by survey of actual condition of structure and construction quality, and compare this result with existing construction method. The following project of this study is to survey of actual condition of interior components such as gypsum board, windows & doors etc. Therefore this study is to induce architectural long-life through architectural standardization construction and component's exchange, and, by the subject of the study on Apartment to have design guideline and basis for joining part between Gypsumboard and windows.

Construction of an International Standard-Based Plant Data Repository Utilizing Web Services Technology (웹 서비스 기술을 활용한 국제 표준 기반의 플랜트 데이터 저장소의 구현)

  • Mun, Du-Hwan;Kim, Byung-Chul
    • IE interfaces
    • /
    • v.23 no.3
    • /
    • pp.213-220
    • /
    • 2010
  • As the market becomes increasingly globalized and competition among companies increases in severity, various specialized organizations are participating across the process plant lifecycle, including the stages of design, construction, operation and maintenance, and dismantlement, in order to ensure efficiency and elevate competitiveness. In this regard, it is an important technical issue to develop services or information systems for sharing process plant data among participating organizations. ISO 15926 is an international standard for integration of lifecycle data for process plants including oil and gas facilities. ISO 15926 Part 7, a part of the ISO 15926 standard, specifies an implementation method called a facade that uses Web Services and ontology technologies for constructing plant data repositories and related services, with the aim of sharing lifecycle data of process plants. This paper discusses the ISO 15926-based prototype facade implemented for storing equipment data of nuclear power plants and servicing the data to interested organizations.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

Diagnosing communication management using SW-CMM concept (SW-CMM 개념을 활용한 의사전달관리의 진단)

  • Lee, Seon-Gi;Park, Jeong-Ha
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.15-20
    • /
    • 2003
  • Construction industry recognizes the necessity to manage is business from viewpoint of processes, and consider developing, evaluating and improving standard processes as important managerial target. SW-CMM provides basic framework for this process management. However, appropriate tailoring and adjustment are essential for SW-CMM concept to be applied to construction business. SW-CMM makes construction manager understand the capability of business process, based on which the priority of process improvement is judged. The capability is prescribed by common features. This paper introduces the basic frame for diagnosing construction business processes with SW-CMM, and presents the case study of analysing processes focusing on communication management.

  • PDF

Automation Review of Road Design Standard using Visual Programming (비주얼 프로그래밍 기법을 활용한 도로설계기준 자동검토 방안)

  • Hyoun-seok Moon;Hyeoun-seung Kim
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.891-898
    • /
    • 2022
  • Purpose: There is not much time left for mandatory BIM implementation for all sectors and stages of the construction industry. Therefore, it is necessary to find a way to secure technology to substantially improve the productivity of BIM work. In the research, we proposed a method to automatically verify related construction standards for major objects produced by BIM modeling procedures so that engineers can verify construction standards in the BIM-based design process. Method: We defined a modeling work procedure for BIM-based road design work and prepared a method for constructing related design standards in a database. In addition, a process map for developing a BIM-based design basis review automation system was also presented. Result: A BIM-based design standard review automation module was developed using Civil3D and Dynamo. And it was confirmed by the test application that it is possible to quickly judge whether the BIM object manufactured in the design process conforms to the construction design standard. Conclusion: BIM-based design standard review automation technology can improve the productivity of BIM model production work and secure the quality of the BIM model.

A Study on the Improvement of Amending Process and Depreciation Measurement Method of the Standard Estimating System (건설공사 표준품셈 제.개정 프로세스 개선 및 손율산정방안에 관한 연구)

  • Ahn, Ji-Sung;Lee, Jeong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.481-486
    • /
    • 2008
  • Standard Estimating System, which can be used for estimating a construction cost, has been pointed out having some problems such as non-reflecting a variety of construction environments and site conditions, non-adapting new technologies and methods since it was established in 1970. For solving these problems, the Korean Institute of Construction Technology(KICT) has chosen organizations for amending Standard Estimating System. However they have had many mistakes in the process of amending works because of non-establishing amending process and absence of the depreciation measurement method. This research derived the necessity to improve the amending process of the Standard Estimating System, and presented the detailed amending process and the performing method in the each process. Furthermore, this research proposed the depreciation measurement method available for the construction industry by means of analyzing researches that performed in the manufacturing industry and the measurement method for depreciation of general accounts.

  • PDF

Case Study and Standard Process Analysis of Change Order in Design for Road Tunnel Project (터널공사 사례분석에 의한 설계변경 표준프로세스 구성방안)

  • Kang Leen-Seok;Kim Dong-Kwang;Jung Won-Myoung;Lee Seung-Ryul;Kim Hyun-Soo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1149-1152
    • /
    • 2005
  • Recently, tunnel structure is being widely used in railway or roadway construction projects because earthwork causes large cutting and damages in environmental factors. However, there are many changes of design by different items comparing with design phase in tunnel structure by uncertain drawings. This study develops a standard process for the change of design to reduce change orders in construction phase.

  • PDF

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

Development Process and Field Application Performance Analysis for Rebar Reinforcing Clips (RCC Device) to Improve Workability of 135 Degree Standard Hook (135°표준갈고리 작업성 향상을 위한 철근보강클립 (RCC장치) 개발과정 및 현장적용 성과분석)

  • Kim, Yongjoo;Kim, Eunyoung;Song, Hwajun;Park, Kyoungyeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.138-146
    • /
    • 2021
  • 135 Degree standard hook workability crossed in the Reinforced Concrete (RC) Structure is improved and it reinforces in one side 90° hook binding. As a result, we proposed a One-touch Rebar Reinforcing Clip(RCC Device) that demonstrates the same performance as the 135° standard hook. It was developed through the evaluation of construction and economic analysis. As a result of analyzing 13 sites applied from June 2020, As expected, most of the cases were applied to the structural supervision or the point of the construction supervisor as an irresistible measure. therefore, Through field performance analysis, Various methods such as the method that the original contractor first purchases and then provides after contract with the partner company were proposed for the use of efficient and voluntary reinforcing clip. As a result, It is expected that the contribution in the field will be very high in terms of quality and process management through active utilization.