• 제목/요약/키워드: Standard Construction Period

검색결과 202건 처리시간 0.027초

소음스트레스에 의한 산난계의 피해상황 연구 (The effect of sound stress on laying hen performance)

  • 신창호;한귀섭;박현기;이용범
    • 한국동물위생학회지
    • /
    • 제23권3호
    • /
    • pp.263-269
    • /
    • 2000
  • This study was carried out to set a standard of damage compensation by researching state of damage due to noises in laying and prelaying hens. Recently, there are many damage cases in chicken farms near construction site that were caused by noises of construction. Therefore disputes and complaints about economical loss have increased ceaselessly. But we have few research and report such a thing. The result have shown that the weight loss rate was ranged from 9.48% to 23.2% and mortality of laying period of hens was higher than prelaying period. Pathological findings were fatty liver, congestion and hemorrhage of intestine, erosion of proventriculus and gizzard in order of case frequency. And these signs in hens of laying period was more serious than prelaying period. Half-life rate of antibody titers against Newcastle disease and infectious bronchitis in sound stressed hens was no different compared with non-stressed hens. Egg production rate dropped from 38% to 45% according to strength of noises. Before being stressed, hens produced special, large, middle, small-size eggs in the order. But after being stressed, their egg Production rate of middle, small-size Increased while egg production rate of special, large-size decreased. Production rate of soft and broken shell eggs was 0.015% in the stressed flocks higher than 0.005% in the non-stressed flocks.

  • PDF

한중콘크리트의 관리재령 연장을 이용한 설계기준강도 확보 기법 (Designed compressive strength assurance method within 28 days of management period for winter period concrete contain various SCMs)

  • 이영준;이혁주;한준희;이상운;이정교;한민철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.169-170
    • /
    • 2018
  • The purpose of the research is suggesting the temperature compensation strength for Unicode of constructure standard from Ministry of land, infrastructure and transport. As a result, for the concrete mixture with 100 % OPC, 6, and 3 MPa of compensating strength values were necessary when the temperature were from 4 to 9℃, and from 9 to 17℃, respectively. Additionally, when the temperature was higher than 17℃, compensating strength value was not necessary. In the case of 20 % of blast furnace slag replaced concrete mixture, 9, 6, and 3 MPa of compensating strength values were necessary when the temperature were from 4 to 6℃, from 6 to 12℃, and higher than 17℃, respectively.

  • PDF

적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안 (Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석 (Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work)

  • 방종대;손정락
    • 토지주택연구
    • /
    • 제8권3호
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

후각센서 사용에 의한 콘크리트 구조물의 품질평가에 관한 기초적 연구 (Basic Study on Quality Assurance of Concrete Structure by using Odor Sensor)

  • 시로카도 요시츠구;카가야 마코또;이상훈
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2010년도 정기 학술발표대회
    • /
    • pp.42-42
    • /
    • 2010
  • In order to assure the quality of concrete structure in construction process, the odor strength measured by using odor sensor was used to evaluate curing effect. Then, the compressive strength and odor strength in ordinary concrete N were shown in water curing(=standard curing), indoor and outdoor atmospheric curing condition. The difference between odor strength in the standard curing and that in each curing condition was defined as the difference in the odor strength. And the difference in odor strength in slag powder concrete BP cured in water curing(=standard curing) for different period before exposing in outdoor atmosphere in winter season were evaluated at the age of 14 days. A necessity to prolong the moisture curing for the slag powder concrete BP compared with the ordinary concrete N to obtain a required curing effect was shown by measuring the odor strength and long term compressive strength.

  • PDF

건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석 (CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager)

  • 양진국;홍성욱
    • 대한건축학회논문집:구조계
    • /
    • 제36권3호
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

인테리어 공사비 산정에 영향을 주는 변동요인에 관한 연구 (A Study on the fluctuation Factors Influenced on the Computation of interior Cost)

  • 정재은;권영성
    • 한국실내디자인학회논문집
    • /
    • 제16호
    • /
    • pp.75-81
    • /
    • 1998
  • With the rise of the economic level and the improvement of the standard of living the size of the interior work is becoming large and specialized, With the recent opening of the domestic interior decoration market the order of the large-scale interior decoration work is actively received and its efficient construction is vigorously made. Accordingly reliability is required in keeping with all the accuracy of computing interior construction expenses systematically is importantly emerging. The estimation sheet written in a kind of process mode and in an area made as the construction expense breakdown mode were statistically treated and analyzed as well as quantity computation breakdown data. In determing the major factors that expert an influence on the factors of changes in construction expenses as well as the compositional ratio of construction work that becomes basic material for developing the cost model of interior decoration work the following conclusion could be made: Improvement should be made to suit the present situation by synthesizing and arranging the data practically used in current interior construction expenses. Required construction expenses for the kind of work common to each construction field are showing a given proportion and the required construction expenses of rather small scale interior construction work tend to be irregular. It is necessary to compute optimal construction expenses by calculating the optimal period of work and working personnel in consideration of the influential factor in each work.

  • PDF

강관다단 그라우팅에 적용하는 속경성 실링재 개발 (Development of rapidly hardening seal material applicable to steel pipe multistage grouting)

  • 신현강;정혁상;김동현;유용선;김동훈
    • 한국터널지하공간학회 논문집
    • /
    • 제21권2호
    • /
    • pp.301-321
    • /
    • 2019
  • 본 논문에서는 강관다단 그라우팅에 적용하는 속경성 실링재 개발에 관한 실험적 내용을 다루었다. 강관다단 그라우팅 공법에서 실링재는 본 주입재의 주입시 역류를 방지하기 위해 주입하며 주입 후 일정시간이 지난 다음 겔화 상태에서 본 주입재를 주입해야 한다. 그러나 주입된 실링재가 겔 상태가 되기 이전 유동성이 있을 경우 본 주입재와 함께 혼합됨은 물론, 주입재의 역류가 발생되어 원지반으로 주입이 곤란하며, 반대로 너무 시간이 지나 겔화단계를 넘어 고결되었을 경우 본 주입재가 지반내로 주입되지 못하는 경우가 발생된다. 실링재의 유동성이 없어져 겔화 상태로까지 걸리는 시간에 따라 강관다단 그라우팅의 공사시간이 결정되며, 이는 전체 터널의 공사기간과 밀접한 관련이 있어 중요한 요소 중에 하나이다. 따라서 본 연구에서는 실링재 본연의 역할과 기능을 할 수 있을 뿐 아니라 공사기간을 단축시킬 수 있도록 실링재의 겔화시간을 단축시킬 수 있는 칼슘알루미네이트 재료를 개발하였고, 실링재 겔화 여부를 판단하는 방법에 대해 제시하고, 아울러 실링재의 겔 상태에서 블리딩율에 대해서도 각 품질기준과 시험방법에 대해 제안하였다.

철도 교량공사의 적정공사기간 산정을 위한 비작업일 산정에 관한 연구 (A Study on Considering Non-Working Days for Determination Normal Project Duration in the Railway Bridgework Construction)

  • 채수민;이상혁;박형근
    • 대한토목학회논문집
    • /
    • 제41권5호
    • /
    • pp.601-608
    • /
    • 2021
  • 최근 건설공사에서 근로기준법의 개정, 이상 기후의 증가로 인한 작업가능일수의 감소와 비작업일수의 증가에도 불구하고 이를 반영한 표준 건설공사기간이 마련되어 있지 않다. 이로 인해 현장에서 적정공사기간을 산정하더라도 예기치 못한 상황에 의해 공기지연이 발생하고 있는 실정이다. 따라서 본 연구에서는 기존의 방식에 건설 제반여건의 변화와 기후변화를 반영한 철도 교량공사의 비작업일수 산정방법을 제시하고, 이 산정방법을 철도 교량공사에 반영하여 전국의 지역별·월별 비작업일수를 산정하였다. 그 결과, 국내의 지역별·월별 비작업일수를 도출하였고, 이를 통해 지역적 특성과 공종별 특성을 반영한 정확한 공사기간의 규정 및 기준의 필요성을 제시했다.

토질변화에 따른 Pump 준설능력 산정 (Evaluation of Dredging Capability of Pump Dredger based on Soil Conditions)

  • 박홍신;유영인;김하영
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 춘계 학술발표회 논문집
    • /
    • pp.316-321
    • /
    • 2006
  • The Prouductivity of pump dredger varies very much depend on soil conditions is one of the main factors affecting construction period. Therefore the acculate evaluation of dredging capability of pump dredger considering soil conditions is a main task in dredging projects. After assesing the results of pump dredging on several Gwangyang port projects, some data of Japan standard for pump dredger are similar to those of actual results and a pump dredging capability table is prepared for future evaluation purposes.

  • PDF