Proceedings of the Korean Society of Soil and Groundwater Environment Conference
/
2004.09a
/
pp.422-425
/
2004
To understand runoff Phenomena in Jeju island, some streams are monitored automatically about stream stage, and water quality in Jeju Provincial Water Resources Management Office. Rating curves for stream discharge are reviewed. Stream stages respond very quick to some rainfall events, and parameters influencing runoff phenomena such as landuse, soil condition, preconditoned rainfall, and vegetables will be studied. A few thousand to ten thousand ml/day are estimated from 6 permanent streams in Jeju island.
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.1B
/
pp.81-87
/
2010
On the SSang-chi gauging station, the discharge had been measured by the rod float method for the past twelve years. However the shifts of the rating curves are too big to be accepted. The major factors of rating curve variation were reviewed for shift analysis. To estimate the discharge measured by rod float method, two cross sections and their stages are generally required. But, the rating curves had been derived only with the observed depth of gauging station since the cross sections were not available. To correct the errors, the reference rating curve was developed. In this study, the water surface slopes of the curve were simulated by RMA2 model. The historical rating curves were re-developed by the calculated discharges on the base of the water surfaces. The results show that the range of fluctuation decreased and rating curves in recent years are physically reasonable.
A method is proposed to estimate groundwater usage for water curtain cultivation (WCC) using a rating curve, and it is applied to field measurements of groundwater discharge used for WCC in Wangjeon-ri, Nonsan. During the winter season, the hydraulic components of irrigation ditches in the study area consist mainly of direct run-off and groundwater discharged from nearby pumping wells. Changes in stage of the ditches were monitored, and a baseflow separation method was applied to remove increments in stage due to direct run-off. The resulting records of stage were translated to groundwater discharge by applying the-stage-discharge relation. The estimated average groundwater discharge for the WCC in Wangjeon-ri was 10,900 m3/d or 420 m3/d/ha when the estimation is normalized by the total area for WCC facilities of this region. Applying this estimation (420 m3/d/ha) to the entire area of the WCC in Korea (10,746 ha),and considering the number of pumping days for the WCC (120 days/year), the total ground water usage for the WCC nation-wide is estimated to be 0.54 billion m3. This is equivalent to 32% of the total groundwater discharge for agricultural use in Korea (1.7 billon m3).
The objective of this study is to suggest the proper sediment transport equation and short and long-term bed change for planning and implementing the river management in Korea. To analyze total sediment discharge and short and long-term bed change, existing sediment transport equations, HEC-RAS 4.1 and CCHE2D numerical models were applied in urban and mountainous rivers. The results of this study are as followings; Firstly, the modified Einstein equation showed the most appropriate result for the estimation of total sediment discharge in the local rivers. Secondly, The stage-discharge relation curve and the discharge-total sediment discharge relation curve were suggested to examine the characteristics of river bed change. Finally, it is founded that river bed change of mountainous river has occurred greater than that of the urban river, and the river bed of urban river now tends to be stabilized on the whole.
Park, Jinhwan;Kim, Kapsoon;Hwang, Kyungsup;Lee, Yongwoon;Lim, Byungjin
Journal of Korean Society on Water Environment
/
v.29
no.4
/
pp.523-530
/
2013
This study has been carried out to clarify the characteristics of discharge and pollutant loading according to flow conditions at jiseok stream watershed (JSW). A flow rate and pollutant load in the study watershed were estimated by equation of stage-discharge and discharge-loads rating curve. By using the methods above, I've evaluated the water quality (WQ) of the JSW if it is satisfied with the standard target. I've collected the data of BOD and T-P from the JSW every 8 days for the duration of 12 months. And then, I've schematized the data upon the load duration curve and the results showed me that the WQ of JSW was satisfied with the standard target. I've also collected the same data every each day for the duration of 12 months from JSW and have schematized the data again. And the results showed that it also was satisfied with the standard target. To be concluded, I've determined that point pollution sources of JSW gives more significant impacts to the WQ than non-point pollution sources of JSW and hence, as time goes, point pollution sources will keep depriciating the WQ of JSW. Therefore, further efforts will be required to JSW to maintain the WQ.
The rating curve is required to convert measured stage into a discharge and is developed using the measurement. In the development of the rating curve, the segmentation position is determined by considering the hydraulic characteristic and channel shape, and subjective judgment of the Hydrographer may intervene in this process. The segmentation position is so important that it determines the overall form of the rating curve, and the incorrect segmentation can cause errors in the rating curve, especially in extrapolation. In order to develop an accurate rating curve with a small number of measurements, the sections must be divided by considering hydraulic characteristic such as the cross-sectional shape. In this study, hydraulic examination methods such as stage-mean velocity, stage-area, stage-${\sqrt{Q}}$ investigated and supplemented to eliminate subjectivity in segmental positioning. Appropriateness for the segmentation position was verify in consideration of the physical meaning of the rating curve index (c).
Choo, Tai Ho;Chae, Soo Kwon;Yoon, Hyeon Cheol;Yun, Gwan Seon
Journal of the Korea Academia-Industrial cooperation Society
/
v.14
no.12
/
pp.6558-6564
/
2013
As the average indicator for amount of water flowing in any cross section of a river, the mean discharge has been reported to be a very important factor for examining water circle constructions in a river basin, the design and construction of a hydraulic structure, and water front area use and management. The stage-discharge curve based on discharge and stage data measured in a normal season were basically derived. Using this derivation, the necessary discharge data was obtained. The values produced in this manner corresponded to the measured data in a uniform flow state well, but showed limited accuracy in a flood season (unsteady flow). In the present paper, the mean velocity in unsteady flow conditions, which exhibited loop form properties, was estimated using the new mean velocity formula derived from Chiu's 2-D velocity. The results of RMSE and Polar graph analyses showed that the proposed equation exhibited approximately nineteen times the accuracy compared to the Manning and Chezy equations.
Flow duration curves provide a compact summary of streamflow variability. In this study, characteristics of the dimensionless flow duration curve in natural rivers with the unregulated discharge were investigated. An analysis of flow duration characteristics was conducted with discharge data at stage-gauging stations of IHP representative basins and of the major rivers in Korea. Discharge characteristics are dependent on area of watershed. However, flow duration coefficients except drought duration coefficient are independent on that. Abundant flow duration coefficient was constant value. The coefficient of flow duration variability defined in this study as the ratio of the normal stream flow over the drought one is decreased with increasing of the watershed area, which implies that the watershed area affects the drought flow duration variability more than the low flow one. And the coefficient of flow duration variability is increased with the river gradient.
Discharge data examine the process of hydrologic cycle and used significantly in water resource planning and irrigation and flood control planning. However, it needs lots of time and money to get the discharge data. So discharge rating curve is usually used in converting discharge data. Therefore reliability of discharge rating curve absolutely depends on quality of discharge data. Many engineers who study hydrologic engineering make high quality discharge data to develop reliable discharge rating curve. And they carry out research on standard and method of discharge measurement, and equipment improvement. Now various flow meters are utilized to make discharge data in Korea. However, accuracy of equipment and experimental research data from measurement are not enough. In this paper, constant discharge flowed through standard concrete channel, and the velocity is measured using various flow meters. Also Discharge is calculated by measured data to compare and analyze. The equipment for the experiment is Price AA(USGS Type AA Current meter), flow meter, ADC, C2 small current meter, flow tracker, Electromagnetic current meter. The discharge got form various flow meters which are widely used for discharge measurement. The various depths of water were examined and compared such as 0.30 m, 0.35 m, 0.40 m, 0.45 m, 0.50 m, 0.55 m. The experiment progresses a round-measurement on 6-case. Wading measurement(one point method : the 60 % height in surface of the water) was applied to improve creditability and accuracy among measurement methods. USGS Type AA current Meter, Flow Meter, ADC, C2 Small Current meter got the certificate of quality guaranteed. So the results of experiment were used to compare discharge. The Results showed the difference based on USGS Type AA current Meter at average discharge and velocity. Electromagnetic current meter made differences over $\pm$ 10 % and Flow Meter made differences under $\pm$ 10 %. Also ADC, Flow Meter, C2 Small Current meter made differences under $\pm$ 5 %.
The peak flood discharge at a downstream station and the flood travel time between a pair of dams due to a specific flood release from the upper reservoir are computed using a hydraulic river channel routing method. The study covered the whole large reservoir system in the Han River, Korea. The computed flood discharges and the travel times between dams were correlated with the duration and the magnitude of flood release rate at the upstream reservoir, and hence a multiple regression model is proposed for each river reach between a pair of dams. The peak flood discharge at a downstream location can be converted to the peak flood stage by a rating curve. Hence, the proposed regression model could be used to forecast the peak flood stage at a downstream location and the flood travel time between dams using the information on the flood travel time, release rate and duration from the upper dam.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.