• Title/Summary/Keyword: Stage of KM research

Search Result 118, Processing Time 0.033 seconds

A Proposal on Calculation Model to Predict Environmental Noise Prediction Emitted by High Speed Trains (고속철도 환경소음예측을 위한 계산 모델 제안)

  • Cho, Dae-Seung;Cho, Jun-Ho;Kim, Jin-Hyeong;Jang, Kang-Seok;Yoon, Jae-Won
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2011.10a
    • /
    • pp.843-848
    • /
    • 2011
  • Planning and construction of railway for high speed trains up to 400 km/h are recently driven in Korea. High speed train is one of the environment-friendly fastest mass transportation means but its noise generated by rolling, traction and aerodynamic mechanism can cause public complaints of residents nearby railways. To cost-effectively prevent the troublesome noise in a railway planning stage, the rational railway noise prediction method considering the characteristics of trains as well as railway structures should be required but it is difficult to find authentic methods for Korean high speed trains such as KTX and KTX-II. In this study, we propose a framework of our own railway noise prediction model emitted by Korean high speed trains over 250 km/h based on the recent research results carried out in EU countries. The model considers railway sound power level using several point sources distributed in heights as well as tracks, whose detail speed- and frequency-dependent emission characteristics of Korean high speed trains should be determined in near future by measurement or numerical analysis. The attenuation during propagation outdoors is calculated by the well-known ISO 9613-2 and auxiliary methods to consider undulated terrain and wind effect.

  • PDF

Geological Structure and Depositional Environments in the Dok Island, East Sea (독도 주변해역의 지구조와 퇴적환경)

  • Huh, Sik;Park, Chan-Hong;Yoo, Hai-Soo;Han, Sang-Joon
    • Journal of the Korean Geophysical Society
    • /
    • v.8 no.3
    • /
    • pp.131-135
    • /
    • 2005
  • A maximum of 3 km thickness of sediments were deposited above basement deformed by volcanic activities around the Dok Island. As the geological structure, the tension caused the basement-involved normal faults in the early stage of basin formation, whereas the sediment layers showed normal faults, volcanic domes and sills caused by volcanic activities. From the distribution of volcanics in order of age at the Ulleung Basin, volcanic activities were increased toward the northeastern direction(toward Dok Island). The study area is characterized by extensional crustal deformation before sediment deposition during the Early or Middle Miocene age. After the Late Miocene age, the basin was deformed by deep buried volcanics or subsidence of basin, in consequence, became complex geological structures.

  • PDF

Analysis of Flight Performance Reserve for Upper Stage of Satellite Launch Vehicles (위성발사체 상단의 비행성능여유 분석)

  • Song, Eun-Jung;Choi, Jiyoung;Cho, Sang-bum;Sun, Byung-Chan
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.45 no.5
    • /
    • pp.386-392
    • /
    • 2017
  • This paper considers the analysis of the flight performance reserve, which is required propellant to compensate various launch vehicle performance deviations, to inject the payload of a 3-staged launch vehicle to a circular sun synchronous orbit at a height of 700 km. The various error sources, which affect the orbit injection accuracy, and their uncertainty are defined first. Then the sensitivity analysis, which has the advantage that each error source effect can be investigated independently, is performed for the extreme ${\pm}3{\sigma}$ conditions of the launch vehicle performance errors. Monte carlo simulations are also conducted to compute the propellant reserve, which can consider the combined effects of each error source. Finally the obtained flight performance reserves by the two approaches are compared and it is confirmed that they show similar results.

Geological Structure and Depositional Environments in the Dok Island, East Sea (독도 주변해역의 지구조와 퇴적환경)

  • Huh Sik;Park Cha-Hong;Yoo Hai-Soo;Han Sang-Joon
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.145-150
    • /
    • 2005
  • A maximum of 3 km thickness of sediments were deposited above basement deformed by volcanic activities around the Dok Island. As the geological structure, the tension caused the basement-involved normal faults in the early stage of basin formation, whereas the sediment layers showed normal faults, volcanic domes and sills caused by volcanic activities. From the distribution of volcanics in order of age at the Ulleung Basin, volcanic activities were increased toward the northeastern direction (toward Dok Island). The study area is characterized by extensional crustal deformation before sediment deposition during the Early or Middle Miocene age, After the Late Miocene age, the basin was deformed by deep buried volcanics or subsidence of basin, in consequence, became complex geological structures.

  • PDF

The Nature of Gold Mineralization in the Archean Sunrise Dam Gold Deposit in Western Australia (호주 Sunrise Dam 광상의 금 광화작용)

  • Sung, Yoo-Hyun;Choi, Sang-Hoon
    • Economic and Environmental Geology
    • /
    • v.43 no.5
    • /
    • pp.429-441
    • /
    • 2010
  • The Sunrise Dam gold deposit is located approximately 850 km ENE of Perth, in the eastern part of the Yilgam Craton, Western Australia. The mine has produced approximately 153 t of Au at an average grade of 4.2 g/t, which stands for the most significant gold discoveries during the last decade in Western Australia. The deposit occurs in the Laverton Tectonic Zone corresponding to the corridor of structural complexity in the Laverton greenstone belt, and characterized by tight folding and thrusting. The mine stratigraphy consists of a complexly deformed and altered volcaniclastic and volcanic rocks. These have been overlain by a turbidite sequence containing generally well-sorted siltstones, sandstones and magnetite-rich shales, which are consistently fining upwards. These sequences have been intruded by quartz diorite, ultramafic dikes, and rhyodacite porphyry (Archean), and lamprophyre dikes (Palaeoproterozoic). These rocks constitute the asymmetric NNE-trending Spartan anticline with north-plunging thrust duplication of the BIF unit. The deposit is located on the western limb of this structure. Transported, fluvial-lacustrine and aeolean sediments lie unconformably over the deposit showing significant variation in relief. Gold mineralization occurs intermittently along a NE-trending corridor of ca. 4.5 km length. The 20 currently defined orebodies are centered on a series of parallel, gently-dipping ($\sim30^{\circ}$) and NESW trending shear zones with a thrust-duplex architecture and high-strain characteristics. The paragenetic sequence of the Sunrise Dam deposit can be divided into five hydrothermal stages ($D_1$, $D_2$, $D_3$, $D_4a$, $D_4b$), which are supported by distinctive features of the mineralogical assemblages. Among them, the D4a stage is the dominant episode of Au deposition, followed by the $D_4b$ stage, which is characterized by more diverse ore mineralogy including base metal sulfides, sulfosalts, and telluride minerals. The $D_4a$ stage contains higher proportions of microscopic free gold (48%) than D4b stage (12%), and pyrite is the principal host for native gold (electrum) followed by tetrahedrite-group minerals in both stages.

Combined 1D/2D Inundation Simulation of Riverside Farmland using HEC-RAS (HEC-RAS를 이용한 하천변 농경지의 1, 2차원 연계 침수 모의)

  • Jun, Sang Min;Song, Jung-Hun;Choi, Soon-Kun;Lee, Kyung-Do;Kang, Moon Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.5
    • /
    • pp.135-147
    • /
    • 2018
  • The objective of this study was to analyze the characteristics of combined 1D/2D inundation simulation of riverside farmland using the Hydrologic Engineering Center - River Analysis System (HEC-RAS). We compared and analyzed inundation simulation results between 1D and combined 1D/2D hydraulic simulation using HEC-RAS. Calibration and validation of stream stage were performed using three rainfall events. The coefficient of determination ($R^2$) and root mean square error (RMSE) between simulated and observed stream stage were 0.935 - 0.957 and 0.250 m - 0.283 m in calibration and validation, respectively. The inundation area showed no significant difference in 1D and combined 1D/2D simulation ($8.48km^2$ in 1D simulation, $8.75km^2$ in combined 1D/2D simulation). The average inundation depth by 1D simulation was 1.4 m deeper than combined 1D/2D simulation. In the lower inundation depth, the inundation area by combined 1D/2D simulation was larger than inundation area by 1D simulation. As the inundation depth increased, the inundation area by 1D simulation became wider. In the case of the 1D/2D combined simulation, low elevation areas along the river bank were inundated widely. Compared to 1D/2D combined simulation, the flood radius in some sections was longer in 1D simulation. In the 1D analysis, because the low altitude riverside farmlands are also assumed to stream, it is calculated that riverside farmlands have the same stage as the mainstream when the stream is overflowed. Therefore, the inundation area seems to be overestimated in those sections. In other regions, the inundation areas tend to be broken depending on overflow by each stream cross-section. In the case of river flooding, the overflow is expected to flow to the lower area depending on the terrain, such as the results of the combined 1D/2D simulation. It is concluded that the results of combined 1D/2D inundation simulation reflected the topographical characteristics of low-lying farmland.

Geophysical Methods applied for Gas Hydrate Exploration in the East Sea (동해 가스하이드레이트 탐사에 적용한 지구물리탐사 방법)

  • Lee, Ho-Young;Park, Keun-Pil;Yoo, Dong-Geun;Koo, Nam-Hyung;Kim, Won-Sik;Kim, Byoung-Yeop;Kan, Dong-Hyo;Kim, Han-Joon
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2007.12a
    • /
    • pp.53-62
    • /
    • 2007
  • Preliminary gas hydrate surveys were carried out From 2000 to 2004 in the East Sea. Research results showed the geophysical evidence of gas hydrate existence. In 2005, Gas Hydrate R&D Organization was established and 10 year gas hydrate development program was initiated. In the $1^{st}$ stage of the program from 2005 to 2007, 6,600 L-km 2-D seismic survey was conducted in the $1^{st}$ year 2005, and $400\;km^2$ 3D survey was conducted in the $2^{nd}$ year 2006. Acquired seismic data were processed and seismic section and 3D cube were produced. By geophysical interpretation and velocity analysis, prospective areas were mapped and candidate drilling sites were recommended. For the precise interpretation, velocity was analyzed using AVO method, and BSR signal was analyzed using deconvolution method. For the prospective area, OBS and high-resolution seismic surveys were conducted. This presentation shows the introduction and examples of the research results of the geophysical methods applied for the gas hydrate exploration in the East Sea.

  • PDF

The Improvement of Forecast Accuracy of the Unified Model at KMA by Using an Optimized Set of Physical Options (기상청 현업 지역통합모델 물리과정 최적화를 통한 예측 성능 향상)

  • Lee, Juwon;Han, Sang-Ok;Chung, Kwan-Young
    • Atmosphere
    • /
    • v.22 no.3
    • /
    • pp.345-356
    • /
    • 2012
  • The UK Met Office Unified Model at the KMA has been operationally utilized as the next generation numerical prediction system since 2010 after it was first introduced in May, 2008. Researches need to be carried out regarding various physical processes inside the model in order to improve the predictability of the newly introduced Unified Model. We first performed a preliminary experiment for the domain ($170{\times}170$, 10 km, 38 layers) smaller than that of the operating system using the version 7.4 of the UM local model to optimize its physical processes. The result showed that about 7~8% of the improvement ratio was found at each stage by integrating four factors (u, v, th, q), and the final improvement ratio was 25%. Verification was carried out for one month of August, 2008 by applying the optimized combination to the domain identical to the operating system, and the result showed that the precipitation verification score (ETS, equitable threat score) was improved by 9%, approximately.

Analysis of Aerodynamic Noise in High Speed Trains

  • Kim, Tae-Min;Kim, Jung-Soo
    • International Journal of Railway
    • /
    • v.4 no.3
    • /
    • pp.70-73
    • /
    • 2011
  • Controlling the exterior and interior noise emission has become an important issue in the research and development of high speed trains. As the operating speed of the train increases, the noise emission characteristics are expected to deviate from that of the existing trains due to several changes in the basic train layout. For train speed in excess of 350 km/h in particular, the aerodynamic noise component starts to exceed the structure-borne noise component, and even an incremental speed increase is accompanied by a rapid elevation in the noise level. The present study presents an engineering approach for predicting the aerodynamic noise level at the design stage for high speed trains. The experimental noise measurements from test run of Korean high speed train under development are presented as a partial validation of the proposed approach. While the overall aerodynamic noise can be cast in a single power law relationship against the train speed, different parts of the train show power law relationships unique to each component.

PRELIMINARY PROJECT OF WATER SUPPLY FOR NDATA FARM, MALAWA

  • Min-Shun Lee;Hung-Kwai Chen;Sheng Liang;Ho-Shong Hou
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1615-1617
    • /
    • 2009
  • The water resources project of 320 Ha second stage reclamation, in which including an University City, out of 800 Ha Ndata Farm, Malawa, had been under studied in this research. The challenge of C value of runoff coefficient was obtained as 0.8, by introducing the attenuation factors method, proposed by second author, an IDF dimensionless method customary used in Taiwan, proposed by the third author, is translated further to solve the project design rainfall; Rational Method, thus, obtains 11.5 CMS as the 5 year recurrence storage. The final job, completed by the third author's on-site performance, includs field alignments and discussions with the trustee, Malawa President H. E. Dr. Bingu Wa Mutharika, when a special concern of anti-theft. In order to provide sufficient supply up to an amount of 44,000 M3 during April to November, the sketch package includes 6 measurements: one water barrage, one sluice gate, one intake, one sediment reservoir, one water reservoir, and 3199 Km long gravity-driving hydraulic pipe.

  • PDF