Clocking effects of a stator on the performance and internal flow in an UTRC 1.5 stage axial turbine are investigated using a three-dimensional unsteady flow simulation. Six relative positions of two rows of stator are investigated by positioning the second stator being clocked in a step of 1/6 pitch. The relative efficiency benefit of about 1% is obtained depending on the clocking positions. However, internal flows have some different characteristics from that in the previous study at the best and worst efficiency positions, since be first stator wake is mixed out with the rotor wake before arriving at the leading edge of the second stator. Instead of the first stator wake, it is found that the wake interaction of the first stator and rotor has a important role on a relative efficiency variation at each clocking position. The time-averaged local efficiency along the span at the maximum efficiency is more uniform than that at the minimum efficiency. That is, the spanwise efficiency distribution at the minimum efficiency has larger values in mid-span but smaller values near the hub and casing in comparison to those at the maximum efficiency. Moreover, the difference between maximum and minimum instantaneous efficiencies during one period is found to be smaller at the maximum efficiency than at the minimum efficiency.
For many years, T/G Supplier has constructed a number of thermal power plants and researched to improve the performance and the reliability of steam turbine, which are achieved by advances in design and materials technology. In recent, interest is renewed in advance steam condition as means of improving economy of thermal power plant and reducing environmental pollution. Improvements in the maximum power have been driven by the development of advanced rotor and bucket material and longer last stage bucket. Improvements in efficiency have been brought through advance in mechanical efficiency and thermodynamic efficiency. This paper describes a number of new steam path design features introduced to the steam turbine product. And also this paper describes new design technologies' development, new technologies' trend and technologies' development for ultra-super critical steam turbine.
For many years, T/G Supplier has constructed a number of thermal power plants and researched to improve the performance and the reliability of steam turbine, which are achieved by advances in design and materials technology. In recent, interest is renewed in advanced steam condition as means of improving economy of thermal power plant and reducing environmental pollution. Improvements in the maximum power have been driven by the development of advanced rotor and bucket material and longer last stage bucket. Improvements in efficiency have been brought through advances in mechanical efficiency and thermodynamic efficiency. This paper describes a number of new steam path design features introduced to the steam turbine product. And also this paper describes new design technologies' development, new technologies' trend and technologies' development for ultra-super critical steam turbine.
Journal of Korean Society of Industrial and Systems Engineering
/
v.18
no.36
/
pp.297-306
/
1995
An automatic transfer line consists of several stages(groups of stations) in series into one system by a common transfer mechanism and a common control system. In this system losses of the efficiency are evidenced in periods where a stage is forcod down- starved or blocked. The efficiency of an automatic transfer line can be improved by providing buffer storages between a stage or the length of line common senses there are several critical factors, system configurations relative position, and buffer capacity allocations in automatic transfer line are considered with a point of view production rates, average stock, and mean delay. The propose of this paper is to provide the robust designs by Taguchi method which improve the efficiency of four-stage transfer line.
A study on techniques to evaluate auditorium assignment visible efficiency using three-dimensional simulation. The most important thing to be considered is to ensure the visibility to the podium upon assigning auditorium of venues, classrooms or seminar rooms. However, since there are so many variables to be considered such as the form of the stage, the area and height of the stage, size of screen, and the distance and angle of the auditorium from the podium, the methods to assign auditorium are staying at the level of basic for a long time. Thus, in this study, we proposed simulation methodology to quantitatively evaluate the three-dimensional visible efficiency based on Visual Graph Analysis (VGA) theory. After analytical methodology manufactures application, it sets examples of visibility depending on location of screen, visibility depending on degree of height difference and visibility about three-dimensional Mass Zoning like a stage and verifies the efficacy. In addition, based on results, visibility expectation curve is drawn and the method to calculate the stepped height depending on necessary visibility is proposed.
As Utility interactive fuel cell systems are widely used, it is required for each power conditioning system(PCS) to have higher generating performance and more stable connecting characteristics. This study is focused to minimization of power losses and hence higher efficiency related to the new half bridge type 3-stage utility interactive PCS topology. The loss factor of half-bridge converter becomes only 1.2[%] under the rated load, and hence total efficiency is maintained to be higher as 91[%].
Journal of Korean Society of Industrial and Systems Engineering
/
v.44
no.3
/
pp.248-261
/
2021
Scientific and technological performances (e.g., patents and publications) made through R&D play a pivotal role for national economic growth. National governments encourage academia-industry cooperation and thereby pursue continuous development of science technology and innovation. Increasing R&D-related investments and manpower are crucial for national industrial development, but evidence of poor performance in business performance, efficiency, and effectiveness has recently been found in Korea. This study evaluates performance efficiency of the 6T sector (Information Technology, Bio Technology, Nano Technology, Space Technology, Environment Technology, Culture Technology), which is considered a high-potential promising industry for the next generation growth and currently occupies two thirds of the national R&D projects. The study measures the relative efficiency of R&D in a comparative perspective by employing the Data Envelopment Analysis (DEA) method. The result reveals overall low efficiency in basic R&D (0.2112), applied R&D (0.2083), development R&D (0.2638), and others (0.0641), confirming that economic performance and efficiency were relatively poor compared to production efficiency. Efficient R&D needs policy makers to create strategies that can increase overall efficiency by improving productivity performance and quality while increasing economic performance.
As competition between ports intensifies, port efficiency has always been a hot topic in the port and shipping economy. Boosting regional and national economies by improving port efficiency and promoting sustainable development of ports is also a concern for port operators and local and national governments. In this situation, this study has the following objectives. First, using panel data from 2010 to 2017, the efficiency of 14 major inland ports along the Yangtze River was analyzed, and changes in port efficiency over time were examined. Second, 14 inland ports are divided into the middle, upper, and lower Yangtze River port groups to compare and review differences in efficiency levels of ports by basin. For the study, we applied a three-step DEA analysis method, which evaluated the pure relative efficiency of the port itself by removing the effects of environmental factors and statistical noise that could affect the efficiency evaluation and presented the results. As a result, it was confirmed that there was a clear difference in the efficiency value of the port between the first-stage and the third-stage efficiency evaluation result. In addition, the downstream ports showed relatively high efficiency compared to the middle and upstream ports.
The last stage blade of the low pressure steam turbine remarkably affects turbine plant performance and availability Turbine manufacturers are continuously developing the low pressure last stage blades using the latest technology in order to achieve higher reliability and improved efficiency. They tend to lengthen the last stage blade and apply shrouds at the blades to enhance turbine efficiency. The long blades increase the blade tip circumferential speed and water droplet erosion at shroud is anticipated. Parts of integral shrouds of the last stage 40 inch blades were cracked and liberated recently in a combined cycle power plant. In order to analyze the root cause of the last stage blades shroud cracks, we investigated operational history, heat balance diagram, damaged blades shape, fractured surface of damaged blades, microstructure examination and design data, etc. Root causes were analyzed as the improper material and design of the blade. Notches induced by erosion and blade shroud were failed eventually by high cycle fatigue. This paper describes the root cause analysis and countermeasures for the steam turbine last stage blade shroud cracks of the combined cycle power plant.
Recently, focus has been drawn on natural refrigerants due to increasing concern on global warming. As a consequence, CO2 systems such as a heat pump water heater using CO2 as a refrigerant are rapidly growing on the market. Currently, rolling piston rotary compressors are widely used for CO2 heating and/or refrigeration systems. There are several ways of realizing gas compression structure. They are single stage compression with single cylinder, single stage compression with two cylinders, and two stage compression with two cylinders. In this paper, computer simulation program which was validated for a single stage rotary compressor with one cylinder has been extended for a single stage, two cylinder rotary type. Numerical investigation has been made on optimal design for the cylinder configuration using the extended simulation program. For a single stage two cylinder rotary compressor having a displacement volume of 4 cc for each cylinder, compressor efficiency has been found to be maximum when the cylinder radius and height are 31mm and 10mm, respectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.