• Title/Summary/Keyword: Stage ceiling height

Search Result 6, Processing Time 0.021 seconds

The Effect of Stage Ceiling Height on the Acoustic Characteristics of Concert Halls (콘서트홀의 무대 천장높이 변화에 의한 객석음향의 영향)

  • Shin Dong-Jae;Jeon Jin-Yong;Seo Hyung-Gyoon
    • The Journal of the Acoustical Society of Korea
    • /
    • v.24 no.1
    • /
    • pp.21-28
    • /
    • 2005
  • In this Paper, the effect of stage ceiling height on the acoustic characteristics of rectangular concert halls are investigated. To find out the acoustic properties of audience area, A simple Boston Symphony Hall(BSH) model which is typically rectangular shaped was applied for computer simulation. A newly built rectangular concert hall with 400 seats was also chosen for a scale model $(1.2m{\times}0.68m{\times}0.31m)$ study and its computer simulation varing the stage ceiling height and the volume. The results show that RT increased as the stage ceiling was lowered and the difference rate of RT by its variance is from -0.09 to -0.06[sec/m].

Daylight Assessment of Venetian Blind by Shading Heights and Slat Angles (베네시안 블라인드의 높이와 슬랫각도 조절에 따른 계절별 실내주광분포 분석)

  • Shin, Hwa-Young;Kim, Gon;Kim, Jeong Tai
    • KIEAE Journal
    • /
    • v.11 no.2
    • /
    • pp.105-111
    • /
    • 2011
  • Aims of this study is to investigate the daylighting control strategy of venetian blind system was performed as a function of ratio of shading height to window and slat angles in the preliminary stage of the parametric study. Floor-to-ceiling window walls of living spaces are used widely in apartment buildings since the Korean government has legally allowed elimination of the balcony area. Enlarging living area by balcony elimination, the larger glass area of window is exposed to the direct sunlight. As a common sunlight controlling device, blind system can be used in all orientations and all latitudes and it may obstruct, absorb, reflect and transmit solar radiation to building by proper adjusting. However, blind system can produce discomfort in occupant and less energy efficiency, if it has not been controlled optimally. The simulation model was based on the unit module of typical living space with balcony elimination. The room dimension was $6.0m(w){\times}6.9m(d){\times}2.7m(h)$ with floor to ceiling height of 2.5m. The blind system was simulated at five slat angles (horizontal, $30^{\circ}$, $45^{\circ}$ upward and downward tilted) and the four ratio of shading height to window (fully closed, partly opened, no-blind) using the Desktop RADIANCE 2.0 program. The series of simulation results indicates that the advantages of available daylight and outside of view can be improved by proper adjusting blind system.

A Study on Church of the stage LED lighting system equipment cases (무대영상용 LED 조명 시스템 설비의 활용 가능성에 관한 연구 - 교회의 시공사례를 중심으로)

  • Lee, Jang-Weon
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.3
    • /
    • pp.61-67
    • /
    • 2011
  • This study examined the P Church in the Large chapel and S Church in the midium chapel were Analyzed to the installed stage broadcast lighting system. As a result of the installation of lighting equipment of LED class in P Church in the Large chapel, it provided clearer image and did not have shadow. While tungsten halogen illumination was very hot and heated to be preaching, LED was not heated so the pastor was very comfortable for preaching. S Church in the Midium chapel due to low ceiling height using LED lighting musical, theater and possibly were directed. If a similar structure of Dae-Hak Street theater to replace the existing fixtures by LED lighting, rendering effective and energy saving effect is thought to have much effect.

Architectural Acoustics Design of multipurpose Auditorium in S-high school (S고등학교(高等學校) 다목적(多目的) 강당(講堂)의 건축음향설계(建築音響設計))

  • Ju, Duck-Hoon;Yun, Jae-Hyun;Kim, Jae-Soo
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.436-440
    • /
    • 2008
  • Among those various facilities attached to the school building, the Auditorium is being utilized for not only the Exercise Activity but also for many purposes such as Culture, Public Performance, Education, Assembly and so on. In order to utilize in maximum such function of the multipurpose auditorium, an adequate acoustic design with regard to the Clarity of Voice and Music in accordance with its use-purpose should be accompanied. However, as the most part of multipurpose auditoriums is designed with high ceiling-height by its peculiar character, and due to use of the material of strong reflexibility, it is appearing the defect that excessively exposes the reverberation of sound. In order to make out an optimal acoustic condition within the broad space such as an auditorium, the acoustic characteristics must be considered from the planning stage, however in the most case, those acoustic problems are being settled through the repair works after construction. On such viewpoint, this Study intends to analyze the room acoustic characteristics from the planning stage using a computer simulation based on the blueprint of multipurpose auditorium in S High School located in Gwangju. It is considered that the material analyzed in such way could be practically applied as a fundamental material enables to improve the acoustic capability when a similar broad space is planned hereafter.

  • PDF

A Study on the Improvement of Architectural Acoustic Performance in the Large Gymnasium (대형(大形) 실내체육관(室內體育館)의 건축음향성능(建築音響性能) 개선(改選)에 관(關)한 연구(硏究))

  • Yun, Jae-Hyun;Kim, Jae-Soo
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.421-426
    • /
    • 2008
  • In case of the large-scaled indoor gymnasium that has been constructed in the local area, there are many instances for the use as multipurpose space where the public performances are possible such as leisure activity, lecture, assembling activity, drama, concert and so on for the resident together with the purpose of sporting facility. In order for utilization to the maximum of the function of such indoor gymnasium, the acoustic capabilities concerned with Definition of both Voice and Music are simultaneously required. However, in case of the large-scaled athletic facility, since it was designed with high ceiling-height in view of its characteristics, it forms a Sound Focus and then the sound is concentrating to the specific part, and because the vibration of sound is too loud due to its broad volume, the acoustic defects such as many Echoes are arising. On such viewpoint, based on the drawing of the indoor gymnasium that is scheduled to be built at B County, Chonbuk Province, this Study has proposed such indoor gymnasium equipped with the optimized acoustic condition passing through Acoustic Simulation Phase. As the result of Acoustic Simulation, we could design the indoor gymnasium that equipped with really satisfying acoustic performance 'after' reformation compared with 'before' reformation, and it is considering that such material could be utilized as the fundamental material that brings a curtailment effect of the construction cost and also enables us to improve the acoustic performance, at the stage of planning and designing for the similar sporting facility in the future.

  • PDF

Improvement of Fire Detection in Rack-type Warehouses using FDS (FDS를 이용한 랙크식 창고의 화재감지 개선에 관한 연구)

  • Choi, Ki-Ok;Park, Moon-Woo;Choi, Don-Mook
    • Fire Science and Engineering
    • /
    • v.33 no.5
    • /
    • pp.55-60
    • /
    • 2019
  • The occurrence of fire in rack-type warehouses may either lead to the warehouses getting entirely burned up or collapsing. This can be attrubuted to the high height of rack-type warehouses, in which combustibles are generally vertically stacked. These characteristics make it difficult to detect a fire early; because detectors are installed on the ceiling, these fires cannot be extinguished at an early stage. In this study, the flow of heat and smoke generated by a fire in a rack-type warehouse was analyzed using a fire dynamic simulator. Through this analysis, the optimal installation conditions of fire detectors for the early detection of fire in rack-type warehouses were confirmed. The analysis results confirmed that complex detection of heat and smoke is required for the early detection of fire in rack type warehouses. Furthermore, it was found that fixed temperature detectors are not suitable for these warehouses, resulting in the need to install heat-smoke hybrid detectors at every three rack levels.