• 제목/요약/키워드: Spinning Reserve

검색결과 28건 처리시간 0.028초

전지이용 전력저장장치 기술개발 (A Study on the Development of Battery Energy Storage System)

  • 황용하;이근섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 B
    • /
    • pp.905-907
    • /
    • 1993
  • Demand for electricity is increasing annually. Especially, the daytime demand grawth shows higher than any other time period. So the big difference between maximum and minimum electrical demand becomes another important problem to be solved. The Battery Energy Storage System is chosen as one of the solutions among the sevral methods. The purpose of utilization of Battery Energy Storage System is to improve the daily load factor. Also, Battery Energy Storage System may be used for the load levelling or the load shifting as well as the spinning reserve. Up to now, only the pumped hydro power plant system has been operated on the commercial basis, but this system has so many constraints such as site, environmental effects, construction period, ect. Being considered current electrical power situation the development of electric storage system is in need latly. Among the various electric storage systems, Battery Energy System is chosen with the top priority because it has sevral merits to cover such as the short construction period, the demand site installation, and the food environmental characteristics.

  • PDF

지역별 운영예비력 적정성 평가 방법 (Adequacy Assessment of Locational Spinning Reserve)

  • 윤용호;이재희;김영욱;주성관;최은재;김기식;송광헌
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.654-655
    • /
    • 2011
  • 운영예비력은 전력설비의 불시사고, 예상치 못한 전력수요 증가 등의 불확실 상황에 대비하기 위해 운영된다. 발전설비의 경제적 효율 및 부하분포에 따라 운영예비력이 지역별로 불균형하게 분포되면 특정 지역의 사고에 대해 신속히 대응하지 못할 수 있다. 특히, 전력수급의 상당부분을 타 지역에서의 송전에 의존하는 지역의 경우, 연계송전 선로 및 지역 내 발전설비 사고에 대비해 지역 내 충분한 운전예비력이 확보되어야 설비사고의 확대를 방지할 수 있다. 본 논문에서는 전력의 상당량을 외부로부터 수전하는 지역의 신속한 사고대응을 위한 지역 내운전예비력의 적정성 평가 방안을 제시하였다. 제시 방법에는 외부 연계선 및 발전설비의 사고 확률모델 및 수요예측 오차를 고려하여 지역 내운전예비력의 적정성을 평가할 수 있는 부하차단확률 지표를 제시하였다.

  • PDF

수용가용 전자전력저장시스템의 경제성 분석 (Economic Assessment of Customer Owned Battery Energy Storage System (BESS))

  • 최준호;김재철;홍종석;손학식;임태훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 추계학술대회 논문집 학회본부 A
    • /
    • pp.180-183
    • /
    • 2000
  • The Battery Energy Storage System(BESS) has lots of advantages such as load levelling, quick response emergency power(spinning reserve), frequency and voltage control, improvement of reliability, and deferred generation and transmission construction. The economic feasibility requires justification from the customer side of meter to promoting the dissemination of BESS nationally. In this paper, we proposed the economic assessment model of customer owned Battery Energy Storage System(BESS) which is complemented and improved the existing model. The proposed model is applied to the typical customer type(light-industrial commercial, and residential) which are taken from the statistical analysis on the load profile survey of Korea Electric Power COmpany (KEPCO). The economic assessment performed for each customer type to justifying their economic feasibility of BESS installation from the economic measures such as payback period, overall benefits, ROI, and ROR. The results of this paper are useful to the customer investment decision making and the national energy policy & strategy.

  • PDF

전지전력저장시스템의 경제성 평가를 위한 분석모델의 연구 (A Study on Analysis Model for Economic Evaluation of Battery Energy Storage System)

  • 김응상;김호용;고요;임성정;김재철
    • 한국조명전기설비학회지:조명전기설비
    • /
    • 제10권5호
    • /
    • pp.75-82
    • /
    • 1996
  • 전지전력저장시스템(BESS)은 날로 심화되어 가는 부화율의 하락현상을 보완해 줄 수 있으며, 순동예비력, 전압 및 주파수제어, 발전 및 송배전 설비의 투자지연 효과, 공급신뢰도 향상 등의 효과를 가지고 있다. 이러한 BESS를 개발완료하여 실용화하기 위해서 경제성 평가가 수반되어야 한다. 본 연구에서는 Sysplan Model을 국내 실정에 맞게 수정 보완하여 경제성 평가를 통한 투자가치를 분석하였다.

  • PDF

Evaluation of the Wind Power Penetration Limit and Wind Energy Penetration in the Mongolian Central Power System

  • Ulam-Orgil, Ch.;Lee, Hye-Won;Kang, Yong-Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • 제7권6호
    • /
    • pp.852-858
    • /
    • 2012
  • This paper describes evaluation results of the wind power penetration limit (WPPL) and the wind energy penetration (WEP) in the Mongolian central power system (MCPS). A wind power plant (WPP) in a power system possesses an output power limit because the power system must maintain a balance between the generation and consumption of electricity at all times in order to achieve an adequate level of quality. The instantaneous penetration limit (IPL) of wind generation at a load is determined as the minimum of the three technical constraints: the minimum output, the ramp rate capability, and the spinning reserve of the conventional generating units. In this paper, a WPPL is defined as the maximum IPL divided by the peak load. A maximal variation rate (VR) of wind power is a major factor in determining the IPL, WPPL, and WEP. This paper analyzes the effects of the maximal VR of wind power on the WPPL, WEP, and capacity factor (CF) in the MCPS. The results indicate that a small VR can facilitate a large amount of wind energy while maintaining a high CF with increased wind power penetration.

전력저장장치를 고려한 일간 최적 기동정지계획 수립연구 (Daily Unit Commitment Scheduling of Power System with Energy Storage System)

  • 송하나;장세환;김형중;노재형;박종배
    • 전기학회논문지
    • /
    • 제60권4호
    • /
    • pp.717-725
    • /
    • 2011
  • In the power system with an electric storage system that can increase utilization rate of the source of such new renewable energy, this paper introduces the approach on the daily unit commitment scheduling that determines simultaneously optimum operational condition and output of thermal generators and electric storage device. The unit commitment is one of the most important issues in economic operation and security of short-term operational plan of the power system. It is to determine on/off status of generator to minimize operational cost during the given period. The committed generator should satisfy various operational limitation such as estimated demand by system, spinning reserve condition within minimum operational cost. In order to determine on/off or charge/discharge/idle condition and output level of units and electric storage system, the MILP(Mixed Integer Linear Programming) is suggested. The proposed approach is the mixed method between LP(Linear Programming) and IP(integer programming) which seeks the value of real number and integer that maximize or minimize function objective within given condition. The daily unit commitment problem with the electric storage system is applied to MILP algorithm through linearization and formulation process. The proposed approach is applied to the test system.

냉각재 온도 감소 장식에 의한 원자력발전소 부하 추종 운전 해석 (Analysis of Nuclear Power Plant Load Follow Operation by Temperature Reduction Method)

  • Park, Sang-Yoon;Park, Goon-Cherl;Lee, Un-Cherl;Kang, Chang-Sun;Kim, Chang-Hyo;Chung, Chang-Hyun
    • Nuclear Engineering and Technology
    • /
    • 제18권3호
    • /
    • pp.209-217
    • /
    • 1986
  • 보론 희석이 불충분한 주기 말에서 부하추종 운전영역을 확장시키기 위해 냉 각재 입구 온도 감소 방식을 사용하였으며, 이 방식을 모사하고 부하추종 운전시 가압경수로 노심의 핵적 특성을 해석하기 위해 3차원적 전산체제를 확립하였다. 해석은 고리 1호기 1주기말에서 12-3-6-3부하추종 운전에 대해 MINB 및 SPINR 모드로 수행되었으며, 부가적으로 이 두 방식에 대한 출력복귀능력도 RETRAN02 코드를 사용한 계통해석과 더불어 시험하였다. 계산결과 냉각재 입구 온도를 감소시킴으로써 부하 추종운전이 주기 말에서도 가능함이 입증되었으며 14$^{\circ}$F의 입구 온도 감소에 따라, SRC가 제어봉만 사용하는 방식보다 MINB 모드에서는 13%, SPINR모드에서는 14%까지 증가됨을 보여주었다.

  • PDF

수용가 형태에 따른 전지전력저장시스템의 경제성 평가 (Economic Assessment of the Battery Energy Storage System with Its Customer Type)

  • 손학식;최준호;김재철
    • 조명전기설비학회논문지
    • /
    • 제16권2호
    • /
    • pp.81-89
    • /
    • 2002
  • 전지전력저장시스템은 부하 평준화, 순동 예비력 확보, 주파수·전압 조정, 신뢰도 향상 및 송변전 설비의 투자지연효과 등의 많은 장점을 가진다. 전지전력저장시스템의 보급을 확산하기 위해서는 수용가 입장에서 본 경제성 평가가 중요하다. 본 논문에서는 기존의 모델을 보완, 개선한 전지전력저장시스템의 경제성 평가 모델을 제안하였다. 제안된 경제성 평가 모델을 한국전력의 부하 조사로부터 얻어진 전형적 수용가인 경공업, 상업, 가정용 수용가에 적용하여 순현재가치, 수익률 등의 경제 척도를 통해 각 수용가의 경제성 타당성을 분석하였다. 이의 결과를 보면 전지전력저장시스템은 특정 수용가 형태(가정 수용가)에 유리하다는 것을 알 수 있었으며, 정부 및 에너지 에이전트는 이의 보급 확산을 위해 세금 혜택, 금융 지원 등의 프로그램을 실행하여야 할 것이다. 본 논문의 결과는 수용가의 투자 의사결정 및 정부 에너지 관련 부서의 정책에 도움이 될 것이다.