Applying microwave, a velocity measurement system has been developed in order to measure the velocity of stream water surface. It's main purpose is the measurement for high velocity of flood water. It is under the developing stage of experimental measurement system. The microwave surface velocity meter uses Doppler effects of microwave. It consists of a radio frequency(RF) part and that of signal processing. Thr RF part has the function of microwave oscillation, reception of reflected wave, and determination of Doppler frequency, etc. Signal processing designates amplification, fast Fourier transform, etx. Various measuring experiments were performed at bridges and a spillway of Taechong re-regulation dam with the microwave velocity meter. Verification test was also made through water tank of ship model test at Research Institute of Ships and Ocean Engineering. It shows 4% error inherent in A/D converter and additional several percentage errors from measurement circumstance. The measuring ranges are from 0.5 to 3.5 m/s. The result shows good linear relationship between carriage velocity and measured velocity, thus proves usefulness as a measuring instrument for flood water velocity. The instrument requires overall re-engineering procedure and number of data should be accumulated and analyzed to treat wind effects and random fluctuations of water surface.
Sayeon dam is the one that is structured in 1965 and supplying residential water in Ulsan. The hill located within the reservoir near the entrance of the dam spillway plays a role as a natural Dike. According to the recent surveys on change of sediment and effective volume of water kept in store, the latter that decreased 2.92% from twenty million tons and the former increased just 1.65 m. In this survey we examined the application of SED-2D model using measured data of Sayeon dam sediment. In addition we surveyed the inflow control and the water depth to be kept when installing small hydraulic structure similar to Dike around the dam reservoir entrance. To do this, we simulated the hydraulic effects and sediment on the conditions eliminating the hill or installing the structure higher than it. The controlling effects of present hill or adding small hydraulic structure on it was found, though the changes of the measure was not large.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.6
/
pp.1919-1924
/
2014
Recently, due to the climate change, the frequency and intensity of extreme rainfall events have been continuously increased in regions of South Korea. As a consequence, safety issues have been raised especially in the hydrologic safety of old dams designed and constructed by the old standards. In general, for improving hydrologic safety of existing dams, two options are considered: 1) raising dam crest; and 2) constructing or expanding an emergency spillway. In this process, the main criteria of alternative selection are overtopping possibility and cost efficiency of each alternative. This approach is easy to implement but it is subject to major limitation for the proper evaluation of alternatives, overlooking downstream flood damages by any controlled flow of water that is intentionally released from dams to eliminate the possibility of overtopping. Therefore, this study suggests a framework for evaluating the dam safety strengthening alternatives in terms of a comprehensive flood control by applying the concept of resilience. The case study shows that the resilience-based evaluation framework which considering downstream flood damages is effective in the selection of dam safety strengthening alternatives.
Proceedings of the Korea Water Resources Association Conference
/
2015.05a
/
pp.219-219
/
2015
Hwacheon Reservoir is one of the reservoirs, which are located on the North Han River in South Korea. Construction of this reservoir was started in 1939 and completed in 1944. At the upstream of this reservoir there are Peace Reservoir, which is located in South Korea and Imnam Reservoir, which is located in North Korea. After construction of Imnam Reservoir, inflow regularity of Hwacheon Reservoir was changed and inflow of Hwacheon Reservoir also, was decreased. Peace Reservoir is used to decrease flood and damage at downstream due to unexpected release from Imnam Reservoir. This reservoir also, has a special role to regulate inflow of Hwacheon Reservoir. Hwacheon Reservoir has an important role for hydropower generation and flood control. Capacity and maximum discharge capacity of Hwacheon Reservoir are 1018 million $m^3$ and $9500m^3/s$, respectively. This reservoir has four generators to produce power and it is one of the important reservoirs for hydropower generation in South Korea. Due to the important role of this reservoir in generating power, maximization of hydropower generation of this reservoir is important and necessary. For this purpose, HEC-ResPRM model was applied in this study. HEC-ResPRM is a useful and applicable model to operate reservoirs and it gives optimal value for release to maximize power by minimizing penalty functions. In this study, after running the model, amount of release was optimized and hydropower generation was maximized by allocating more water for hydropower release instead of spillway release. Also, the model increased release in dry period from October to June to prevent high amount of release in flood season from July to September.
Proceedings of the Korea Water Resources Association Conference
/
2021.06a
/
pp.251-251
/
2021
최근 기후변화로 인한 집중호우의 영향으로 홍수 시 댐으로의 유입량이 설계 당시보다 증가하여 댐의 안전성 확보가 필요하다(감사원, 2003). 이에 건설교통부(2003)는 기후변화와 댐 노후화에 대비하여 치수능력증대사업을 추진하여 댐의 홍수배제능력을 확보하였고, 환경부(2020)에서는 40년 이상 경과된 댐을 대상으로 스마트 안전관리체계 구축을 통한 선제적 보수보강, 성능개선 및 자산관리로 댐의 장수명화를 목적으로 댐의 국가안전대진단을 추진하고 있다. 이에 본 연구에서는 댐 시설(여수로)의 노후도 평가 시 활용 될 수 있는 여수로 표면손상 원인규명에 대하여 3차원 수치모형(FLOW-3D 및 COMSOL Multiphysics)을 통해 검토하고자 한다. 연구대상 댐은 𐩒𐩒댐으로 지형 및 여수로를 구축하였으며, 계획방류량(200년 빈도) 및 최대방류량(PMF) 조건에서 모의를 수행하였다. 수치모의 계산의 정확도 검토를 위하여 Baffle의 설치를 통하여 시간에 따른 유량의 변화를 설계 값과 비교하였고 오차가 1.0% 이내를 만족하는 것을 확인하였다. 여수로 표면손상의 다양한 원인 중 기존연구(USBR, 2019)를 통하여 공동침식(Cavitation Erosion) 및 수력잭킹(Hydraulic Jacking)에 초점을 두었으며 방류조건 별 공동지수(Cavitation Index)산정을 통하여 공동침식 위험 구간을 확인하였다. 이음부의 균열 및 공동으로 인한 표층부 콘크리트의 탈락현상을 가속화시키는 수력잭킹 검토를 위하여 국부모형을 구축하였고 음압력(Negative Pressure), 정체압력(Stagnation Pressure), 양압력(Uplift Pressure)의 분포를 확인하였다. 최종적으로 COMSOL Multiphysics를 통하여 압력분포에 따른 구조해석을 수행하여 폰 미세스(Von Mises) 등가응력 및 변위를 검토하여 콘크리트의 탈락가능성을 확인하였다. 본 연구는 여수로 공동부 및 균열부에서의 손상메커니즘을 확인할 수 있는 기초적인 연구이지만 향후에는 다양한 지형조건 및 흐름조건에서의 압력분포 분석 및 유체-구조물 상호작용(Fluid-Structure Interaction, FSI)모의를 수행한다면 구조물 노후도 및 잔존수명 평가에 필요한 손상한계함수 도출이 가능할 것으로 기대된다.
Proceedings of the Korea Water Resources Association Conference
/
2022.05a
/
pp.246-246
/
2022
여수로는 수리시설의 계획저수위보다 높아진 수위를 낮추기 위하여 물을 안전하고 신속하게 방류하는 시설로 조절형식과 비조절 형식으로 구분한다. 조절형식은 인위적으로 조절수문을 이용하여 수위를 조절하는 형식으로 수문식과 밸브식으로 분류하며, 이상홍수대비 비상방수문에 많이 사용되고 있다. 비조절형식은 자연적으로 수위를 조절하는 형식으로 개수로와 관수로로 분류한다. 개수로에는 측수로식, 슈트식, 자유낙하식, 월류식이 있으며, 관수로에는 터널식, 선굴식, 암거식, 사이펀식이 있다. 한국농어촌공사가 관리하는 저수지는 3400개소로 측수로식 2091개소, 월류식 1269개소, 사이펀식 5개소, 선굴식 3개소, 기타 56개소로 비조절형식 여수로가 약 98%를 차지하고 있다. 2003년도에 재해대비 수리시설 설계기준이 개정되어 유역면적 2,500ha, 총저수량 500만m3이상이고 하류지역의 재산 및 인명피해가 클 것으로 예상되는 저수지는 PMF를 설계홍수량으로 적용할 것을 규정하고 있다. 이러한 설계기준의 홍수빈도를 적용하기 위해 기존 저수지의 치수능력증대 사업이 추진되고 있다. 치수능력증대방안으로는 제당높이 증고, 보조여수로 설치, 기존여수로의 확장 등 다양한 방안들이 있으며, 구조물 안정성, 경제성, 현장 여건을 고려한 시공성 등을 종합적으로 고려하여 채택하고 있다. 그 중 가장 대표적인 방안이 기존의 설계빈도를 초과하는 PMF 홍수량에 대하여 추가로 보조여수로를 설치하여 방류하는 방안이다. 본 연구에서는 기존 사이펀 여수로가 설치되어 있는 저수지에 측수로식 여수로와 사이폰식 여수로를 신설하여 FLOW-3D로 수치해석을 수행하였다. PMF 유입에 대한 저수지의 안정성을 확보하고, 이상강우에 의한 재해를 사전에 예방하기 위하여 신설 여수로의 방류능력, 접근 유속, 허용최대유속 등 각종 수리특성을 분석하여 홍수량 배제 능력을 검토하였다.
Ahn, So Ra;Lee, Ji Wan;Jang, Sun Sook;Kim, Seong Joon
Journal of The Korean Society of Agricultural Engineers
/
v.58
no.4
/
pp.21-35
/
2016
This study is to evaluate the applicability of SWAT (Soil and Water Assessment Tool) model for multi-purpose dams and multi-function weirs operation in Namhan river basin ($12,577km^2$) of South Korea. The SWAT was calibrated (2005 ~ 2009) and validated (2010 ~ 2014) considering of 4 multi-purpose dams and 3 multi-function weirs using daily observed dam inflow and storage, evapotranspiration, soil moisture, and groundwater level data. Firstly, the dam inflow was calibrated by the five steps; (step 1) the physical rate between total runoff and evapotranspiration was controlled by ESCO, (step 2) the peak runoff was calibrated by CN, OV_N, and CH_N, (step 3) the baseflow was calibrated by GW_DELAY, (step 4) the recession curve of baseflow was calibrated by ALPHA_BF, (step 5) the flux between lateral flow and return flow was controlled by SOL_AWC and SOL_K, and (step 6) the flux between reevaporation and return flow was controlled by REVAPMN and GW_REVAP. Secondly, for the storage water level calibration, the SWAT emergency and principle spillway were applied for water level from design flood level to restricted water level for dam and from maximum to management water level for weir respectively. Finally, the parameters for evapotranspiration (ESCO), soil water (SOL_AWC) and groundwater level fluctuation (GWQMN, ALPHA_BF) were repeatedly adjusted by trial error method. For the dam inflow, the determination coefficient $R^2$ was above 0.80. The average Nash-Sutcliffe efficiency (NSE) was from 0.59 to 0.88 and the RMSE was from 3.3 mm/day to 8.6 mm/day respectively. For the water balance performance, the PBIAS was between 9.4 and 21.4 %. For the dam storage volume, the $R^2$ was above 0.63 and the PBIAS was between 6.3 and 13.5 % respectively. The average $R^2$ for evapotranspiration and soil moisture at CM (Cheongmicheon) site was 0.72 and 0.78, and the average $R^2$ for groundwater level was 0.59 and 0.60 at 2 YP (Yangpyeong) sites.
Proceedings of the Korea Water Resources Association Conference
/
2006.05a
/
pp.1737-1740
/
2006
본 연구에서는 1차원 수치모형을 이용하여 댐 여수로에서 발생하는 흐름을 해석하였다. 본 연구에서 사용한 1차원 수치모형은 매우 복잡한 지형에 적용이 가능하며, 상류가 사류가 동시에 발생하거나 도수가 발생하는 흐름도 해석할 수 있는 모형이다. 이 모형은 해석해를 가지는 도수의 경우에 적용하여 검증된 바 있으며, 자연하천의 보에서 발생하는 불연속 흐름에 대해서도 적용된 바 있다. 또한 매우 불규칙한 자연하천에서 발생하는 흐름도 효과적으로 모의할 수 있다. 본 연구에서는 댐 여수로 흐름 해석을 평가하기 위해 단순화된 하도에서 발생하는 불연속 흐름에 대해 이론적인 해와 비교하였다. 또한 댐 수리모형 결과에 수치모형을 적용하여 빈도별로 발생하는 흐름을 해석하였다. 해석결과 여수로에서 발생하는 매우 작은 수심을 정확하게 모의하였으며, 여수로 직하류부에서 발생하는 도수의 발생위치, 발생 전후의 수위도 잘 모의하는 것으로 나타났다. 또한 여수로 및 도수 전후에 발생하는 유속도 정확하게 모의하는 것으로 나타났다. 또한 본 연구에서는 1차원 수치모형을 여수로 뿐만아니라 댐 상류 하천, 저수부, 여수로 접근수로, 여수로, 도수, 하류하천등으로 구성되는 전 구간의 흐름을 동시에 모의하기 적용하였다. 적용 결과 댐 저수지 상류 하천과 저수지, 저수지와 접근수로, 접근 수로와 여수로, 여수로와 도수, 도수 발생 후와 하류하천 등에서 복잡하게 형성되는 흐름을 동시에 잘 모의하는 것으로 나타났다. 본 연구에서 사용한 1차원 수치모형을 이용하면 댐 여수로나 저수지, 연계되어 있는 상하류 하천에서의 흐름을 동시에 해석할 수 있기 때문에 향후 수리모형실험과 연계하여 댐 설계에 효율적으로 사용될 수 있을 것으로 전망된다.지는 것으로 평가되었다. 그러나 본 연구결과를 통하여 투수성 포장과 지하수에 관련된 매개변수의 집적과 분석결과는 현장기술 적용 시 매개변수의 유용한 선택과 도시유역의 물 순환 건전화 대안기술 적용에 효과적인 방법론을 제시할 수 있을 것으로 사료된다.첨두홍수량을 저류하기 위해서 상대적으로 넓은 저류면적이 필요한 것으로 나타난다. 대등한 수위감소값의 홍수저감효과를 발휘하기 위해서 본 연구에서는 On-Line 저류지 면적은 Off-Line 저류지에 비 두배 이상이 필요한 것으로 보여졌다.들에 관한 정보는 종종 현장관측에서 조차 무시되는 경우가 많다. 이에 본 연구에서는 수질모형의 매개변수 중 특히 수리특성에 관련된 매개변수들이 수질에 미치는 영향을 파악하는 것을 목적으로 하고 있다. 이를 위해 적용된 수질모형은 QualKo를 사용하였으며, 대상 하천은 낙동강 본류 경남구간 시점 부근인 회천 합류 전부터 낙동강 본류 경남구간 종점 부근인 밀양강 합류 전까지의 경남 오염총량관리 기본계획 시 구축된 모형 매개변수를 바탕으로 분석을 수행하였다. 일차오차분석을 이용하여 수리매개변수와 수질매개변수의 수질항목별 상대적 기여도를 파악해 본 결과, 수리매개변수는 DO, BOD, 유기질소, 유기인 모든 항목에 일정 정도의 상대적 기여도를 가지고 있는 것을 알 수 있었다. 이로부터 수질 모형의 적용 시 수리 매개변수 또한 수질 매개변수의 추정 시와 같이 보다 세심한 주의를 기울여 추정할 필요가 있을 것으로 판단된다.변화와 기흉 발생과의 인과관계를 확인하고 좀 더 구체화하기 위한 연구가 필요할 것이다.게 이루어질 수 있을 것으로 기대된다.는 초과수익률이 상승하지만, 이후로는 감소하므로, 반전거래전략을 활용하는 경우 주식투자기간
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.3
/
pp.575-583
/
2017
Various types of flow patterns around the stepped weir and spillway, such as the skimming flow over such structures and the wave-type flow with a standing undular hydraulic jump and roller downstream of the structures, are developed in open channels. Unsteady three-dimensional numerical simulations are carried out using a hybrid RANS-LES turbulence modeling approach and the volume of fluid method for resolving free surface fluctuations to represent the turbulent flow including the skimming flow and wave-type flow over a stepped weir installed in a rectangular channel. The comparison of numerical results with an existing experimental measurement reveals that the present numerical simulations reasonably well reproduce the turbulent flow passing the stepped weir, in terms of time-averaged velocity profiles at selected locations downstream of the weir, flow topology characterized by the wave-type and skimming flows, the maximum height and length of the standing wave and the length of reattachment of recirculating zone. The numerical result further elucidates the distinct flow behaviors of the wave-type and skimming flow by presenting instantaneous intense variations of free surface and velocity vectors, the distributions of Reynolds shear stress and turbulent kinetic energy and three-dimensional complex features of coherent structures and total pressure distribution.
The purpose of this paper is to analyze the behavior and to study the safety evaluation of the Unmun Dam located in Cheongdo-Gun of GyeongBuk Province, Korea. For this purpose, soil analyses including boring data, geophysical surveys and monitoring the buried geotechnical gauges, such as pore-pressure gauge, earth-pressure gauge, displacement gauge, multi-layer settlement gauge, leakage flow-meter, were conducted.
In addition to these data, numerical analyses of behavior of dam were performed to predict and to compare the data which were obtained from the above methods. Since many defects, such as gravel and weathered rock blocks in the dam core, and lots of amounts of leakage, by boring analyses were found, reinforcement by compaction grouting system (CGS) has been conducted in some range of dam. Some geotechnical gauge data were also used to confirm the effects of reinforcement. Analyses of monitoring the data of geotechnical gauges buried in the dam, such as pore-pressure gauge, earth-pressure gauge, displacement gauge, multi-layer settlement gauge, and leakage flow-meter shows the load transfer of dam and the possibility of hydraulic
fracturing. As a conclusion, some problems in the dam found. Especially, the dam near spillway shows the high possibility of leakage. It should be pointed out that only the left side of he dam has not a leakage problem. As a whole, the dam has problems of weakness, because of unsatisfactory construction. It is strongly recommended that highly intensive monitoring is required.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.