Magazine of the Korean Society of Agricultural Engineers
/
v.18
no.1
/
pp.4079-4086
/
1976
In many reservoir projects, economic considerations will necessitate a design utilizing surcharge. Determination of the most economical combination of surcharge and spillway capacity for a given spillway crest level will require flood routing studies and economic studies of the dam-reservoir-spillway combinations. Many methods of actual flood routing have been devised, each of them with its advantages and disadvantages. Some of these methods are listed below: (1) Arithmetical trial-and-error method. (2) Modified Puls' method (3) Cheng's graphical method (4) Horton's arithmetical method (5) Ekadahl's arithmetical method (6) Digital computer programming. For the purpose of preliminary design and cost estimating of dams and spillways, it is often required to estimate, for a given design flood and spillway crest level. the approximate values of two among the three characteristics of the spillway spillway length, maximum discharge and surcharge depth at maximum discharge, when one of these quantities is given. As is well known, the outflow hydrograph for an ungated overflow spillway assumes the form of a wave-shaped curve with a minimum point for Q=o At zero time and a maximum point for Q=Qmax at its intersection with the falling leg of the inflow hydrograph (see Fig. 4) The shaded area between the inflow and outflow hydrographs represents at the approximate scale the temporary retention Vt. In line with the remarks, draw by free hand the assumed outflow hydrograph with its maximum point for the given Qmax (see Fig. 4) and by planimetration find Vt. From the reservoir capacity curve (Fig. 3) find Vs for the given spillway crest level and make V=Vs+Vt. From the above curve find surcharge water elevation for V and surcharge depth Hmax over spillway crest. From the discharge formula compute {{{{L= { Q} over { { CH}^{3/2 } } }}}} The methed provides a means for a quick and fairly accurate estimation of spillway capacity.
Synopsis: This study has systemized the results of construction and classification with 656 large dams in Korea which were defined in ICOLD provision. Especially, checking up the drainage capability of large capacity outlets and its of spillway, this paper suggests the planning of outflow discharge with large capacity outlets and spillway in future. The results of this study are following as; 1. The classification by purposes in Korea shows that irrigation dams are 94% in rate(607 dams), jydropower and multipurpose dams are 2% (14 dams), municipal and industrial water supply dams are 4% (26 dams). 2. In design of proposed outflow discharge, spillways of irrigation dams were selected outflow discharge on 100 years return period, those of municipal and industrial water supply dmas 200 years and those of hydropower and multipurpose dams 500 years or 1000 years. 3. Emergency spillway should be considered in the fields of disaster prevention engineering and the rank of return periods for the emergency proposed out flow discharge was suggested. 4. Some of problems are suggested for this subject in future.
Journal of information and communication convergence engineering
/
v.6
no.3
/
pp.337-342
/
2008
Controlling spillway gates of dams is a complex, nonlinear, non-stationary control process and is significantly affected by hydrological conditions which are not predictable beforehand. In this paper, control methods based on dynamic fuzzy control are proposed for the operation of spillway gates of dams during floods. The proposed methods are not only suitable for controlling spillway gates but also able to maintain target water level in order to prepare a draught. In the proposed methods, we use dynamic fuzzy control that the membership functions can be varied by changing environment conditions for keeping up the target water level, instead of conventional static fuzzy control. Simulation results demonstrate that the proposed methods based on dynamic fuzzy control produce an accurate and efficient solution for both of controlling spillway gates and maintaining target water level defined beforehand.
Namgang Dam is located in the upstream of Nam river. Namgang Dam controls flood for the downstream of Namgang Dam using the Namgang spillway and the Sacheonman spillway with planned discharge. However, it had not been evaluated adequately that the effect of the discharge through Sacheonman spillway on the flood reduction of the downstream of Namgang Dam. This study performs runoff simulation considering the discharge from Namgang Dam and Sacheonman spillway. And modeling results are evaluated for the flood reduction effect of Sacheonman spillway on the downstream of Namgang Dam. This study uses a distributed model, GRM(Grid based Rainfall-runoff Model) for runoff analysis. As a result, Sacheonman spillway is assigned more discharge than Namgang Dam, and Sacheonman spillway greatly affects flood reduction in the downstream of Namgang Dam.
Hong, Seung Ho;Hong, Da Hee;Song, Yang Heon;Lee, Jeong Myeong;Jegal, Jin A
Proceedings of the Korea Water Resources Association Conference
/
2022.05a
/
pp.155-155
/
2022
Low head, ogee spillways is popularly used to defense against floods as well as to provide water for irrigation. Spillway is also used to assess compliance with water quality regulations by controlling amount of discharge to the downstream of a channel. For the purpose of water resource management and/or environmental aspects as explained above, the flow discharge through spillways need to be correctly rated as a function of geometry and hydraulic variables. Typically, four flow conditions are encountered during the operation of spillway: (a) uncontrolled free flow (UF); (b) uncontrolled submerged flow (US); controlled free flow (CF); and controlled submerged flow (CS), and each condition has a unique rating equation. However, one of the tricky part of the spillway operation is finding correct flow type over the spillway because structures can operate under both submerged and free flow conditions, and the types are continuously changing over time depending on the amount of discharge, head water and tail water elevation. Quite obviously, if the wrong rating curve relationship is applied because of misjudgment of the flow type due to a transition, a serious error can occur. Thus, an hydraulic model study of one of spillway structure located in South Florida was conducted for the purpose of developing transition relationships. In this presentation, US to UF transition is highlighted.
Journal of Korean Society of Disaster and Security
/
v.14
no.2
/
pp.61-75
/
2021
Recently, as the occurrence frequency of sudden floods due to climate change increased and the aging of the existing spillway, it is necessary to establish a plan to utilize an auxiliary spillway to minimize the flood damage of downstream rivers. Most studies have been conducted on the review of flow characteristics according to the operation of auxiliary spillway through the hydraulic experiments and numerical modeling. However, the studies on examination of flood damage in the downstream rivers and the stability of the revetment according to the operation of the auxiliary spillway were relatively insufficient in the literature. In this study, the stability of the revetment on the downstream river according to the outflow conditions of the existing and auxiliary spillway was examined by using 3D numerical model, FLOW-3D. The velocity, water surface elevation and shear stress results of FLOW-3D were compared with the permissible velocity and shear stress of design criteria. It was assumed the sluice gate was fully opened. As a result of numerical simulations of various auxiliary spillway operations during flood season, the single operation of the auxiliary spillway showed the reduction effect of maximum velocity and the water surface elevation compared with the single operation of the existing spillway. The stability of the revetment on downstream was satisfied under the condition of outflow less than 45% of the design flood discharge. However, the potential overtopping damage was confirmed in the case of exceeding the 45% of the design flood discharge. Therefore, the simultaneous operation with the existing spillway was important to ensure the stability on design flood discharge condition. As a result of examining the allocation ratio and the total allowable outflow, the reduction effect of maximum velocity was confirmed on the condition, where the amount of outflow on auxiliary spillway was more than that on existing spillway. It is because the flow of downstream rivers was concentrated in the center due to the outflow of existing spillway. The permissible velocity and shear stress were satisfied under the condition of less than 77% of the design flood discharge with simultaneous operation. It was found that the flood damage of downstream rivers can be minimized by setting the amount allocated to the auxiliary spillway to be larger than the amount allocated to the existing spillway for the total outflow with simultaneous operation condition. However, this study only reviewed the flow characteristics around the revetment according to the outflow of spillway under the full opening of the sluice gate condition. Therefore, the various sluice opening conditions and outflow scenarios will be asked to derive more efficient utilization of the auxiliary spillway in th future.
Proceedings of the Korean Geotechical Society Conference
/
2006.10a
/
pp.153-160
/
2006
Tunnel type spillway is rarely constructed in worldwide, and designed secondary in Korea. In this paper we pronounce a case study of tunnel type spillway design. We firstly considered lining concrete abrasiveness and cavitations for tunnel safety. This paper describes the design of tunnel type spillway section, excavation method, blasting, support and concrete lining.
Proceedings of the Korean Geotechical Society Conference
/
2006.10a
/
pp.161-168
/
2006
The recent unpredictable weather condition, especially abnormal heavy precipitation which is on the verge of PMF, made implement more rigorous design standard. Following these trends, the idea of additional auxiliary spillway, most of them are tunnel around existing one, is adopted to many sites. Tunnel spillway, having free water table is generally consisted of several compartments such as inlet, transition, inclined, curved and stilling parts. It may has some technical problems to be considered. Among them, the surface deterioration due to cavitation is reported many times in the part of irregularities on lining. Including this kind of problem, several technical considerations for tunnel spillway will be handled in this paper during design procedure.
Faridmehr, Iman;Jokar, Mohammad Javadi;Yazdanipour, Mohammadreza;Kolahchi, Ali
Structural Monitoring and Maintenance
/
v.6
no.1
/
pp.1-17
/
2019
Preserving reservoir safety has recognized to be important for the public where a vast majority of dams are located upstream of greatly populated cities and industrialized areas. Buckling, floatation and cavitation have caused failure in the spillway gates and conveyance features during past catastrophic events; showed their vulnerability and need for regular inspection along with reviewing design calculations to ensure the spillway meet current design standards. This paper investigates the hydraulic and structural consideration of dam's spillway by evaluating the data of Karkheh Dam's. Discharge capacity, flood routings and cavitation damage risk were main features for hydraulic considerations where hydrostatic and hydrodynamic forces and stability conditions were considered in structural considerations.
Proceedings of the Korea Water Resources Association Conference
/
2006.05a
/
pp.1726-1731
/
2006
Hydraulic and numerical models were applied to design the emergency spillway of ImHa multipurpose Dam. For the numerical model, FLOW-3D was used to evaluate the three-dimensional flow in the spillway. The results of hydraulic model were compared with those of the numerical model which were separated into four zones such as approaching zone, weir zone, transition & tunnel chute zone, and dissipator zone. Moreover, for optimum design of the spillway, the hydraulic and numerical models were performed for the basic plan. Solving the problems of the basic plan, the optimized alternative design was proposed. The numerical models for various conditions of the spillway were performed, which is not always feasible in the hydraulic models. Verified by using the hydraulic models, the optimum alternative design was proposed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.