• Title/Summary/Keyword: Speed line

Search Result 2,687, Processing Time 0.034 seconds

The Feasibility study of Commission plan in HEMU (High-speed Electric Multiple Unit) System (분산형 고속철도 시스템의 시운전방안 효율성 검토)

  • Cho, B.C.;Kim, K.G.;Jeong, S.H.;Kim, J.S.;Lim, K.M.
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1039-1044
    • /
    • 2008
  • By the result of efforts for the technology development of G7 trainset, the technology of domestic high-speed train KTX-II has lately been put to practical use while a forward countries of railway, which have their own developing ability of high-speed train, are competing against each other for the development of faster high-speed train system. Japan has been commissioning of FASTECH 360 which was developed in June 2005. Also France and Germany have been commissioning of next generation high-speed train such as AGV and ICE-3, developed basing on technology of their existing high-speed train system(TGV and ICE), its maximum commercial running speed is 360kph, and adopted multiple unit system. For the development of technology of domestic high-speed train and enhancement of national technology competitive power, HEMU (High-speed Electrical Multiple Unit) development project has been carried out as a national R&D project from last August. For the executing of HEMU's maximum speed test, we have investigated the high speed line characteristics (i.e. radius of curvature, gradient, cant etc.) of Seoul-Pusan line and Honam line which is under construction. We'd like to examine a study of condition for the best HEMU T&C line considering HEMU's characteristics (i.e. acceleration, deceleration etc.) and its interface with infrastructure in this paper.

  • PDF

Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line (수서고속철도 전차선로의 설치조건의 따른 집전상태 분석)

  • Na, Kyung-min;Park, Young;Lee, Kiwon;Cho, Yong Hyeon;Kwon, Sam-young;Park, Chulmin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.4
    • /
    • pp.727-732
    • /
    • 2017
  • This paper describes the dynamic characteristics depending on installation condition between a pantograph and an OCL (Overhead Contact Line) on a new high speed line in Korea. The current collection performance between the pantograph and the OCL was tested during train operation from Suseo to Jije stations. The current collection performance is evaluated based on the duration of an arc by using an arcing measurement system. The system consists of an optical sensor for measuring the duration of an arc and a camera for monitoring current collection performance. An arcing duration is defined as a percentage of arcing in international standards. This test aims to analyze the locations of repetitive arcing depending on installation conditions of OCLs on a new high speed line in order to use the result as reference data for correct construction and maintenance.

Output Power Control of Wind Generation System using Estimated Wind Speed by Support Vector Regression

  • Abo-Khalil Ahmed G.;Lee Dong-Choon
    • Proceedings of the KIPE Conference
    • /
    • 2006.06a
    • /
    • pp.345-347
    • /
    • 2006
  • In this paper, a novel method for wind speed estimation in wind power generation systems is presented. The proposed algorithm is based on estimating the wind speed using Support-Vector-Machines for regression (SVR). The wind speed is estimated using the generator power-speed characteristics as a set of training vectors. SVR is trained off-line to predict a continuos-valued function between the system's inputs and wind speed value. The predicted off-line function as well as the instantaneous generator power and speed are then used to determine the unknown winds speed on-line. The simulation results show that SVR can define the corresponding wind speed rapidly and accurately to determine the optimum generator speed reference for maximum power point tracking.

  • PDF

Suggestion to Improve the Railway Infra for Speed Increase of High-speed Train in Gyeongbu Line (경부선 고속열차 증속을 고려한 철도인프라 보강 방안)

  • Kim, Jung-Hun;Park, Dae-Geun;Won, Yong-Hoan;Kim, Man-Cheol;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1249-1253
    • /
    • 2009
  • Enhancements of transport capacity in Gyeongbu line are continuous with the operating cost reduction and Korean economic development. Besides, requirements of a people about speed-up and customer service after the opening of high-speed railway(KTX) are being increased nowadays. Therefore, development and effort for speed increase of high-speed railway(KTX) have to be encouraged and supported by the government. In this study, market and technology trends for speed increase of high-speed train in Korea and abroad were investigated. As a result, we suggested to improve the railway infra for speed increase of high-speed train in Gyeongbu line.

  • PDF

A Modeling and Simulation Implementation on the Power Line Disturbances by Loss of Contact for the High-Speed Railway Vehicle (고속전철 주행시 이선에 따른 전원외란 현상 모델링 및 시뮬레이션 구현)

  • Kim, Jae-Moon;Kim, Yang-Soo;Chang, Chin-Young;Gimm, Yoon-Myoung
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1137-1142
    • /
    • 2008
  • In this paper, an effect on power conversion unit in high-speed railway vehicle by loss of contact between a catenary system and pantograph suppling electrical power to high-speed railway vehicle are investigated. One of the most important needs accompanied by increasing the speed of high-speed railway vehicle is reduced that arc phenomenon by loss of contact brings out EMI. in case of high-speed railway vehicle using electrical power, as comparison with diesel rolling stock, PLD(Power Line Disturbance) such as harmonic, transient voltage and current, EMI, dummy signal injection etc usually occur. To analysis the effect on loss of contact, it is necessary electrical modeling system between the contact line and the pantograph according to the loss of contact. Therefore analytical model of a contact line and a pantograph is constructed to simulate the behaviour of loss of contact. The reliability of the modeling system is verified by simulation implementation on kinds of loss of contact.

  • PDF

Noise Effects of High Speed Train on Coventional Track (기존선에서 고속전철 운행시 소음평가)

  • 나희승
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.948-953
    • /
    • 2002
  • As the delay of the Kyungbu High Speed Railroad, HST should use conventional line through Daegoo to Pusan until the new railroad build. High speed railroad noise is one of the main causes of environmental impact. Whenever HST on conventional railroad line is planned or a housing project near an existing railroad is proposed, an estimate of the relevant noise levels is usually required. For this, it is necessary to quantify those parameters that affect the railroad noise. This paper deals with an estimation of high speed railroad noise on conventional line.

  • PDF

The Effectiveness Analysis on Set of Ramp Metering STOP-line Using Traffic Simulation Model (교통시뮬레이션 모형을 이용한 램프미터링 정지선 설정에 따른 효과분석)

  • Kim, In Su;Yang, Choong Heon
    • International Journal of Highway Engineering
    • /
    • v.16 no.1
    • /
    • pp.111-118
    • /
    • 2014
  • PURPOSES : This study performs fundamental research on ramp-metering design criteria. METHODS : We carefully review previous studies in terms of ramp-metering design criteria and then consider applicability in Korea. For this, traffic simulation model is employed to analyze actual effect according to specific location of stop-line when implementing ramp-metering. RESULTS : When a stop-line moving forward with a 50m interval, travel speed at mainline relative to current stop-line location tends to decrease. However, traveling speed at approach roads increase about 5~18% under the same condition. When a stop-line location moving backward with a 50m interval, mainline travel speed increase approximately 17~32% whereas traveling speed at approach roads decrease. All cases are compared with the current stop-line location. CONCLUSIONS : We believe that both cases are useful with respect to freeway management. For example, moving forward a stop-line case can be used management for queuing area at ramp section and approach roads. Moving backward a stop-line case can be used for traffic control, focusing on mainline of freeways.

Stability behavior of the transmission line system under incremental dynamic wind load

  • Sarmasti, Hadi;Abedi, Karim;Chenaghlou, Mohammad Reza
    • Wind and Structures
    • /
    • v.31 no.6
    • /
    • pp.509-522
    • /
    • 2020
  • Wind load is the principal cause for a large number of the collapse of transmission lines around the world. The transmission line is traditionally designed for wind load according to a linear equivalent method, in which dynamic effects of wind are not appropriately included. Therefore, in the present study, incremental dynamic analysis is utilized to investigate the stability behavior of a 400 kV transmission line under wind load. In that case, the effects of vibration of cables and aerodynamic damping of cables were considered on the stability behavior of the transmission line. Superposition of the harmonic waves method was used to calculate the wind load. The corresponding wind speed to the beginning of the transmission line collapse was determined by incremental dynamic analysis. Also, the effect of the yawed wind was studied to determine the critical attack angle by the incremental dynamic method. The results show the collapse mechanisms of the transmission line and the maximum supportable wind speed, which is predicted 6m/s less than the design wind speed of the studied transmission line. Based on the numerical modeling results, a retrofitting method has been proposed to prevent failure of the tower members under design wind speed.

A Study on Durability Standard Specification of the Dropper Clamp of Catenary for High Speed Railway (고속철도 전차선로 드로퍼 클램프 내구성 기준 정립에 관한 연구)

  • Oh, Wan-Shik;Yang, In-Dong;Park, Byung-Gon;Hong, Seok-Jin;Kim, Seong-Cheol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.9
    • /
    • pp.1431-1436
    • /
    • 2017
  • The high-speed railway of catenary system, supplies a stable electric power supply to the train by satisfying the special conditions between pantograph and trolley wire, which operates more than 250km/h mutually sliding and feeding electric lines. According to Korean Railway Standard KRS PW 0026-13 (R), the standard for the grip strength of the dropper clamp in conventional line is established, but the high-speed railway line is not yet. When the grip strength of the dropper clamp is detached from the catenary line of the high-speed railway line, various problems may occur, such as damage to the pantograph due to the collision and arcing. In this paper, it is expected to be used as a basic data for establishing the durability criteria of the high-speed railway dropper clamp by verifying the dropper clamp on the Gyeong-bu and Honam high-speed line.