• Title/Summary/Keyword: Speed Planning

Search Result 543, Processing Time 0.028 seconds

Methodology of Climate-Ecological Priority Area Analysis for Air Corridor Planning - In the Case of Pan-Gyo Area - (바람통로 계획을 위한 기후생태적 우선지역 분석 및 설정 방법 - 성남 판교지역을 중심으로 -)

  • 송영배
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.31 no.3
    • /
    • pp.58-73
    • /
    • 2003
  • It is well known that urban environment affects climate, as we can see in the quality of bio-climate. However, climate has not been recognised properly in the urban planning process. The role it flays needs to be examined for better urban environment. The main objective of this study is to investigate the climate-ecological priority area which produces cold fresh air and thermal induced wind circulation between rural and urban areas. The objective is also to improve the quality of bio-climate and wind circulation at blocked urban areas. This paper uses the measurement and analysis method of wind direction and wind speed in order to investigate the climate-ecological priority area and cold fresh air corridor. In this study, local climate conditions i.e. wind speed, wind direction, temperature, humidity etc., were measured at nine fields and analyzed. On the basis of the climate measurement, the climate ecological priority areas were delineated; These will be assigned as climate-ecological conservation areas.

Review on Environment Noise Prediction Methods Emitted by High Speed Trains (고속철도 환경소음 예측 모델 고찰)

  • Cho, Dae-Seung;Jeng, Hong-Gu;Cho, Jun-Ho;Jang, Kang-Seok;Yoon, Jae-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2852-2859
    • /
    • 2011
  • Planning and construction of railway for high speed trains up to 400 km/h are recently driven in Korea. High speed train is one of the environment-friendly fastest mass transportation means but its noise generated by rolling, traction and aerodynamic mechanism can cause public complaints of residents nearby railways. To cost-effectively prevent the troublesome noise in a railway planning stage, the rational railway noise prediction method considering the characteristics of trains as well as railway structures should be required but it is difficult to find an authentic method for Korean high speed trains such as KTX and KTX-II. In this study, recent railway noise prediction methods developed by EU countries are introduced and discussed for consulting before setting the framework of our own railway noise prediction model emitted by Korean high speed trains over 250 km/h. Especially, the new Schall 03 model (2006) developed by Germany and IMAGINE model (2007) suggested by an EU framework research project are intensively reviewed. In addition, research items required for the development of our own model are suggested.

  • PDF

Planning and Design of Honam High-Speed Railroad's Bridges (호남고속철도 4-2공구 교량 계획 및 설계)

  • Bae, Min-Hyuk;Woo, Dong-In;Cho, Hyun;Ahn, Kwang-Su;Han, Nock-Hee
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1470-1477
    • /
    • 2010
  • In 2004, Korea has become the world's fifth-express train states, Honam high-speed railroad which goes down another line with existing Kyoungbu high-speed railroad is divided 19 construction sectors, its total length is 230.9 km and it will be constructed by 2017. This site is located in Jeollabukdo Jeong-eup district along 9.38 km. There are three representative bridges. ;One is the PSC box girder bridge, another is the Extradosed bridge, and the other is the three continuous spans half-through hybrid arch bridge. This paper shows a planning and design of these bridges.

  • PDF

A Development of Optimized Train Scheduling Program (열차배열의 최적화 프로그램 개발)

  • Ryu, Sang-Hwan;Kim, Eui-Il;Kim, Kil-Sang
    • Proceedings of the KIEE Conference
    • /
    • 1995.11a
    • /
    • pp.513-515
    • /
    • 1995
  • A computer aided process is inevitable for the optimization of train operation planning. Developing of train diagrams is very important for the train operation planning. In this paper, the user friendly program related to the train scheduling that can be used for the basic data on developing of train diagram is introduced. It can also provide basic data for other train operation plannings, such as Timetabling, Crew Operation Scheduling, etc. It provides the planner with data moving, data changing and zooming functions, and it can assist the user easily produces their optimal solution. All this operations are performed interactively through graphic windows.

  • PDF

Train Performance Simulation and Evaluation for Korea High Speed Train (한국형 고속전철 개발열차 열차성능해석 및 평가)

  • 이태형;박춘수;신중린
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.2
    • /
    • pp.120-124
    • /
    • 2004
  • Computer aided simulation is an essential part in planning, design, and operation of railway systems. To determine the adequate performance and specification of railway system, it is necessary to calculate train performances such as distance, speed, power during train's running. This paper presents result of train performance simulation using the program that developed for Korea high speed train. To verify result of simulation, we have compared that with experiment data.

Analysis of Neighborhood Environmental Factors Affecting Bicycle Accidents and Accidental Severity in Seoul, Korea (서울시 자전거 교통사고와 사고 심각도에 영향을 미치는 근린환경 요인 분석)

  • Hwang, Sun-Geun;Lee, Sugie
    • Journal of Korea Planning Association
    • /
    • v.53 no.7
    • /
    • pp.49-66
    • /
    • 2018
  • The purpose of this study is to analyze neighborhood environmental factors affecting bicycle accidents and accidental severity in Seoul, Korea. The use of bicycles has increased rapidly as daily transportation means in recent years. As a result, bicycle accidents are also steadily increasing. Using Traffic Accident Analysis System (TAAS) data from 2015 to 2017, this study uses negative binomial regression analysis to identify neighborhood environmental factors affecting bicycle accidents and accidential severity. The main results are as follows. First, bicycle accidents are more likely to occur in commercial and mixed land use areas where pedestrians, bicycle and vehicles are moving together. Second, bicycle accidents are positively associated with road structures such as four-way intersection. In contrast, three-way intersection is negatively associated with serious bicycle accidents. The density of speed hump or street tree is negatively associated with bicycle accidents and accidential severity. This finding indicates the effect of speed limit or street trees on bicycle safety. Fourth, bicycle infrastructures are also important factors affecting bicycle accidents and accidential severity. Bicycle-exclusive roads or bicycle-pedestrian mixed roads are positively associated with bicycle accidents and accidential severity. Finally, this study suggests policy implications to improve bicycle safety.

A Study on the Development of Enterprise Resource Planning System for Small-and-Medium Sized Enterprises (중소기업형 표준정보시스템 개발에 관한 연구)

  • 이교상;박화규;손주찬;고영철;백종명;박상봉
    • The Journal of Society for e-Business Studies
    • /
    • v.2 no.2
    • /
    • pp.137-153
    • /
    • 1997
  • The acceptance of enterprise resource planning (ERP) system in the industries is essential to enhance the enterprise-wide productivity and global competitiveness. In this study, we first describe the needs for the ERP system and the structural backgrounds of the system. Then we suggest our strategies for the implementation of the standard ERP system under the small and medium enterprises (SMEs).

  • PDF

A Unified Approach to Path Planning of SMT Inspection Machines (SMT 검사기의 경로 계획을 위한 통합적 접근 방법)

  • 김화중;정진회;박태형
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.8
    • /
    • pp.711-717
    • /
    • 2004
  • We propose a path planning method to improve the productivity of SMT (surface mount technology) inspection machines with an area camera. A unified method is newly proposed to determine the FOV clusters and camera sequence simultaneously. The proposed method is implemented by a hybrid genetic algorithm to increase the convergence speed. Comparative simulation results are then presented to verify the usefulness of the proposed algorithm.

Collision-Avoidance Task Planning for 8 Axes-Robot Using Neural Network (신경회로망을 이용한 8축 로봇의 충돌회피 경로계획)

  • 최우형;신행봉;윤대식;문병갑;한성현
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2002.04a
    • /
    • pp.184-189
    • /
    • 2002
  • Collision free task planning for dual-arm robot which perform many subtasks in a common work space can be achieved in two steps : path planning and trajectory planning. Path planning finds the order of tasks for each robot to minimize path lengths as well as to avoid collision with static obstacles. A trajectory planning strategy is to let each robot move along its path as fast as possible and delay one robot at its initial position or reduce speed at the middle of its path to avoid collision with the other robot.

  • PDF

Optimal Collision-Avoidance Task Planning for Dual-Arm Using Neural Network (신경회로망을 이용한 Dual-Arm 로봇의 충돌회피 최적작업계획)

  • 최우형;신행봉;윤대식;문병갑;한성현
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2001.04a
    • /
    • pp.244-249
    • /
    • 2001
  • Collision free task planning for dual-arm robot which perform many subtasks in a common work space can be achieved in two steps : path planning and trajectory planning. Path planning finds the order of tasks for each robot to minimize path lengths as well as to avoid collision with static obstacles. A trajectory planning strategy is to let each robot move along its path as fast as possible and delay one robot at its initial position or reduce speed at the middle of its path to avoid collision with the other robot.

  • PDF