• Title/Summary/Keyword: Special Purpose Company (SPC)

Search Result 12, Processing Time 0.026 seconds

An Improvement Method through Build-Transfer-Lease (BTL) Problem Analysis from the Special Purpose Company (SPC) Perspective (SPC 관점에서의 BTL사업 문제점 분석을 통한 개선방법)

  • Kim, Soo-Yong;Son, Myung-Chan;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.167-175
    • /
    • 2013
  • In 2005, the government introduced BTL(Build-Transfer-Lease) projects as one of the methods of private investment in infrastructure. In a BTL project, a private company builds a public facility and leases it to the government to withdraw its invested capital. But there appear several problems with it due to a short period of preparation and lack of experiences. Specifically, private companies that plan to participate in this project have to take a risk since serious problems are likely to take place because of unrealistic estimation of construction costs, etc., and they finally avoid participating in this project. A case study was made over advanced countries, Japan and the United Kingdom, to find out how to resolve the problems, and rational 7 improvement method were presented from a perspective of Special Purpose Company (SPC), which could be accepted by both of SPC and government agencies. The findings of the study are expected to provide workable solutions to BTL projects from a standpoint of private companies to facilitate the rational improvement of BTL projects, and this study is ultimately expected to stimulate the active participation of SPC to make a contribution to the vitalization of domestic BTL projects.

Investment in Performing Arts, Process and Challenges : Focus on Venture Capital Investment in Musical Play (공연예술 투자 프로세스의 현황과 과제 : 벤처캐피탈의 뮤지컬 투자를 중심으로)

  • Park, Dain;Park, Chanhi
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.9 no.6
    • /
    • pp.9-21
    • /
    • 2014
  • Source and use of investment money in the content business has been subject to closer attention, This study attempts to identify the information asymmetry problem in the performing art are, focusing on the Korean musical play. Despite the various discussions in the venture capital practice in the performing art area, there has been few studies analyzing the investors' perspective. While juggling with the 'artistic value' and 'rate of return', the investors are concerned about the 'transparency' of the performing art practice. When coupled with the subjective judgment of 'artistic value', the information asymmetry between the investor and the performing art manager becomes more delicate. In the performing art business, 'SPC(Special Purpose Company)' is considered a possible solution to organize the deal structure in this field. This study analyzes the role of SPC regarding the information asymmetry problem.

  • PDF

Special Purpose Company and Drama Production: A Case Study of KGCS (방송드라마 제작방식으로서 문화산업전문회사에 대한 연구: KGCS문화산업전문회사를 중심으로)

  • Yu, Konshik;Moon, Sanghyun
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.2
    • /
    • pp.172-180
    • /
    • 2014
  • The purpose of this study is to examine how the Munjeonsa(SPC) has influenced the way terrestrial broadcasting networks produce drama. The study has three research objectives. First, this study investigates why the networks use SPC for drama production. Second, the study examines the features in the process of the setup and operation of SPC. Third, the study identifies the impacts of SPC on networks' drama production. This study analyzes which was produced by KBS SPC. The results of this study are as follows. First, networks introduce SPC to procure an enormous production costs and to manage the production system transparently and efficiently. Second, the feature of networks' SPC(KGCS SPC) is that it has a unique dual structure with main and project SPC. Third, SPC influences drama production system in various ways; revitalization of external investment, accounting transparency, growing of network's planning dramas, securing intellectual properties and revenue diversification.

Performance Prediction Model for Public-Private Partnership Projects Considering Stakeholders' Profitability (참여자별 수익성을 고려한 민간투자사업 성과예측 모델)

  • Yeo, Dong Hoon;Yu, Giwon;Lee, Kang-Wook;Han, Seung-Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.471-480
    • /
    • 2015
  • The market of public-private partnership (PPP) projects has reduced from 9.4 trillion won in 2007 to 4.5 trillion won in 2012. However, the need of PPP projects is brought up by a massive down scale of government financial business. Previous studies regarding PPP projects mostly evaluate profitability from the financial perspective or analyze risk factors as a whole. Although PPP projects generally have complex structure involving diverse stakeholders, such as contractor, financial investor, and special purpose company (SPC) operators, existing studies have rarely considered the different viewpoints of PPP project stakeholders. Therefore, purpose of this study is to develop a structural equation model (SEM) considering the diverse stakeholders of PPP projects. To this end, the authors first reviewed the organizational structure of PPP projects. Next, the identification of the factors affecting project profitability are done via comprehensive literature reviews. After that, we conducted in-depth interviews and questionnaire surveys to reflect stakeholders' perspectives (contractors, financial investors, and SPC operators). As a result, a SEM model is developed to analyze direct and indirect effect on the PPP project performances. Finally, using the analysis results, relevant implications and directions for improvements are discussed. The prediction of the business performance of contractor, financial investor, and SPC operator is expect to be possible through the model developed and supports the strategy deduction that is appropriate for the participants.

민자사업의 사업관리 사례분석

  • Lee Kwan-Young;Kim Se-Jong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.13-19
    • /
    • 2004
  • In most PFI(Private Finance Initiative) projects in Korea, the project management are in charge of the Special Purpose Company(SPC) established for carrying out the project. This paper is a case study about an owner CM executed by the organizations and staffs of SPC itself. : Seoulbeltway (Ilsan $\~$ Toegaewon) Private Investment Project. In time management area, the SfC was the leader of project management throughout the life circle - plan, design, permit, construction, operation and maintenance - beyond the schedule manager's role. In cost management area, the methods of reducing the total costs by VE, new technologies, etc. has been needed assuming the construction risks were subject to SPC.

  • PDF

The Improvement of Work Structure in the Private Investment SOC Project (민자 SOC사업의 시공단계 업무체계 개선방향)

  • Kim Daejin;Shin Seungtae;Lee Younghwan;Woo Sungkwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.486-489
    • /
    • 2004
  • To enlarge the international competition and construction productivity, the domestic construction market attracts the private capital and expands the facility of :iocial Overhead Capital(SOC). However, the application of the business system used at the public project didn't utilize the effect of social overhead capital. It caused problems that parties' business was inefficient and their allotment of the risk was inadequate. This paper presents the course to reorganize the business system which the coincides with the origin aim of the SOC. For the reformation of the supervisor's work scope and business system and the government's overall project management, in other words, this paper proposes the professional organization to replace the superintendence and the formation of optimal business system. This paper confirms the privity of contract among parties of SOC project and parties' work scope and system between relative laws and concession agreement that government made a contract with Special purpose Company (SPC).

  • PDF

International Cooperation Development with Recipient Countries by Catalytic Aid (촉진적 원조를 통한 수원국과의 개발협력에 관한 연구)

  • Lee, Ho-Gun
    • Korea Trade Review
    • /
    • v.41 no.1
    • /
    • pp.117-138
    • /
    • 2016
  • ODA is an effort and action of international community to keep human rights by eradicating poverty. UN declared MDGs (Millennium Development Goals) during 2001 and 2015. As a follow-up action, UN sets up SDGs (Sustainable Development Goals) during 2016 and 2030. SDGs expands the concept of ODA. SDGs includes cooperation development over the scope of ODA by mobilizing various financial resources from public sectors and private sectors. It will overcome the limitation of traditional ODA and be 'AID and beyond'. Catalytic aid is appropriate for the concept of SDGs. Cooperation development by catalytic aid focuses on building economic infrastructure and production facilities rather than humanitarian aid, which will establish a sustainable development basis for recipient countries. This study suggests to make a PPP business by linking KSP(Knowledge Sharing Program), to objectify criteria of priority recipient selection and aid allocation, to adapt grant and concessional loan complexly according to the business, to support realization of CSV(Creating Shared Value) by establishing SPC(Special Purpose Company) and to construct a PCSD(Policy Coherence for Sustainable Development) system to fulfill the fore-mentioned strategies.

  • PDF

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

A Model for Improving Performance Structure of Build-Transfer-Lease in Small Public Educational Facilities (소규모 공공교육 시설 임대형 민자사업(BTL)의 수행구조 개선모델)

  • Kim, Seung-Sup;Jung, Sang-Min;Koo, Choong-Wan;Koo, Kyo-Jin;Hyun, Chang-Taek;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.116-124
    • /
    • 2007
  • It is Increasing that requirements of social infrastructure which includes educational, welfare, cultural facilities for public. Government introduced BTI(Build-Transfer-Lease) as a PFI(Private Financial Initiative) system. This research is about BTL projects in small public educational facilities. Some problems when BTL system is applied to small public educational facilities are identified, and the reason of those problems are examined. This research proposes alternatives in a institutional way and it proposes improvements in contractual structure of consortium when BTL system is applied. Based on reasonable system, it promotes creativeness and effectiveness of a project, and it makes local minor construction companies participate in BTL project without difficulties as mentioned.

Identification and Effect Analysis of Risk Factors for Build Transfer Lease Projects (BTL민간투자사업의 리스크 식별 및 영향도 분석에 관한 연구)

  • Jung, Jung-Man;Park, Young-Min;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.47-56
    • /
    • 2007
  • The Build-Transfer-Lease(BTL) system is a new way of attracting private capital to social infrastructure construction projects. Private companies will get back their investment by leasing facilities to the government. In January 2005, government introduces a 'Korean New Deal Policy' to initiate BTL system in the field of social infrastructure development such as education, public welfare, housing, culture etc. As BTL being still in premature phase, thus it is lack of knowledge in BTL and there is no such studies about problems and impacts of BTL projects. However, there could be so many problems underlying within BTL projects. Therefore, the purpose of this paper is to identify various risk factors during implementation of BTL projects. For this purpose, five BTL undertaking projects were studied. Field survey was conducted based-on interview instruments. Prevailing risk factors in operating the BTL Project were collected from the both officials of project promoters and concessionaires. In addition, a distinct need has emerged for analysis of risk factors for BTL projects. Based on real cases, this study resulted in risk factors influencing every phases and grouped risk factors into each phase. Moreover, this study also perform sensitivity analysis in order to know how risk factors affect to BTL projects. From analyzing the data, the study addresses that both major BTL project participants 'the competent authority' and 'Special purpose company(SPC)' have many problems and difficulties to operate the projects.