• Title/Summary/Keyword: Spare Ordering

Search Result 12, Processing Time 0.015 seconds

Reliability growth management for the delayed fixes and development cost in the reliability growth development phase (신뢰성 성장 개발단계에서 지연수정과 개발시험비용을 고려한 신뢰성 성장관리)

  • Kim, Jun-Hong;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.5 no.3
    • /
    • pp.381-391
    • /
    • 2005
  • The level of reliability attained largely depends upon the investment in reliability growth programs during development phase. In order to find the relationship between reliability growth test time and BRTE(basic reliability tasks effectiveness) in a reliability improvement program that minimizes LCC in which contains the reliability growth cost, repair and replacement costs, and spare parts ordering costs in service with given service rate in management policy, the growth rate has been suggested proper LCC versus growth rate. This model employs the reliability growth projection with delayed fixes in avionic equipment based on AMSAA.

  • PDF

A Study on the Successful Factors in the Application of RIMS Project for the Safe Operation of Rolling Stocks in the Public Transportation (공공교통 전동차 안전운행을 위한 RIMS 프로젝트 적용의 성공요인 연구)

  • Lee, Kang-Won;Bhang, Youn-Keun;Son, Young-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.555-560
    • /
    • 2006
  • This study finds out and suggests success factors for the application of RIMS project through the case study of Seoul Metro and literature survey. The successful application of RIMS needs expert knowledge and concept of BOM, standardization of maintenance planning, check lists of heavy maintenance inspection, organization structure of rolling stock maintenance offices, material management system of warehousing and the process of parts repairing between offices, connection of material ordering system, problem solving of circular spare parts administration among inspection, maintenance, and material organizational units, systemic serial number management of parts with RFID, daily closing diary connected with work process chart, and sufficient period of RIMS's test run. RIMS contributes to real time management of rolling stock maintenance, transparency of management, reliability of train operation, customer satisfaction, and management innovation.