A solar power plant is a facility that produces electricity. As the risk of fire and electric shock accidents is diversified, the risk of workers, surrounding people, and facilities is increased, preventing safety accidents and promptly responding to safety accidents Is emerging. In light of the necessity of such development, it is necessary to develop a solar power generation management system that can diagnose and maintain the problems of the power generation system in real time by developing technologies for collecting and analyzing the data produced by the solar power generation system As a result, the utilization rate and the maintenance cost can be reduced. In order to do this, it is necessary to accurately predict the solar power generation amount in the present state, to diagnose the abnormality of the current power generation state and to grasp the abnormal position, and to use the model considering economical efficiency when the abnormal position is grasped, And the time and other information should be provided.
In this paper, a novel utility connected photovoltaic power generation system with unity power factor and uninterruptable power system facility and its control strategy are proposed. The proposed photovoltaic(PV) system is connected in parallel between utility and load. The PV system provides an uninterruptable voltage to load, a maximum power tracking to solar array, and power factor correction to the utility. The proposed system has the following advantages compared with the conventional utility connected PV system. 1. Harmonic elimination Function 2. Feeding the photovoltaic energy to the utility 3. Providing the uninterruptible power source along battery to the load In case that the photovoltaic array system is on the poor power generation, the battery and capacitor of the PV system are charged by three phase utility source and the inverter in the PV system only provides the reactive current to eliminate the harmonic current exited on the utility. In the normal operation mode, the PV system supplies active power to load and reactive power to utility in order to maintain the unity power factor and to regulate ac load voltage.
Journal of the Korean Institute of Landscape Architecture
/
v.51
no.2
/
pp.131-142
/
2023
Solar power facilities to reduce carbon emissions are continuously being installed in forests, farmland, city, and on water. However, research on visual preferences and the psychological impact on observers after installing solar power facilities is insufficient. Therefore, in this study, shooting was conducted according to the viewing distance of the near, middle, and distant views of Hapcheon Dam, Korea's largest floating photovoltaic power plant. The acquired images were edited using Photoshop to compare the presence or absence of floating photovoltaic power generation facilities. In addition, psychological changes and visual preferences were analyzed through an EEG test and questionnaire among 50 participants. The results are summarized, as follows. First, the installation of water photovoltaic power generation facilities has a passive impact on the subjects' psychological changes and visual preference. Second, the psychological changes due to the installation of water photovoltaic power generation facilities were judged to affect almost all research subjects, regardless of nationality, gender, or universisty major. Third, the visual preference for installing the water photovoltaic power generation facility is low, which can be interpreted as the water photovoltaic power generation facility negatively affecting the "friendliness" and "naturalness" of the landscape. In addition, this change in visual preference was found to differ depending on the gender and universiity major of the subjects. Fourth, the psychological change and visual preference of the floating photovoltaic power generation facility according to the viewing distance, found that the close range had a higher effect than the middle and distant ranges.
The Journal of the Korea institute of electronic communication sciences
/
v.14
no.4
/
pp.693-700
/
2019
This paper studies on the optimum design space of solar power plant, application of efficiency improvement facility using various examples, lack of power cost, lack of land development and difficulty of permission. We analyze economic factors and profitability by deriving analysis factors according to the conditions of construction examples and variables by applying efficient facilities that can utilize idle space of individuals and public more efficiently through various cases.
The Transactions of the Korean Institute of Power Electronics
/
v.24
no.5
/
pp.356-364
/
2019
In this study, major problems, such as licensing problems due to civil complaints, deterioration of facility period, and damage of modules, are exposed to many problems in domestic businesses. Particularly, the photovoltaic (PV) modules applied to early PV systems have been repaired and replaced over the past two decades, and a new module-based aging detection method is needed to expand the maintenance market and stabilize and repair power supplies. PV modules in a PV system use a string that is configured in series to generate high voltage. However, even if only one module of the solar modules connected in series ages, the power generation efficiency of the aged string is reduced. Therefore, we propose a topology that can measure the instantaneous PV characteristic curve to determine the aging module in the solar string and the aging judgment algorithm using the measured PV characteristic curve.
Due to changes in the distribution system and increased demand for renewable energy, interest in technology to increase the limit capacity of distributed energy grid connection using grid flexible resources is also increasing. Recently, the distribution system system is changing due to the increase in distributed power from renewable energy, and as a result, problems with the limited capacity of the distribution system, such as waiting for renewable energy to connect and increased overload, are occurring. According to the power generation facility status report provided by the Korea Power Exchange, of the total power generation capacity of 134,020 MW as of 2021, power generation capacity through new and renewable energy facilities is 24,855 MW, accounting for approximately 19%, and among them, power generation through solar power accounts for a total portion of the total. It was analyzed that the proportion of solar power generation facilities was high, accounting for 75%. In the future, the proportion of new and renewable energy power generation facilities is expected to increase, and accordingly, an efficient operation plan for the distribution system is needed. Advanced country-type NWAs that can integrate the operation and management of load characteristics for each line of the distribution system, power distribution, regional characteristics, and economic feasibility of distributed power in order to improve distribution network use efficiency without expanding distribution facilities due to the expansion of renewable energy. An integrated operating system is needed. In this study, in order to improve the efficiency of distribution network use without expanding distribution facilities due to the expansion of renewable energy, we developed a method that can integrate the operation and management of load characteristics for each line of the distribution system, power distribution, regional characteristics, and economic feasibility of distributed power. We want to develop an integrated operation system for NWAs similar to that of advanced countries.
With the recent accelerated policy-making and interests in new renewable energy, plans to develop and supply the new renewable energy have been devised across multiple regions in Korea. Solar energy, in particular, is being applied to small-scale power supply in provincial areas, as solar cells are used to convert solar energy into electric energy to produce electric power. Nonetheless, in the case of solar power plants, the need for a large stretch of land and considerable sum of financial support implies that the planning step should take into consideration the most suitable meteorological and geographical factors. In this study, the proxy variables of meteorological and geographical factors associated with solar energy were considered in analyzing the vulnerable areas regarding the photovoltaic power generation facility across the nation. GIS was used in the spatial analysis to develop a map for assessing the optimal location for photovoltaic power generation facility. The final vulnerability map developed in this study did not reveal any areas that exhibit vulnerability level 5 (very high) or 1 (very low). Jeollanam-do showed the largest value of vulnerability level 4 (high), while a large value of vulnerability level 3 (moderate) was shown by several administrative districts including Gwangju metropolitan city, Jeollabuk-do, Chungcheongbuk-do, and Gangwon-do. A value of vulnerability level 2 (low) was shown by the metropolitan cities including Daegu, Ulsan, and Incheon. When the 30 currently operating solar power plants were compared and reviewed, most were found to be in an area of vulnerability level 2 or 3, indicating that the locations were relatively suitable for solar energy. However, the limited data quantity for solar power plants, which is the limitation of this study, prevents the accuracy of the findings to be clearly established. Nevertheless, the significance of this study lies in that an attempt has been made to assess the vulnerability map for photovoltaic power generation facility targeting various regions across the nation, through the use of the GIS-based spatial analysis technique that takes into account the diverse meteorological and geographical factors. Furthermore, by presenting the data obtained for all regions across the nation, the findings of this study are likely to prove useful as the basic data in fields related to the photovoltaic power generation.
Currently the variety of governmental business support and research for supplying solar energy have been actively progressed. As of now, however, There are no practical testing infrastructures of grid-connected photovoltaic system which test performance of solar power facility in domestic. Therefore, in KEPRI, there is in progress construction of practical testing ground of 500 kW class grid-connected PV System for developing the evaluation of the performance technology including the Module, PCS, and etc, that is the important instrument of the PV System, in Gochang area. It analyzed the site creation work for constructing the practical testing ground and new construction of control room and the unit standards, specifications and capacity of required equipment. For the system detailed design, configuration, instrument-specific parameters established, power generation predictions of Array Type and the components of testing ground are needed to build.
Journal of the Korea Academia-Industrial cooperation Society
/
v.20
no.10
/
pp.229-235
/
2019
A floating photovoltaic generation system is a new concept that combines existing photovoltaic generation technology with floating technology. This is installed in the water not on conventional land and a building. The system is designed as a unit module type that can be connected to other modules according to the power generation capacity, thereby forming a large-scale power generation facility. As a renewable energy source, it is composed of a floating structure, mooring device, photovoltaic power generation facility, and underwater cable. Because this system is installed outdoors, the effect of the wind load on the structure is very large. In this study, the wind loads most affected on the floating photovoltaic generation structure were obtained by computational fluid dynamic analysis. The flow characteristics and wind loads were analyzed for a range of wind orientations and angles of inclination. The analysis showed the position and magnitude of the maximum wind load to the wind direction and the flow characteristics around the solar panel and floating system. The wind load increased with increasing angle of inclination of the panel to the ground.
While the renewable energy portfolio standard (RPS) is in place to expand the scale of renewable energy generation, the power producer can obtain the renewable energy credit (REC) and use it as an incentive to operate the facility. RECs secured by solar power generation can be traded through spot market or fixed price contracts, and, in the spot market trading, power producers are exposed to the uncertainty of REC spot price. In this study, real option analysis is conducted to analyze the optimal threshold of REC spot price for the conversion of REC trading method by power producer considering the uncertainty of REC spot price. We calculated the optimal threshold of REC spot price that can convert the trading method of REC from spot market to fixed price contract. In conclusion, the spot market trading is a rational trading method when considering the uncertainty of REC price, but the fixed price bidding is a rational trading method when not considering the uncertainty of REC price.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.