• 제목/요약/키워드: Soil arresting structure

검색결과 2건 처리시간 0.015초

동해안 대형 산불피해지의 사방사업 실태진단 (The investigation of erosion control works' condition in East sea fire area)

  • 염규진;전근우;차두송;이시영;이현규;이명욱;김윤진;이진호;김석우;강기차부
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2007년도 정기총회 및 학술발표대회
    • /
    • pp.509-512
    • /
    • 2007
  • The fire area need management to prevent enlargement of collapes and sinkage. and it need that repair Vegetation sack work, Soil arresting structure, Terrace-sodding works, Direct seeding works in greening works and Water cushion in erosion control dam. The whole of the Concrete stream grade stabilization structures were broken, it need to be repair. As pass the time, a lot of structures were abandoned. Therefore, it need to reorganize erosion control structures and the method of construction in the fire area

  • PDF

일본 아시오(足尾) 銅鑛山地域의 삼림황폐와 삼림환경 복구사업에 관한 분석 (Forest Environment Degradation and Rehabilitation of Copper Mine Area in Ashio, Japan)

    • 한국환경생태학회지
    • /
    • 제15권3호
    • /
    • pp.276-285
    • /
    • 2001
  • 1880년대에 이미 대기오염물질에 의한 대규모 삼림이 황폐되었고. 그 후에 이를 복구하기 위해 막대한 예산을 투자하고 있는 일본 아시오(足尾) 지역을 대상으로 삼림황폐와 황폐산지 복구사업 현황을 분석하였다. 삼림황폐의 원인은 구리 제련과정에서 배출되는 아황산가스. 제련과 광산용 목재의 남벌 대형 산불 험준한 지형 불리한 기후조건 등의 복합적인 작용으로 분석할 수 있다. 1897년부터 3년 동안 2,399ha의 식수사업을 비롯한 황폐삼림의 복구사업이 지속적으로 추진되었으나, 삼림황폐와 재해발생이 계속되어 1956년에 황폐산지의 총면적은 2,400~3,000ha이었다. 1945년부터 1996년까지$\ulcorner$인력에 의한 방법$\lrcorner$, $\ulcorner$헬리콥터에 의한 방법$\lrcorner$, $\ulcorner$인력과 헬리콥터 조합방법$\lrcorner$에 의한 시공으로 산복 828.19ha와 계간 133개소에 복구공사를 실행하였다. 예산은 약 800억 엔이 투자되었다. 주요 복구공법은 기초공사로서 사방댐과 흙막이공사, 녹화공사로서 식생반공법과 식생대공법 및 식재 공법이며, 인력에 의한 3단계 시공으로 장소별 완전복구를 목표로 하고 있다. 전반적으로 시공지의 녹화율은 약 49% 정도이며. 완전히 녹화된 비율은 전체 시공지의 10%에도 미치지 못한 실정이다. 남아 있는 황폐산지에 대하여 향후 25년 동안 약 213억 엔을 투입하여 산복공사 564ha, 계간공사 183개소를 복구할 계획이지만. 완전히 복구하는 데에는 몇 년이 걸릴지 예측할 수 없는 상황이다. 이곳에서의 황폐산림 복구공법은 우리 나라의 폐광지 산비탈을 복구하는 데에 적용할 수 있을 것으로 기대된다.

  • PDF