• 제목/요약/키워드: Software Requirements Development

검색결과 557건 처리시간 0.022초

모듈형 환자감시기와 중앙 환자감시기로 구성되는 환자감시시스템 시제품의 개발: 전체구조 및 사양 (Development of a Prototype Patient Monitoring System with Module-Based Bedside Units and Central Stations: Overall Architecture and Specifications)

  • 우응제;박승훈;전병문;문창욱;이희철;김승태;김형진;서재준;채경명;박종찬;최근호;이왕진;김경수
    • 대한의용생체공학회:학술대회논문집
    • /
    • 대한의용생체공학회 1996년도 춘계학술대회
    • /
    • pp.315-319
    • /
    • 1996
  • We have developed a prototype patient monitoring system including module-based bedside units, interbed network, and central stations. A bedside unit consists of a color monitor and a main CPU unit with peripherals including a module controller. It can also include up to 3 module cases and 21 different modules. In addition to the 3-channel recorder module, six different physiological parameters of ECG, respiration, invasive blood pressure, noninvasive blood pressure, body temperature, and arterial pulse oximetry with plethysmogaph are provided as parameter modules. Modules and a module controller communicate with up to 1Mbps data rate through an intrabed network based on RS-485 and HDLC protocol. Bedside units can display up to 12 channels of waveforms with any related numeric informations simultaneously. At the same time, it communicates with other bedside units and central stations through interbed network based on 10Mbps Ethernet and TCP/IP protocol. Software far bedside units and central stations fully utilizes gaphical user interface techniques and all functions are controlled by a rotate/push button on bedside unit and a mouse on central station. The entire system satisfies the requirements of AAMI and ANSI standards in terms of electrical safety and performances. In order to accommodate more advanced data management capabilities such as 24-hour full disclosure, we are developing a relational database server dedicated to the patient monitoring system. We are also developing a clinical workstation with which physicians can review and examine the data from patients through various kinds of computer networks far diagnosis and report generation. Portable bedside units with LCD display and wired or wireless data communication capability will be developed in the near future. New parameter modules including cardiac output, capnograph, and other gas analysis functions will be added.

  • PDF

원전 가동전/중 검사정보관리 시스템 개발 (Development of Pre-Service and In-Service Information Management System (iSIMS))

  • 유현주;최성남;김형남;김영호;양승한
    • 비파괴검사학회지
    • /
    • 제24권4호
    • /
    • pp.390-395
    • /
    • 2004
  • iSIMS는 한국 수력원자력 주식회사의 원자력발전소에서 수행하는 가동전/중 검사 절차를 지원하는 웹베이스의 통합 정보 시스템이다. 이 시스템은 가동전/중 검사에 적합한 적용규격(CODE, Standards) 및 규제기관에서 원하는 규제조건 등과 부합하는 검사 계획단계에서 최종 보고서 단계까지의 전체 검사공정을 지원하는데 목적을 두고 있다. 이 시스템의 주요 기능은 검사계획, 검사 및 보고서출력, 검사과정 통제 및 해당 검사부위의 정보 찾기와 그 부위를 비쥬얼하게 찾아 갈 수 있는 자원관리 부분으로 구성된다 본 시스템은 해당 용접부에 대해 2D로 된 위치정보와 3D로 제공되는 비쥬얼정보를 제공하고 이들은 데이터베이스 응용프로그램과 인터페이스 하여 서로에 대한 정보를 공유하여 사용자에게 제공한다. iSMIS는 데이터베이스 관리 도구, 2D와 3D 비쥬얼 도구 등의 상용 소프트웨어 패키지를 사용하여 구현하였다. iSIMS에 대한 주요 기능과 기술은 본문에 기술하였다.

선박 모니터링을 위한 PNUSAT-1 큐브위성 시스템 예비 설계 (Preliminary Design of PNUSAT-1 Cubesat for Vessel Monitoring)

  • 김해리;조동현;이상훈;박찬휘;임하경;김건우;곽민우;이창현;김신형;구인회;이대우
    • 한국항공우주학회지
    • /
    • 제50권2호
    • /
    • pp.137-146
    • /
    • 2022
  • 선박자동식별장치(Automatic Identification System, AIS)는 선박의 정보를 자동으로 송수신하는 장치로 선박에 탑재된다. 연안 인근 선박의 AIS 정보는 지상에서 수신 가능하지만, 50해리 이상의 먼 해상으로 나가게 되면 지상과 통신이 두절되는 한계점을 가진다. 이를 해결하기 위해 AIS 수신기를 탑재한 AIS 위성을 통하여 먼 해상의 선박 정보를 지상으로 전송할 수 있다. 국내에서는 아직 AIS 위성 개발 사례가 없으며, 국내 다수의 선사는 해외의 AIS 서비스를 이용하고 있다. PNUSAT-1은 부산대학교에서 개발 중인 1U+ 큐브위성으로, 선박 모니터링을 위해 AIS 수신기를 탑재하여 선박 정보를 지상으로 전달하는 임무를 수행한다. PNUSAT-1은 임무 데이터가 텍스트 형태로 큰 용량의 데이터를 전송하지 않으므로 이에 부합하는 통신 장비, 저정밀 센서 및 구동기를 선택하였다. 본 논문에서 PNUSAT-1의 시스템 예비 설계를 수행하였으며, 임무 수행을 위한 요구사항, 운용 시나리오 및 모드 설계, 하드웨어 및 소프트웨어 선정 그리고 각 서브시스템의 예비설계를 수행하였다.

IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가 (Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis)

  • 이진강;송보현;김다인;최재현
    • 한국건축시공학회지
    • /
    • 제24권1호
    • /
    • pp.145-156
    • /
    • 2024
  • 건설 프로젝트의 규모와 복잡성이 커지는 가운데, 체계적이고 통합적인 공정관리의 실행은 국내 건설 산업의 도전과제로 남아있다. 이러한 배경에서 본 연구는 먼저 종합적인 관점에서 공정관리 역량을 제도 및 규정, 발주자 요구사항, 전문 인력 및 조직, 공정관리 관련 업무, 스마트건설 기술 활용 5개 분야로 정의하였다. 그리고 국내 건설 산업 종사자를 대상으로 각 분야별 공정관리 역량 요소별로 중요성과 현재수준을 평가하는 설문을 진행하고 IPA분석을 실시하여 국내 건설 산업의 공정관리 역량을 분석하였다. 이를 통해 공정관리 역량을 구성하는 다양한 요소를 대상으로 중요성을 인식되고 있지만, 현재 수준과의 격차가 존재함을 밝혀, 개선이 필요한 영역을 제시하였다. 특히 개선이 필요한 영역으로는 발주처의 공정 관리를 위한 예산 확보, 공사 기간의 적정성 산전 및 평가기준 수립, 현장 공정 관리 인력의 배치, 공정 관리 소프트웨어에 대한 투자 등이 꼽혔다. 이와 같이 본 연구는 국내 건설 산업의 공정 관리 역량에 대한 자세한 시각과 개선방향을 제시하였으며, 이는 공정관리 실무적용을 활성화하는데 도움이 될 것으로 기대된다.

통합병참지원에 관한 연구 (A Study on Integrated Logistic Support)

  • 나명환;김종걸;이낙영;권영일;홍연웅;전영록
    • 한국신뢰성학회:학술대회논문집
    • /
    • 한국신뢰성학회 2001년도 정기학술대회
    • /
    • pp.277-278
    • /
    • 2001
  • The successful operation of a product In service depends upon the effective provision of logistic support in order to achieve and maintain the required levels of performance and customer satisfaction. Logistic support encompasses the activities and facilities required to maintain a product (hardware and software) in service. Logistic support covers maintenance, manpower and personnel, training, spares, technical documentation and packaging handling, storage and transportation and support facilities.The cost of logistic support is often a major contributor to the Life Cycle Cost (LCC) of a product and increasingly customers are making purchase decisions based on lifecycle cost rather than initial purchase price alone. Logistic support considerations can therefore have a major impact on product sales by ensuring that the product can be easily maintained at a reasonable cost and that all the necessary facilities have been provided to fully support the product in the field so that it meets the required availability. Quantification of support costs allows the manufacturer to estimate the support cost elements and evaluate possible warranty costs. This reduces risk and allows support costs to be set at competitive rates.Integrated Logistic Support (ILS) is a management method by which all the logistic support services required by a customer can be brought together in a structured way and In harmony with a product. In essence the application of ILS:- causes logistic support considerations to be integrated into product design;- develops logistic support arrangements that are consistently related to the design and to each other;- provides the necessary logistic support at the beginning and during customer use at optimum cost.The method by which ILS achieves much of the above is through the application of Logistic Support Analysis (LSA). This is a series of support analysis tasks that are performed throughout the design process in order to ensure that the product can be supported efficiently In accordance with the requirements of the customer.The successful application of ILS will result in a number of customer and supplier benefits. These should include some or all of the following:- greater product uptime;- fewer product modifications due to supportability deficiencies and hence less supplier rework;- better adherence to production schedules in process plants through reduced maintenance, better support;- lower supplier product costs;- Bower customer support costs;- better visibility of support costs;- reduced product LCC;- a better and more saleable product;- Improved safety;- increased overall customer satisfaction;- increased product purchases;- potential for purchase or upgrade of the product sooner through customer savings on support of current product.ILS should be an integral part of the total management process with an on-going improvement activity using monitoring of achieved performance to tailor existing support and influence future design activities. For many years, ILS was predominantly applied to military procurement, primarily using standards generated by the US Government Department of Defense (DoD). The military standards refer to specialized government infrastructures and are too complex for commercial application. The methods and benefits of ILS, however, have potential for much wider application in commercial and civilian use. The concept of ILS is simple and depends on a structured procedure that assures that logistic aspects are fully considered throughout the design and development phases of a product, in close cooperation with the designers. The ability to effectively support the product is given equal weight to performance and is fully considered in relation to its cost.The application of ILS provides improvements in availability, maintenance support and longterm 3ogistic cost savings. Logistic costs are significant through the life of a system and can often amount to many times the initial purchase cost of the system.This study provides guidance on the minimum activities necessary to Implement effective ILS for a wide range of commercial suppliers. The guide supplements IEC60106-4, Guide on maintainability of equipment Part 4: Section Eight maintenance and maintenance support planning, which emphasizes the maintenance aspects of the support requirements and refers to other existing standards where appropriate. The use of Reliability and Maintainability studies is also mentioned in this study, as R&M is an important interface area to ILS.

  • PDF

데이터 웨어하우징의 구현성공과 시스템성공 결정요인 (Factors Affecting the Implementation Success of Data Warehousing Systems)

  • 김병곤;박순창;김종옥
    • 한국정보기술응용학회:학술대회논문집
    • /
    • 한국정보기술응용학회 2007년도 춘계학술대회
    • /
    • pp.234-245
    • /
    • 2007
  • The empirical studies on the implementation of data warehousing systems (DWS) are lacking while there exist a number of studies on the implementation of IS. This study intends to examine the factors affecting the implementation success of DWS. The study adopts the empirical analysis of the sample of 112 responses from DWS practitioners. The study results suggest several implications for researchers and practitioners. First, when the support from top management becomes great, the implementation success of DWS in organizational aspects is more likely. When the support from top management exists, users are more likely to be encouraged to use DWS, and organizational resistance to use DWS is well coped with increasing the possibility of implementation success of DWS. The support of resource increases the implementation success of DWS in project aspects while it is not significantly related to the implementation success of DWS in organizational aspects. The support of funds, human resources, and other efforts enhances the possibility of successful implementation of project; the project does not exceed the time and resource budgets and meet the functional requirements. The effect of resource support, however, is not significantly related to the organizational success. The user involvement in systems implementation affects the implementation success of DWS in organizational and project aspects. The success of DWS implementation is significantly related to the users' commitment to the project and the proactive involvement in the implementation tasks. users' task. The observation of the behaviors of competitors which possibly increases data quality does not affect the implementation success of DWS. This indicates that the quality of data such as data consistency and accuracy is not ensured through the understanding of the behaviors of competitors, and this does not affect the data integration and the successful implementation of DWS projects. The prototyping for the DWS implementation positively affects the implementation success of DWS. This indicates that the extent of understanding requirements and the communication among project members increases the implementation success of DWS. Developing the prototypes for DWS ensures the acquirement of accurate or integrated data, the flexible processing of data, and the adaptation into new organizational conditions. The extent of consulting activities in DWS projects increases the implementation success of DWS in project aspects. The continuous support for consulting activities and technology transfer enhances the adherence to the project schedule preventing the exceeding use of project budget and ensuring the implementation of intended system functions; this ultimately leads to the successful implementation of DWS projects. The research hypothesis that the capability of project teams affects the implementation success of DWS is rejected. The technical ability of team members and human relationship skills themselves do not affect the successful implementation of DWS projects. The quality of the system which provided data to DWS affects the implementation success of DWS in technical aspects. The standardization of data definition and the commitment to the technical standard increase the possibility of overcoming the technical problems of DWS. Further, the development technology of DWS affects the implementation success of DWS. The hardware, software, implementation methodology, and implementation tools contribute to effective integration and classification of data in various forms. In addition, the implementation success of DWS in organizational and project aspects increases the data quality and system quality of DWS while the implementation success of DWS in technical aspects does not affect the data quality and system quality of DWS. The data and systems quality increases the effective processing of individual tasks, and reduces the decision making times and efforts enhancing the perceived benefits of DWS.

  • PDF

UML의 부분-전체 관계에 대한 메타모델 형식화 이론의 적용: 집합연관 및 복합연관 판별 실험 (Applying Meta-model Formalization of Part-Whole Relationship to UML: Experiment on Classification of Aggregation and Composition)

  • 김태경
    • 지능정보연구
    • /
    • 제21권1호
    • /
    • pp.99-118
    • /
    • 2015
  • 정보 시스템 개발에 있어 객체지향 프로그래밍 언어가 널리 사용된다. 이와 함께 객체지향 설계를 뒷받침하는 개념적 모델링 언어에 관한 관심도 높다. 이를 배경으로 통합 모델링 언어 혹은 UML로 알려진 개념적 모델링 언어는 여러 객체 지향 프로그래밍 언어와 함께 사용되면서 사후적 표준으로 자리 잡았다. UML은 클래스를 설계의 중심에 둔다. 또한 클래스들 간의 관계를 통해 체계적인 이해를 가능하게 한다. 특히 부분에 해당하는 클래스들과 전체에 해당하는 클래스의 관계인 부분-전체 관계를 설계할 수 있는 문법 또한 UML에 포함된다. 현실 세계에 부분-전체 관계로 파악될 수 있는 여러대상들이 존재하고 비즈니스 활동에 존재하는 각종 역할들의 구조에서도 부분-전체 관계로 표현될 수 있는 대상들이 보편적으로 보인다. 따라서 UML로 클래스들 간의 부분-전체 관계를 드러내는 일은 자연스럽다. 문제는 부분-전체 관계를 파악하는 활동은 UML 2.0의 표준에 포함되었으나 실제 설계 과정에서 적극 활용하기 위한 실천적 이론화가 부족하다는 점이다. 부분-전체 관계를 집합연관과 복합연관으로 세분화한 UML 문법은 표현 양식에서 부족함은 없을지라도 어떤 대상을 부분-전체로 파악하고, 이를 어떻게 집합연관이나 복합연관으로 분류해야 할 것인지에 대한 판단이 쉽게 결여된다. 지금까지 UML의 부분-전체 관계 규명은 언어적 표현법을 활용하는 것에 치우쳤다. 이와 같은 문제에 대한 대안을 제시하기 위해 본 연구는 메타모델 형식화 이론을 기반으로 UML 사용자가 부분-전체 관계를 판단하고 이를 집합연관과 복합연관으로 분류할 수 있는 실천적 대안을 제시한다. 이를 활용한 실험의 결과 메타모델 형식화가 UML 사용자들에게 통용되어 온 언어적 구분법보다 더 나은 결과를 낳는다는 점이 밝혀졌다. 본 연구는 부분-전체의 판별과 구분에 도움을 주는 실용적인 방법을 제안하고 검증하였다는 점에서 의의가 있다.