• Title/Summary/Keyword: Software Development Project Management

Search Result 255, Processing Time 0.024 seconds

Improving Estimation Ability of Software Development Effort Using Principle Component Analysis (주성분분석을 이용한 소프트웨어 개발노력 추정능력 향상)

  • Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.9D no.1
    • /
    • pp.75-80
    • /
    • 2002
  • Putnam develops SLIM (Software LIfecycle Management) model based upon the assumption that the manpower utilization during software project development is followed by a Rayleigh distribution. To obtain the manpower distribution, we have to be estimate the total development effort and difficulty ratio parameter. We need a way to accurately estimate these parameters early in the requirements and specification phase before investment decisions have to be made. Statistical tests show that system attributes are highly correlation (redundant) so that Putnam discards one and get a parameter estimator from the other attributes. But, different statistical method has different system attributes and presents different performance. To select the principle system attributes, this paper uses the principle component analysis (PCA) instead of Putnam's method. The PCA's results improve a 9.85 percent performance more than the Putnam's result. Also, this model seems to be simple and easily realize.

A method for selecting the evaluation index of defence R&D project by AHP (계층분석법에 의한 국방연구개발 평가지표 선정에 관한 연구)

  • Park, Seong;Hong, Yeon-Woong;Na, Joong-Kyung
    • Journal of the Korean Data and Information Science Society
    • /
    • v.23 no.5
    • /
    • pp.961-970
    • /
    • 2012
  • To evaluate companies that participated in the defense R&D project, 27 variables are chosen through literature survey, feature analysis of defense R&D and interviews with military experts. 17 variables are selected after factor analysis which is applied to reduce the number of variables and to detect structure in the relationships among variables, that is to classify variables using Likert-type scales. And then 17 variables are prioritized by AHP (analytic hierarchy process) method. It is shown that communication skill & cooperation strategy, level of technology, possession of needs technology have high priorities. However, protection plan of technology leakage, expertise of subcontractors, software development plan have low priorities.

Analysis of Networks among Design Engineers Using Product Data Objects (제품자료 객체를 이용한 설계자 네트워크 분석)

  • Cha, Chun-Nam;Do, Namchul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.3
    • /
    • pp.139-146
    • /
    • 2016
  • This study proposes a methodology to analyse social networks among participating design engineers during product development projects. The proposed methodology enables product development managers or the participating design engineers to make a proper decision on product development considering the performance of participating design engineers. It considers a product development environment where an integrated product data management (PDM) system manages the product development data and associated product development processes consistently in its database, and all the design engineers share the product development data in the PDM database for their activities in the product development project. It provides a novel approach to build social networks among design engineers from an operational product development data in the PDM database without surveys or monitoring participating engineers. It automatically generates social networks among the design engineers from the product data and relationships specified by the participants during the design activities. It allows analysts to gather operational data for their analysis without additional efforts for understanding complex and unstructured product development processes. This study also provides a set of measures to evaluate the social networks. It will show the role and efficiency of each design engineers in the social network. To show the feasibility of the approach, it suggests an architecture of social network analysis (SNA) system and implemented it with a research-purpose PDM system and R, a statistical software system. A product configuration management process with synthetical example data is applied to the SNA system and it shows that the approach enables analysts to evaluate current position of design engineers in their social networks.

Analyses on Type and Characteristics of Urban Regeneration for Establishment of Urban Identity (도시정체성 확립을 위한 도시재생의 유형 및 계획특성 분석)

  • Lee, Joo-Hyung;Seo, Eui-Kweon;Lim, Jong-Hyun
    • KIEAE Journal
    • /
    • v.9 no.5
    • /
    • pp.85-96
    • /
    • 2009
  • This study analyzed a characteristic by types of urban regeneration helping the establishment of urban identity under social condition change. It will be foundation of sustainable urban development with strategy that secures world-wide competitive power. For this, sample cases that established identity from urban regeneration were reviewed about the main subject and the supporting subject in business side and hardware, software, system, and finance in design factors. 4samples each in inheritance intensification type and change creation type were selected and analyzed. The result said it is most effective to establish urban identity when inheritance intensification type is the private-centered for urban regeneration. And it is better to do the project that the main subject and the supporting subject are taken by the private or the private-leading partnership. It is necessary to manage the region and plan events with software design factors more than hardware design factors. In addition, for urban identity, it was found to be desirable to utilize and preserve fully current resources such as historical scenery and activate the communities than making new facilities. On the contrary, the project based on change creation type needs to be under the public management with innovative idea. Also, when it comes to design factors, facilities related to culture and art and community spaces should open and run actively. It is important for the region to improve its image by New design style such as TOD. In software side, it is important to manage the region by monitoring about urban regeneration business and solve social mix and employment problem. On the other hand, in terms of system and administration, both types don't show a difference in urban identity establishment, since it is same that both should make partnership and get a support of subsidy to be most effective.

Optimization Methodology for Sales and Operations Planning by Stochastic Programming under Uncertainty : A Case Study in Service Industry (불확실성하에서의 확률적 기법에 의한 판매 및 실행 계획 최적화 방법론 : 서비스 산업)

  • Hwang, Seon Min;Song, Sang Hwa
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.137-146
    • /
    • 2016
  • In recent years, business environment is faced with multi uncertainty that have not been suffered in the past. As supply chain is getting expanded and longer, the flow of information, material and production is also being complicated. It is well known that development service industry using application software has various uncertainty in random events such as supply and demand fluctuation of developer's capcity, project effective date after winning a contract, manpower cost (or revenue), subcontract cost (or purchase), and overrun due to developer's skill-level. This study intends to social contribution through attempts to optimize enterprise's goal by supply chain management platform to balance demand and supply and stochastic programming which is basically applied in order to solve uncertainty considering economical and operational risk at solution supplier. In Particular, this study emphasizes to determine allocation of internal and external manpower of developers using S&OP (Sales & Operations Planning) as monthly resource input has constraint on resource's capability that shared in industry or task. This study is to verify how Stochastic Programming such as Markowitz's MV (Mean Variance) model or 2-Stage Recourse Model is flexible and efficient than Deterministic Programming in software enterprise field by experiment with process and data from service industry which is manufacturing software and performing projects. In addition, this study is also to analysis how profit and labor input plan according to scope of uncertainty is changed based on Pareto Optimal, then lastly it is to enumerate limitation of the study extracted drawback which can be happened in real business environment and to contribute direction in future research considering another applicable methodology.

A Study on Software Fault Analysis and Management Method using Defect Tracking System (결함 추적 시스템에 의한 소프트웨어 결함 분석 및 관리기법 연구)

  • Joon, Moon-Young;Yul, Rhew-Sung
    • The KIPS Transactions:PartD
    • /
    • v.15D no.3
    • /
    • pp.321-326
    • /
    • 2008
  • The software defects that are not found in the course of a project frequently appear during the conduct of the maintenance procedure after the complete development of the software. As the frequency of surfacing of defects during the maintenance procedure increases, the cost likewise increases, and the quality and customer reliability decreases. The defect rate will go down only if cause analysis and process improvement are constantly performed. This study embodies the defect tracking system (DTS) by considering the Pareto principle: that most defects are repetitions of defects that have previously occurred. Based on the records of previously occurring defects found during the conduct of a maintenance procedure, DTS tracks the causes of the software defects and provides the developer, operator, and maintenance engineer with the basic data for the improvement of the software concerned so that the defect will no longer be manifested or repeated. The basic function of DTS is to analyze the defect type, provide the measurement index for it, and aggregate the program defect type. Doing these will pave the way for the full correction of all the defects of a software as it will enable the defect correction team to check the measured defect type. When DTS was applied in the software configuration management system of the W company, around 65% of all its software defects were corrected.

Development of Parametric BIM Libraries for Civil Structures using National 2D Standard Drawings (국가 표준도를 이용한 토목 구조물 BIM 파라메트릭 라이브러리 구축에 관한 연구)

  • Kim, Cheong-Woon;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.128-138
    • /
    • 2014
  • Development of infrastructure component libraries is a critical requirement for the accelerated adoption of BIM in the civil engineering sector. Libraries reduce the time for BIM model creation, allows accurate quantity take offs, and shared use of standard models in a project. However, such libraries are currently in very short supply in the domestic infrastructure domain. This research introduces library components for retaining walls and box culverts generated from 2D standard drawings made publicly available by MOLIT. Commercial BIM software was used to create the concrete geometry and rebar, and dimensional/volumetric parameters were defined to maximize the reuse and generality of the libraries. Use of the these libraries in a project context demonstrates that they allow accurate and quick quantity take offs, and easier management of geometric information through the use of a single library as to numerous 2D drawings. It also demonstrates the easy modification of the geometries of the components if and when they need to changed. However, the application also showed that some of the rebar components (stirrups and length wise rebars) do not get properly updated when concrete geometries are changed, demonstrating the limits of current software applications. The research provides evidence of the many advantages of using BIM libraries in the civil engineering, thus providing the incentive for further development of standard libraries and promoting the use of BIM in infrastructure projects.

Using Artificial Neural Network for Software Development Efforts Estimation on (인공신경망을 이용한 소프트웨어 개발공수 예측모델에 관한 연구)

  • Jeon, Eung-Seop
    • The Transactions of the Korea Information Processing Society
    • /
    • v.3 no.1
    • /
    • pp.211-224
    • /
    • 1996
  • In the research area of estimation of the software development efforts, a number of researches have been accomplished in order to control the costs and to make software more competitive. However, most of them were restricted to the functional algorithm models or the statistic models. Moreover, since they are dealing with the cases of foreign countries, the results are hard to apply directly to the domestic environment for the efficient project management because of lack of accuracy, fitness, flexibility and portability. Therefore, it is appropriate to suggest and propose a new approach supported by artificial neural network which is composed of back propagation and feel-forward algorithms to improve the exactness of the efforts estimation and to advance practical uses. In this study, the artificial neural network approach is used to model the software cost estimation and the results are compared with the revised COCOMO and the multiregression model in order to validate the superiority of the model.

  • PDF

A Proposal of the Usage Metering Functions on Cloud Computing-Based Building Information Modeling (BIM) and the Law for the Open BIM Ecosystem (열린 BIM 생태계 조성을 위한 클라우드 컴퓨팅 기반 BIM 서비스 환경의 사용량 측정 기술 및 법 규정 제안)

  • Kim, Byungkon;Kim, Jongsung
    • Journal of KIBIM
    • /
    • v.6 no.3
    • /
    • pp.49-56
    • /
    • 2016
  • As project opportunities for the Architecture, Engineering and Construction (AEC) industry have grown more complex and larger, the utilization of Building Information Modeling (BIM) technologies for three-dimensional (3D) design and simulation practices has been increasing significantly; the typical applications of the BIM technologies include clash detection and design alternative based on 3D planning, which have been expanded over to the technology of construction management in the AEC industry for virtual design and construction. As for now, commercial BIM software has been operated under a single-user environment, which is why initial costs for its introduction are very high. Cloud computing, one of the most promising next-generation Internet technologies, enables simple Internet devices to use services and resources provided with BIM software. Recently in Korea, studies to link between BIM and cloud computing technologies have been directed toward saving costs to build BIM-related infrastructure, and providing various BIM services for small- and medium-sized enterprises (SMEs). This study addressed development of the usage metering functions of BIM software under cloud computing architecture in order to archive and use BIM data and create an optimal revenue structure so that the BIM services may grow spontaneously, considering a demand for cloud resources. For the reason, we surveyed relevant cases, and then analyzed needs and requirements from AEC industry. Based on the relevant cases, customizing for cloud BIM and design for the development was performed. We also surveyed any related-law to support cloud computing-based BIM service. Finally, we proposed herein how to optimally design and develop the usage metering functions of cloud BIM software.

Development of a Web-based Schedule Tool Using Flash (플래시를 이용한 웹기반 일정관리 도구 개발)

  • Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.51-57
    • /
    • 2010
  • Schedule management of construction work is important in order to complete construction projects within a given period of time. As activities increase and relations become more complex, schedule management software becomes increasingly necessary. To address this, attempts are being made to incorporate web-based ICT (information and communications technology) in construction project management. This research proposed a method to manage construction schedules via web pages using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A prototype was implemented using Flash and Action Script, and it was applied to a sample network in a web page.