• 제목/요약/키워드: Small hydro

검색결과 243건 처리시간 0.023초

강우상태에 의한 소수력발전소 설계인자의 영향 (The Effects of Design Parameters for Small Scale Hydro Power Plant with Rainfall Condation)

  • 박완순;이철형
    • 한국태양에너지학회 논문집
    • /
    • 제28권1호
    • /
    • pp.43-49
    • /
    • 2008
  • The effects of design parameters for small scale hydro power(SSHP) plants due to rainfall condition have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis for rainfall conditions based on Weibull distribution show that the capacity and load factor of SSHP site had large difference between the variation of shape and scale parameter. Especially, the hydrologic performance of SSHP site due to variation of shape parameter varied more sensitive than the case of variation of scale parameter. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.

소수력발전 성능특성 분석기법 연구 (Performance Analyzing Technique of Small Hydro Power)

  • 박완순;이철형
    • 한국태양에너지학회 논문집
    • /
    • 제21권1호
    • /
    • pp.21-25
    • /
    • 2001
  • A methodology to predict the output performance of small hydro power using discharge of sewage treatment plant has been studied. Two sewage treatment plants existing in Chunrabuk-Do were selected and the output performance characteristics for these plants were analyzed, using developed model. As a result, it was found that the developed model in this study can be used to analyze the output characteristics for small hydro power using discharge of sewage treatment plant. Additionally, primary design specifications such as design flowrate, capacity, operational rate and annual electricity production were estimated and discussed for two plants.

  • PDF

기후변화에 의한 소수력발전소 설계변수의 영향 (The Effects of Design Parameters for Small Scale Hydro Power Plant with Climate Change)

  • 박완순;이철형
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2009년도 추계학술발표대회 논문집
    • /
    • pp.267-272
    • /
    • 2009
  • The effects of design parameters for small scale hydro power(SSHP) plants due to rainfall condition have been studied. The model to predict hydrologic performance for SSHP plants is used in this study. The results from analysis for rainfall conditions based on KIER model show that the capacity and load factor of SSHP site had large difference between the period. Especially, the hydrologic performance of SSHP site due to rainfall condition of recent period varied in design flowrate sensitively. And also, the methodology represented in this study can be used to decide the primary design specifications of SSHP sites.

  • PDF

수계별 소수력자원의 수문학적 성능특성 (Hydrologic Performance Characteristics of Small Hydro Power Resources for River Systems)

  • 박완순;이철형
    • 한국태양에너지학회 논문집
    • /
    • 제30권2호
    • /
    • pp.65-71
    • /
    • 2010
  • The hydrologic performance characteristics of small hydro power(SHP) sites located in four major river systems have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow caused from rainfall condition. And another model to predict hydrologic performance for SHP plants is established. Monthly inflow data measured at Andong dam for 32 years were analyzed. The predicted results from the developed models in this study showed that the data were in good agreement with measured results of long term inflow at Andong dam. The results from hydrologic performance analysis for SHP sites located on five major river systems based on the models developed in this study show that the specific design flowrate and specific output of SHP site have large difference between the river systems.

해양소수력발전소 튜블러 수차 성능평가를 위한 현장시험 (Field Test for Performance Evaluation of a Tubular Turbine in Marine Small Hydro Power Plant)

  • 황영호;이영호;최영도
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제35권8호
    • /
    • pp.1070-1077
    • /
    • 2011
  • 본 연구는 해양소수력발전소에서의 튜블러 수차의 성능평가를 위한 현장시험 및 그 결과에 대한 내용을 포함하고 있다. 현장시험용 수차의 발전기 최소출력은 측정된 유효낙차, 출력 그리고 효율을 이용하여 검토되었다. 정격 및 최대 출력시험은 수차 설치현장의 조수간만의 차에 의한 영으로 인하여 동일한 실험조건을 확보할 수 없었기 때문에 모델시험에 의한 성능 데이터를 이용하여 환산된 값을 사용하였다. 현장시험에 의한 수차의 성능은 최소출력, 정격출력, 최대출력 운전점에서 보증출력 및 보증효율을 만족시키는 결과를 나타냄을 확인하였다.

장기유입량 변화에 의한 소수력발전소 성능특성분석 (Analysis of Performance Characteristic for Small Scale Hydro Power Plant with Long Term Inflow Condition Change)

  • 박완순;이철형
    • 신재생에너지
    • /
    • 제5권4호
    • /
    • pp.39-43
    • /
    • 2009
  • The variation of inflow at stream and hydrologic performance for small scale hydro power(SSHP) plants due to climate change have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow caused from rainfall condition. And another model to predict hydrologic performance for SSHP plants is established. Monthly inflow data measured at Andong dam for 32 years were analyzed. The existing SSHP plant located in upstream of Andong dam was selected and analyzed hydrologic performance characteristics. The predicted results from the developed models show that the data were in good agreement with measured results of long term inflow at Andong dam and the existing SSHP plant. Inflow and ideal hydro power potential had increased greatly in recent years, however, these did not lead annual energy production increment of existing SSHP plant. As a results, it was found that the models represented in this study can be used to predict the primary design specifications and inflow of SSHP plants effectively.

  • PDF

초소수력발전용 좁은 수로 고정형 수직수차 성능실험 (Experiments on Efficiency of Standing Type Waterwheel with Narrow Canal for Micro/Small Scale Hydro Power Plant)

  • 김동진;이경호;안국찬;김봉환;이치우
    • 한국기계가공학회지
    • /
    • 제11권5호
    • /
    • pp.104-108
    • /
    • 2012
  • Recently, small scale hydropower needs to be developed due to its clean, renewable and abundant energy resources. However, suitable draft of hydro-turbine body in combination with differences in wheel blade shapes is not determined yet in the range of small hydropower and it is necessary to study for the effective draft in combination with type. Therefore, watermill shaped of 250mm diameter. hydro-turbine aiming 20 watt class generator is adopted in this study because of its simple structure and high possibility of applying to small hydropower. The result shows that effective draft for the turbine body is variable concerning the size of turbine and flow rate of water. Thus, the difference of water depth between fore and aft turbine body contributes to the increase of torque, angular momentum and power output.

Technical feasibility study for power generation from a potential mini hydro site nearby Shoolini University

  • Pundir, Anil;Kumar, Anil
    • Advances in Energy Research
    • /
    • 제2권2호
    • /
    • pp.85-95
    • /
    • 2014
  • Small Hydro-Power (SHP) is an environmental friendly technology. Usually hydro power generation projects are viewed as constructing large dams and reservoirs but available new research and engineering techniques have helped hydro power generation without large dams and without large reservoirs. In India, there are several water installations, irrigation dams, canals, streams or running rivers not tapped to generate power. In these cases the existing system and facilities can help in generating power with less investment and time. This area is yet unexplored. Harnessing a stream for hydroelectric power is a major undertaking for the energy crises and the global issues to go green. In this technical note a potential site for mini hydro power plant nearby Shoolini University is identified and examined for the economic feasibility.

한국의 다목적댐 수력발전 체계 - 투자의 정당화와 경제적 운영 - (Hydro-electric Power Generation System of Multi-purpose Dams in Koresa - A Framework for Investment Justification and Economic Operation -)

  • 이승규;박용삼
    • 경영과학
    • /
    • 제12권1호
    • /
    • pp.157-173
    • /
    • 1995
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

  • PDF

저낙차 수자원활용을 위한 카프란수차 개발 (Development of Kaplan Type Turbine for Low Head Hydro Resources)

  • 이철형;박완순
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2007년도 학술발표회 논문집
    • /
    • pp.1992-1996
    • /
    • 2007
  • The Kaplan turbine model has been tested and analized. The blade angle and the guide vane opening of the turbine model were designed to be varied according to the best combination of guide vane and runner blade opening. When the changes in head and output were comparatively large, the efficincy drop were small, so the efficiency characteristics and stability of the entire operating condition were maintained in good condition. These results showed that the developed model in this study will be suitable for small hydro power stations with large changes in head and load.

  • PDF