• Title/Summary/Keyword: Skill Building

Search Result 106, Processing Time 0.079 seconds

A Study on activation way of vocational education training for construction skill manpower problems solution (건설기능인력난 해결을 위한 직업교육훈련의 활성화 방안에 관한 연구)

  • Lee, Seung-Jae;Oh, Sangl-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.133-137
    • /
    • 2006
  • Can examine cause that the construction industry is faced in crisis of skill exhaustion in two sides. One is the tribe of actuality production manpower by entry evasion and graying of young man class specially new manpower to the tribe of skill manpower. Another is qualitative decline of skill manpower. Generally, problem of the systematic knowledge tribe and the picking up tribe about new technology etc, exists because learn skill for shoulder beyond in spot. In cutting phenomenon of skill that is depended on personal relationships availability with skilled worker in hereafter, problem that worker who is old or enter through rain skilled worker does not learn all life skill is detected. These problems institute entry of young man class and necessity of systematic vocational education training specially new human strength strongly. This study does presentation of way to promote construction industry entry of young man class and improvement way of vocational education training system that can do to train these by function manpower by purpose.

  • PDF

Visualization Based Building Anatomy Model for Construction Safety Education

  • Pham, Hai Chien;Le, Quang Tuan;Pedro, Akeem;Park, Chan Sik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.430-434
    • /
    • 2015
  • Safety education at the tertiary level prepares students to enter construction industry with adequate safety knowledge; then accidents can be prevented proactively. However, safety subject has not been paid adequate attention in universities and most institutional safety programs consider safety matters in isolation. Meanwhile, anatomical theory in the medicine field has been successfully adopted and proved potential advantageous in various scientific disciplines. With this regard, this study proposes a visualization based Building Anatomy Model (BAM) for construction safety education, which utilizes the anatomical theory in order to improve student's safety knowledge and practical skill. This BAM consists of two modules: 1) Knowledge Acquisition Module (KAM) aims to deliver safety knowledge to students through building anatomy models; 2) Practical Experience Module (PEM) where students safely perform construction activities by using the system to improve safety skill. The system trial is validated with virtual scenarios derived from real accidents cases. This study emphasizes the visualization based building anatomy model would be a powerful pedagogical method to provide effectively safety knowledge and practical skill for students, as a result, safety competence of students would be enhanced.

  • PDF

Comparative Study on Awards System of Australia and Wage Rate in Construction of Korea (호주 어워드 시스템과 국내 건설공사 시중노임단가 체계 비교연구)

  • Lim, Chaeyeon;Baek, Seung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.70-71
    • /
    • 2018
  • The labor cost on construction project of Korea is calculated based on the Wage Rate in Construction of Korea which is published by Construction Association of Korea. The Wage Rate in Construction of Korea does not have any variation on the wage following skill level of labor although it has 123 work categories. In addition, the classification on skill level and career of construction labor in Korea does not defined. Therefore, to establish the concept of the classification on skill level and career of construction labor, this study aim to compare the difference between Wage Rate in Construction of Korea with Award system which present grade on skilled labor.

  • PDF

A treatise about the institute training composition plan of construction skill human resource (건설기능인력의 기술훈련 구성에 관한 연구)

  • 임재영;오상근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.117-120
    • /
    • 2003
  • The purpose of this study solves both duality of construction and the economic problem of the daily laborer with activation of a construction skill human resource institute training. For the fixation of actuality institute training, the support and intervention of the public are necessary. Especially, to win young people over to construction job-site, we should analyze what they want and arrange and do information work institutionalized conditions that can satisfy their demand. Also institute training program must be reorganized to make them be acknowledged as a expert and social conditions is arranged so that they work self-conceit.

  • PDF

The Development of Automatic Module for Formwork Layout using the BIM

  • Chijoo Lee;Sungil Ham;Ghang Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1266-1271
    • /
    • 2009
  • Formwork layout is perceived as important due to its strong tie to site works. But, most formwork is done manually and influenced by worker's skill and thus, a lot of construction errors occur. The introduction of BIM (Building Information Modeling) enables acquiring more precise information on the building shape, dimension, structure, etc. than 2D-based drawings and thus, the increased productivity, such as reduction of workload and work times, and the economic efficiency, such as reduction of formwork types and form dimensions with the consideration of constructability, are expected. This study reviewed the previous studies and formwork layout systems to derive this study's differentiations and factors to be first considered for formwork planning were derived by analyzing priorities against consideration factors. Last, a flow chart and algorithm were developed to apply the derived factors to the formwork layout module.

  • PDF

Extraction and Analysis for Emphasis Development Field in Green Construction Technology (녹색 건설기술의 중점 개발 영역에 대한 추출 및 분석)

  • Yang, Jin-Kook;Shin, Sung-Joon;Kim, Ki-Nam;Hwang, Chi-Ho;Jang, Yun-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.306-307
    • /
    • 2014
  • Green building technology has the potential a competitiveness. Reflecting this situation, the renewable energy market is growing rapidly. And, this field became value-added field in construction industry. In this study perform to prioritize the value improvements of green building technologies. To do this, first, we will extract potential development field through literature and case studies. Next, we will built a hierarchy structure based on the economic efficiency, technical skill, and policy. Third, we decide to prioritize between the items by performing AHP analysis.

  • PDF

Current Status of Technical Development for TBM Simulator (국내·외 TBM 시뮬레이터 개발 현황)

  • Choi, Soon-Wook;Lee, Chulho;Kang, Tae-Ho;Chang, Soo-Ho
    • Tunnel and Underground Space
    • /
    • v.30 no.5
    • /
    • pp.433-445
    • /
    • 2020
  • Professional TBM Operator is in short supply worldwide, and insufficient construction experience of new personnel using TBM can lead to a decline in response capabilities when various construction risks occur. The fact that the TBM construction quality greatly depends on the skill and experience of the TBM operator, and the decrease in productivity due to insufficient skilled manpower, and the decrease in safety due to the decrease in skill level are frequently discussed problems in the TBM industry. To this end, several overseas companies and organizations have developed simulators, and a simulator is being developed in Korea. The International Tunneling Association is planning a comprehensive training, including classroom training, e-learning, simulator training and field training. Given the progress at home and abroad, TBM driver training and formal recognition of training through certification or licensing is expected to become the norm in the near future.

A Study in the Water Leakage Prevention around the Windows with the Stone Materials in the Apartment House (공동주택 외부 석재마감에 따른 창호주위 누수방지에 관한 연구)

  • Yun, Hong-Jung;Cho, Tae-Jea
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.117-121
    • /
    • 2006
  • This study intends to suggest the effective methods for water leakage prevention around the windows in stone works to up-grade the outdoor public space that has been taken much portion of apartment housing trends. The subjects of the study was selected among the domestic subcontractors of stone works. There are four methods for water leakage prevention around the windows; Firstly, the painting water-proof method after the masonry. Secondly, the urethane water-proof method after galvanizing panels on the gap. Thirdly, the separation method between stone and substructure and the last one is water-proof method that they put some water-proof screen between stone and substructure with the EPDM sheets. According to the analysis of the water-proof effects, constructability and planning, we could approach to conclusion that the most influent items to the water-leakage are the filling material's deformation, the state of oxygenation and deterioration of work skill. Among the water-proof methods in construction the EPDM sheet is most excellent water-proof method to meet the technical conditions. However, we have to apply it to stone works as a water-proof method for the decrease of the leakage defects after standardizing the materials, test and construction skill because there are many work skills according the subcontractors.

  • PDF

A Low-Cost Approach for Path Programming of Terrestrial Drones on a Construction Site

  • Kim, Jeffrey;Craig, James
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.319-327
    • /
    • 2022
  • Robots for construction sites, although not deeply widespread, are finding applications in the duties of project monitoring, material movement, documentation, security, and simple repetitive construction-related tasks. A significant shortcoming in the use of robots is the complexity involved in programming and re-programming an automation routine. Robotic programming is not an expected skill set of the traditional construction industry professional. Therefore, this research seeks to deliver a low-cost approach toward re-programming that does not involve a programmer's skill set. The researchers in this study examined an approach toward programming a terrestrial-based drone so that it follows a taped path. By doing so, if an alternative path is required, programmers would not be needed to re-program any part of the automated routine. Changing the path of the drone simply requires removing the tape and placing a different path - ideally simplifying the process and quickly allowing practitioners to implement a new automated routine. Python programming scripts were used with a DJI Robomaster EP Core drone, and a terrain navigation assessment was conducted. The study examined the pass/fail rates for a series of trial run over different terrains. The analysis of this data along with video recording for each trial run allowed the researchers to conclude that the accuracy of the tape follow technique was predictable on each of the terrain surfaces. The accuracy and predictability inform a non-coding construction practitioner of the optimal placement of the taped path. This paper further presents limitations and suggestions for some possible extended research options for this study.

  • PDF

3D Virtual Building Technic using Pattern (패턴을 이용한 3D 가상 건축 기술)

  • Han, Jung-Soo;Kim, Gui-Jung
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.8
    • /
    • pp.66-72
    • /
    • 2010
  • This paper is focus on 3D virtual building design technic that construction materials are showed by components and these components are part of patterns, and building design using pattern is possible. To use this technique in process of construction, design, analysis, change, assembly, etc, we will develop flexible building design system that it supports efficient building change and low cost by construction design simulation. Specially also the designer and the user use a pattern and easily will be able to change the building and according to change pattern information of the materials, design of the buildings which are changed creates automatic. Also we will implement knowledge retrieval engine which is necessary to personal skill or visualization.