• 제목/요약/키워드: Six sigma

검색결과 495건 처리시간 0.021초

최적합 구름 베어링용 Urea계 그리이스의 특성평가 연구 (A Study on Characteristics of the Optimum Urea Type Grease for Rolling Bearings)

  • 김상근;박창남;한종대
    • 한국윤활학회:학술대회논문집
    • /
    • 한국윤활학회 2004년도 학술대회지
    • /
    • pp.123-129
    • /
    • 2004
  • Rolling bearings are assorted one of the most important machine elements. The various functions of bearings are greatly influenced by grease, and higher performance of rolling bearing greases is required to improve rolling bearing lubrication. The two conditions for optimum grease synthesis were selected by SSRED (Six Sigma Robust Engineering Design) program by using dropping points and OIT values respectively. And the optimized two urea/ether oil greases were synthesized to compare the performance. The typical physical properties of grease were investigated. And life test of these greases was conducted by rolling bearing grease life tester The characteristics of the greases before and after life test were investigated using FTIR, microscope, SEM, TG/DSC, OIT and TAN meter The optimized two greases showed longer life time than typical urea/ether oil grease. The optimized grease by means of OIT value showed higher performance such as long life time. low TAN value and high oil bleeding amount in comparison with the optimized grease using dropping point.

  • PDF

고온용 폴리머 윤활 베어링의 특성 연구 (Preparation and Characterization of Polymer Lubricating Bearings)

  • 한종대;김상근;김병관
    • Tribology and Lubricants
    • /
    • 제24권4호
    • /
    • pp.179-185
    • /
    • 2008
  • Microporous polymer lubricants(MPLs) are solid polymer materials containing micropores which are filled with liquid lubricants, and which are molded or formed to suit rolling bearings or other machine parts requiring lubrication. MPLs can be effectively applied to provide long-term, maintenance-free lubrication of a variety of machine elements without fully replacing of oils and greases. The application of rolling bearings packed fully with an MPL could reduce or eliminate the problems such as grease deterioration, leakage, under-lubrication caused by insertion of water or foreign matters under severe operation conditions. This paper discuss the application of MPLs for lubrication of rolling ball bearings. Two different MPLs were synthesized and the features of MPLs were tested. Characteristics of the bearings which are packed fully with synthesized MPLs were investigated using SEM, TG/DSC, extents of oil leakage, OIT, and life time test. After these preliminary tests twelve MPLs were synthesized and evaluated by measuring extents of oil leakage and OIT values. Then synthesis conditions for the optimum MPL were selected by SSRED(Six Sigma Robust Engineering Design) pro gram using extents of oil leakage and OIT values respectively. The optimum MPL by means of OIT value showed higher performance such as long life time and application at higher temperature of $140^{\circ}C$ than previous temperature of $100^{\circ}C$.

ISO 26262 제품개발 프로세스와 연계된 DFSS 로드-맵의 개발 (Development of a DFSS Road-map Associated with the ISO 26262 Product Development Process)

  • 홍성훈;권혁무;김동준;이민구
    • 산업공학
    • /
    • 제25권4호
    • /
    • pp.393-404
    • /
    • 2012
  • Increasing safety requirements of automobile are asking companies to find out solutions, based on the ISO 26262 which is a functional safety standard. ISO 26262 is an adaptation of the IEC 61508 for automotive electric/electronic systems. ISO 26262 provides a V model for ECU (Electronic Control Unit) development process to secure safety against vehicle. It well describes the requirements, necessary works and their resulting products for each development phase. However, it is difficult to apply to product development for achieving functional safety in the electric/electronic systems of an automobile because it lacks explanation on the working steps to follow and the methodologies and tools to be used in each step. In this paper, we introduce the outline of the ISO 26262 product development process and present a DFSS (Design For Six Sigma) road-map based on the ISO 26262 product development process as a way to operate efficiently the ISO 26262 product development process. The DFSS road-map consists of five phases: Define, Measure, Analyze, Design, and Verify. The detailed activities, tools, inputs, and work products are given for each phase.

A Delphi Approach to the Development of an Integrated Performance Measurement and Management Model for a Car Assembler

  • Shawyun, Teay
    • Industrial Engineering and Management Systems
    • /
    • 제7권3호
    • /
    • pp.214-227
    • /
    • 2008
  • Today's dynamic competitiveness requires an organization to improve its performance measurement and management. Quality Management Systems (QMS) abound, the main ones being: ISO series, Malcolm Baldridge National Quality Award (MBNQA), European Forum for Quality Management (EFQM), Six Sigma Business Scorecard and the Balanced Scorecard. Based on the literature, the IPMMM (Integrated Performance Measurement and Management Model) identified 7 key synthesized factors: leadership, strategy management and policy, customer and market, learning and growth, partnership and resources, internal processes and business results that are employed to investigate the key performance indicators of a car assembler using the Delphi methodology. In the 2 rounds of Delphi panels consisting of 20 senior management personnel, the $1^{st}$ round of 198 indicators in the IPMMM yielded 90 indicators. The $2^{nd}$ round yielded 43 performance indicators with 18 rated as critical based on the % assigned in the $1^{st}$ and $2^{nd}$ priority rating of "very important factor" and "key performance indicator" that must be ranked high on both of the priorities. The very critical indicators appeared to be: defect percentage and first time capability (tie in $1^{st}$ place) and revenue, goal setting, customer satisfaction index, on-time delivery, brand image, return on investment, Claim Occurrence Ratio, and debt being ranked from $3^{rd}$ to $10^{th}$. It can be surmised that an organization can identify and develop an appropriate set of performance indicators through the Delphi methodology and implement and manage them based on the Balanced Scorecard.

최적합 구름 베어링용 Urea계 그리이스의 특성평가 연구 (A Study on Characteristics of the Optimum Urea Ope Grease for Rolling Bearings)

  • 한종대;김상근;박창남
    • Tribology and Lubricants
    • /
    • 제21권1호
    • /
    • pp.21-26
    • /
    • 2005
  • Rolling bearings are assorted one of the most important machine elements. The various functions of bearings are greatly influenced by grease, and higher performance of rolling bearing greases is required to improve rolling bearing lubrication. The two conditions for optimum grease synthesis were selected by SSRED (Six Sigma Robust Engineering Design) program by using dropping points and OIT values respectively. And the optimized two urea/ether oil greases were synthesized to compare the performance. The typical physical properties of grease were investigated. And life test of these greases was conducted by rolling bearing grease life tester. The characteristics of the greases before and after life test were investigated using FTIR, microscope, SEM, TG/DSC, OIT and TAN meter. The optimized two greases showed longer life time than typical urea/ether oil grease. The optimized grease by means of OIT value showed higher performance such as long life time, low TAN value and high oil bleeding amount in comparison with the optimized grease using dropping point.

통계적 기법을 활용한 플랜지형 휠베어링의 열간단조 공정 최적화 (Optimization of Hot Forging Process of Flange Type Wheel Bearings by Statistical Technique)

  • 이재성;문호근;송복한;허보영
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2006년도 춘계학술대회 논문집
    • /
    • pp.434-437
    • /
    • 2006
  • Due to the shape of spindle with small diameter and heavy section, rapid cooling is difficult. It is difficult to fabricate the tapered wheel bearings with fine microstructure. Thus, their mechanical characteristics, such as yield strength and fatigue resistance, decrease. Producing the tapered wheel bearings with good workability during orbital forming after hot forging, hot forging process with several process parameters was optimized by means of statistical technique of Six-Sigma scheme. As a result, the lower heating temperature is, the lower the hardness and yield strength of forgings are. Also, the faster conveyer velocity is, the lower the hardness and yield strength of forgings are. To avoid therefore occurrence of the surface rupture during orbital forming, the heating temperature should be controlled as low as possible and the conveyer velocity should be controlled as fast as possible.

  • PDF

대용량 자료에서 핵심적인 소수의 변수들의 선별과 로지스틱 회귀 모형의 전개 (Screening Vital Few Variables and Development of Logistic Regression Model on a Large Data Set)

  • 임용빈;조재연;엄경아;이선아
    • 품질경영학회지
    • /
    • 제34권2호
    • /
    • pp.129-135
    • /
    • 2006
  • In the advance of computer technology, it is possible to keep all the related informations for monitoring equipments in control and huge amount of real time manufacturing data in a data base. Thus, the statistical analysis of large data sets with hundreds of thousands observations and hundred of independent variables whose some of values are missing at many observations is needed even though it is a formidable computational task. A tree structured approach to classification is capable of screening important independent variables and their interactions. In a Six Sigma project handling large amount of manufacturing data, one of the goals is to screen vital few variables among trivial many variables. In this paper we have reviewed and summarized CART, C4.5 and CHAID algorithms and proposed a simple method of screening vital few variables by selecting common variables screened by all the three algorithms. Also how to develop a logistics regression model on a large data set is discussed and illustrated through a large finance data set collected by a credit bureau for th purpose of predicting the bankruptcy of the company.

기업활용수준을 반영한 기술경영 연구방법론 교과도출을 위한 사전연구 (A Preliminary Study for Deriving Subjects of MOT Method Based on the Utilization Status in Korea Enterprises)

  • 이재하;나원식
    • 산업경영시스템학회지
    • /
    • 제35권2호
    • /
    • pp.212-219
    • /
    • 2012
  • This study focus on what methods of MOT are needed and utilized to solve a technical problem in the MOT leading company. We first classified the MOT methods by project life cycle and R&D job quality based on the several discussion with working group. In order to study, the survey was carried out by 168 experts working on MOT practices. Our main research findings are as follows. The level of utilized MOT methods was above average because MOT sector was beginning to represent an increasing share of total R&D business. But the satisfaction level on the MOT majors was below average. The more utilized MOT methods in practices were 'environment analysis and opportunity research,' 'business feasibility,' 'roadmapping,' 'portfolio,' 'technology tree,' 'scheduling,' 'risk management,' 'six sigma,' 'design of experiment,' 'quality control,' 'cost analysis' etc. And the subjects of product realization process were also needed to MOT practice such as 'design for reliability,' 'design for cost,' 'design for performance,' 'design for safety' deeply involved to product quality. Finally, the capability requested to University students were 'problem define and solving,' 'technology planning and strategy,' 'creative thinking.'

개방성 승모판막 절개술에 관한 연구 (Open Mitral Commissurotomy: A Report of 21 Cases)

  • 이영균
    • Journal of Chest Surgery
    • /
    • 제6권1호
    • /
    • pp.69-88
    • /
    • 1973
  • Twenty-one cases of open mitral commissurotomy were done between October 1963 and March 1973. 1] Preoperative embolism consists of 7 cerebral and 2 peripheral cases. Two operative cerebral embolism cases were noted. 2] There were two cases of restenosis, one associated valvular disease, three mitral insufficiency cases, and six cases of pulmonary hypertension. 3] Out of 21 cases, 13 cases of atrial fibrillation were found and two cases of atrial fibrillation were found postoperatively among 8 cases of preoperatively normal sinus rhythm. 4] During operation 10 cases of valvular calcification and 6 cases of left atrial thrombus were noted. 5] Complete blood count, electrolyte and acid base balance showed normal range of data. 6] Four helix reservoir whole blood total body perfusion and 17 cases of .hemodilution perfusion utilizing Rygg-Kyvsgaard bag oxygenator with sigma motor were performed. 7] EACA 125 mg/kg intravenous administration before cardiopulmonary bypass resulted in markedly diminished postoperative bleeding. 8] Post-perfusion urine amount was in satisfactory range. 9] There were 2 operative mortality due to coronary embolism and three cases of hospital death, 2 due to severe hepatic failure and one due to cerebral embolism. 10] Sixteen survival cases showed marked clinical improvements and almost all of them returned to their occupation satisfactorily after operation.

  • PDF

Corporate Reengineering for MRPII Implementation: Via a Hierarchical Modelling Approach

  • Chan, Jimmy S.F.;Chau K.Y.;Chan, Y.K.
    • International Journal of Quality Innovation
    • /
    • 제6권2호
    • /
    • pp.59-89
    • /
    • 2005
  • Manufacturing Resources Planning (MRPII) is one kind of manufacturing information system that can help manufacturing companies gain competitive advantages. It is estimated that more than one hundred MRPII systems are available in the market, many of them are mature enough to solve most operational issues in accordance with users' requirements. More often than not, many of these systems provide more functions than a company expects. Manufacturing companies worldwide have attempted to implement these MRPII systems, however, many companies experienced failure (Turbide, 1996) due to managerial rather than technical issues. The authors propose an approach utilising a roadmap to integrate BPR and the MRPII implementation in order to overcome this difficulty. A detail road map is developed to guide this implementation, which is designed using a hierarchical analysis technique known as Integrated DEFinition Method (IDEF). IDEF is a systematic manufacturing management and integration-modeling tool. The proposed approach is implemented and illustrated using a reference company and the results indicated that 66% reduction in errors for maintaining the bills of materials system; 99% reduction in time to carry out material requirement planning; and 70% reduction in time previously taken for non-productive discussions.