• Title/Summary/Keyword: Site-specific assessment

Search Result 210, Processing Time 0.029 seconds

Analysis and Evaluation of the Liquefaction on Layered Soil (층상지반에 대한 액상화 평가방법 및 분석)

  • 이상훈;유광훈
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2001.09a
    • /
    • pp.28-35
    • /
    • 2001
  • Liquefaction potential on the specific site of nuclear power plant is analyzed and reviewed. The layered site fur this study consists of silt and sand. Based on the limited available soil data, maximum shear strength at critical locations using Seed & Idriss method and computer program SHAKE is calculated, and liquefaction potential is reviewed. Seismic input motion used fur the assessment of liquefaction is the artificial time history compatible with the US NRC regulatory Guider .60. Assessment results of the liquefaction are validated by analyzing to the other typical soil fecundations which can show the effects of foundation depth and soil data.

  • PDF

Stochastic Estimation of Voltage Sags Based on Voltage Monitoring (전압 모니터링에 기반한 순간전압강하 확률적 추계 방법)

  • Son, Jeongdae;Park, Chang-Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.10
    • /
    • pp.1271-1277
    • /
    • 2018
  • This paper deals with a voltage sag assessment based on a voltage monitoring program. The voltage sag performance at a specific site can be evaluated by analyzing voltage monitoring data recorded for a long time period. Although an assessment based on voltage monitoring is an effective way to understand voltage sag performance at a measurement site, the statistical confidence of voltage sag frequency estimation heavily depends on the length of monitoring period and the number of recorded events. Short monitoring period and insufficient recorded data can not provide a reliable assessment result. This paper proposes a compensation assessment method by combining a computer simulation approach for in case that monitoring period and data are not enough for a valid assessment.

A Case Study on the Establishment of Assessment Standards for the Site Selection of Waste Treatment Facility (폐기물 처리시설 입지선정 평가기준 설정에 관한 사례연구)

  • Jung, Jong-Gwan;Jang, Won
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.2
    • /
    • pp.137-152
    • /
    • 1997
  • The siting process of municipal solid waste treatment facility consists of a structured set of policies that guide the implementation of waste management goals. The main problems of siting process are the social and political context or the community opposition. During the past, the traditional siting process has been obsolete in most pans of the country, so public officials and researchers have tried to experiment with new policies and procedures. A number of controversial issues offer insight into the factors that are related to the local residents opposition to new waste treatment facilities. The purpose of this case study focused on the establishment of criteria in the site selection of waste treatment facilities which can carry out resources recovery. incineration and landfill simultaneously. That is to say. the main points are to make concrete the quantification standards of assignment and take an objective allotment scale according to the assessment factors. The summarized results are as follows; 1. To promote the site selection based on the guideline such as rational. objective and due process of law, it is desirable to inform the local residents the methods of assessment in advance. 2. Totally 20 factors for the site selection are divided into 3 categories such as living environment characteristics, technological location characteristics and socio-economic factors. And the supposed magnitude of weight in all items are equally applied. 3. In regard to 20 assessment factors, the allotment of point is distributed by the specific location characteristics. Namely to make the assessment easily, each factors are set the scale from 1 to 5 points en masse along the data which are acquired in the region.

  • PDF

Determination of Target Clean-up Level and Risk-Based Remediation Strategy (위해성에 근거한 정화목표 산정 및 복원전략 수립)

  • Ryu, Hye-Rim;Han, Joon-Kyoung;Nam, Kyoung-Phile
    • Journal of Soil and Groundwater Environment
    • /
    • v.12 no.1
    • /
    • pp.73-86
    • /
    • 2007
  • Risk-based remediation strategy (RBRS) is a consistent decision-making process for the assessment and response to chemical release based on protecting human health and the environment. The decision-making process described integrates exposure and risk assessment practices with site assessment activities and remedial action selection to ensure that the chosen actions are protective of human health and the environment. The general sequences of events in Tier 1 is as follows: initial site assessment, development of conceptual site model with all exposure pathways, data collection on pollutants and receptors, and identification of risk-based screening level (RBSL). If site conditions do not meet RBSL, it needs further site-specific tier evaluation, Tier 2. In most cases, only limited number of exposure pathways, exposure scenarios, and chemicals of concern are considered the Tier 2 evaluation since many are eliminated from consideration during the Tier 1 evaluation. In spite of uncertainties due to the conservatism applied to risk calculations, limitation in site-specific data collections, and variables affecting the selection of target risk levels and exposure factors, RBRS provides us time- and cost-effectiveness of the remedial action. To ensure reliance of the results, the development team should consider land and resource use, cumulative risks, and additive effects. In addition, it is necessary to develop appropriate site assessment guideline and reliable toxicity assessment method, and to study on site-specific parameters and exposure parameters in Korea.

A Toolbox Approach for the Environmental Site Assessment of a Chemical Plant in a Coastal Area (연안지역 화학공장부지의 부지환경평가를 위한 복합조사기법의 적응)

  • Choi, Seung-Jin;Woo, Nam-Chil
    • Economic and Environmental Geology
    • /
    • v.40 no.4
    • /
    • pp.419-443
    • /
    • 2007
  • Recently, the branch-out of foreign companies into domestic markets through M&A and the opened followed by the Free Trade Agreement(FTA) with America have made the environmental site assessments of specific site more necessary. In this study, through case study of conducting actual environmental site assessment by use of a toolbox approach at a large scale of chemical plant with various contaminants located in a coastal area, the problems of guideline of domestic environmental assessment of soil were complemented. And an efficient and economical assessment was achieved. All six steps such as basic investigation, environmental site history survey, sampling and analysis, installation of monitoring wells and hydrogeological survey, and data interpretation were conducted in this study. All results of document survey, geological lineament analysis, field geology survey of surrounding area, geophysical prospecting of the site, hydraulic conductivity, measurement of groundwater flow rate and direction, sampling and analysis at each step were associated and estimated as an integrated tool box approach. As a consequence of this study, toolbox approaches were very useful techniques for contamination level and site characterization of subsurface media. The given conditions to conduct a basic survey for domestic soil environment assessment of site by use of existing documents, as well as interviews with the owner/manager/user of all adjacent properties and thorough review of all practically reviewable records pertaining to the property and surrounding properties within "Guideline for Soil Environment Assessment" radii are very poor. As a result, the application of toolbox approach in the environment site assessment of site is not only more efficient and economical, but also could be very useful assessment to integrate the soil and groundwater contamination.

The effect of structural variability and local site conditions on building fragility functions

  • Sisi, Aida Azari;Erberik, Murat A.;Askan, Aysegul
    • Earthquakes and Structures
    • /
    • v.14 no.4
    • /
    • pp.285-295
    • /
    • 2018
  • In this study, the effect of local site conditions (site class and site amplifications) and structural variability are investigated on fragility functions of typical building structures. The study area is chosen as Eastern Turkey. The fragility functions are developed using site-specific uniform hazard spectrum (UHS). The site-specific UHS is obtained based on simulated ground motions. The implementation of ground motion simulation into seismic hazard assessment has the advantage of investigating detailed local site effects. The typical residential buildings in Erzincan are represented by equivalent single degree of freedom systems (ESDOFs). Predictive equations are accomplished for structural seismic demands of ESDOFs to derive fragility functions in a straightforward manner. To study the sensitivity of fragility curves to site class, two sites on soft and stiff soil are taken into account. Two alternative site amplification functions known as generic and theoretical site amplifications are examined for these two sites. The reinforced concrete frames located on soft soil display larger fragilities than those on stiff soil. Theoretical site amplification mostly leads to larger fragilities than generic site amplification more evidently for reinforced concrete buildings. Additionally, structural variability of ESDOFs is generally observed to increase the fragility especially for rigid structural models.

SITE-SPECIFIC ATMOSPHERIC DISPERSION CHARACTERISTICS OF KOREAN NUCLEAR POWER PLANT SITES

  • Han, M.H.;Kim, E.H.;Suh, K.S.;Hwang, W.T.;Choi, Y.G.
    • Journal of Radiation Protection and Research
    • /
    • v.26 no.3
    • /
    • pp.305-309
    • /
    • 2001
  • Site-specific atmospheric dispersion characteristics have been analyzed. The northwest and the southwest wind prevail on nuclear sites of Korea. The annual isobaric surface averaged for twenty years around Korean peninsula shows that west wind prevails. The prevailing west wind is profitable in the viewpoint of radiation protection because three of four nuclear sites are located in the east side. Large scale field tracer experiments over nuclear sites have been conducted for the purpose of analyzing the atmospheric dispersion characteristics and validating a real-time atmospheric dispersion and dose assessment system FADAS. To analyze the site-specific atmospheric dispersion characteristics is essential for making effective countermeasures against a nuclear emergency.

  • PDF

Site-Level Assessment of Other Effective Area-based Conservation Measures - Focusing on the Korea National Arboretum - (기타 효과적인 지역 기반 보전 수단(OECMs)의 개별 평가 - 국립수목원을 중심으로 -)

  • Shim, Yun-Jin;Sung, Jung-Won;Lee, Kyeong-Cheol;Kweon, Hyeong-Keun;An, Jong-Bin
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.26 no.2
    • /
    • pp.1-11
    • /
    • 2023
  • By delivering effective, in-situ conservation of biodiversity, OECMs can contribute to sustaining existing biodiversity values and improving biodiversity conservation outcomes. In this study, for the reporting of OECMs required by Kunming-Montreal Global Biodiversity Framework, the site-level assessment of the Korea National Arboretum and Buffer Zones were conducted using the assessment tool of IUCN. The site-level assessment was carried out in three steps(step 1: screening, step 2 : consent for full assessment, step 3 : the full assessment). It was found that the criteria were satisfied except for the consent for full assessment, sustainability of governance and management arrangements, and the equity of governance and management. Although the governing authority, rights-holders or any other stakeholders could be identified, the step of acknowledging and agreeing to the full OECM assessment was not possible because the governance was not established. As a result of the assessment of equitable governance and management in the aspect of recognition, procedure, and distribution based on criterion(the equity of governance and management), it is judged that more specific measures are needed in the aspect of recognition. And in the aspect of procedure, there is no legal basis for participation in governance and collection of opinions, so it is judged that there is a limit to listening and reflecting the opinions of stakeholders. In the aspect of distribution, it is necessary to further confirm whether it provides direct benefits to rights-holders such as landowners in the region. And it is necessary to prepare specific criteria to assess the important biodiversity values. Therefore, in order to promote OECM reporting in the future, it is necessary to conduct detailed research on various types of governance establishment and operation plans that can establish the basis for recognizing and agreeing to OECM assessment, specific criteria and reasonable measures to judge equity, and important biodiversity value.

Study on the Establishing a Guideline for Selecting Major Environmental Factors by the Project Type Criteria in EIA (환경영향평가 대상사업별 중점평가항목의 도출에 관한 연구)

  • Sung, Hyun-Chan;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.3 no.1
    • /
    • pp.9-30
    • /
    • 1994
  • Environmental Impact Assessment System, ever since its enactment in Korea fourteen years ago, has been steadily improved by introduction and implementation of new concepts and methodologies which include Environmental Impact Statement(EIS) preparation technique, selection of environmental factors, and the like. However, current guideline requires that every EIS, regardless of the specifics of the project type or characteristics of the site, must evaluate and study for all twenty-two environmental factors as set forth in the regulation. The situation causes many undesirable problems like; lack of site specific evaluation in most EISs, over-sized EIS drafts, consuming too much time and costs for EIS preparation, and so on. The objectives of this study are: - To establish a set of criteria to classify the types of the projects in terms of features of the project content and the characteristics of the site area. - To establish a guideline for selecting major environmental factors of the project type criteria, and - To provide basic materials for the preparation of complets draft EIS of the Amendment of Environmental Impact Assessment Act.

  • PDF

Key Methodologies to Effective Site-specific Accessment in Contaminated Soils : A Review (오염토양의 효과적 현장조사에 대한 주요 방법론의 검토)

  • Chung, Doug-Young
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.32 no.4
    • /
    • pp.383-397
    • /
    • 1999
  • For sites to be investigated, the results of such an investigation can be used in determining foals for cleanup, quantifying risks, determining acceptable and unacceptable risk, and developing cleanup plans t hat do not cause unnecessary delays in the redevelopment and reuse of the property. To do this, it is essential that an appropriately detailed study of the site be performed to identify the cause, nature, and extent of contamination and the possible threats to the environment or to any people living or working nearby through the analysis of samples of soil and soil gas, groundwater, surface water, and sediment. The migration pathways of contaminants also are examined during this phase. Key aspects of cost-effective site assessment to help standardize and accelerate the evaluation of contaminated soils at sites are to provide a simple step-by-step methodology for environmental science/engineering professionals to calculate risk-based, site-specific soil levels for contaminants in soil. Its use may significantly reduce the time it takes to complete soil investigations and cleanup actions at some sites, as well as improve the consistency of these actions across the nation. To achieve the effective site assessment, it requires the criteria for choosing the type of standard and setting the magnitude of the standard come from different sources, depending on many factors including the nature of the contamination. A general scheme for site-specific assessment consists of sequential Phase I, II, and III, which is defined by workplan and soil screening levels. Phase I are conducted to identify and confirm a site's recognized environmental conditions resulting from past actions. If a Phase 1 identifies potential hazardous substances, a Phase II is usually conducted to confirm the absence, or presence and extent, of contamination. Phase II involve the collection and analysis of samples. And Phase III is to remediate the contaminated soils determined by Phase I and Phase II. However, important factors in determining whether a assessment standard is site-specific and suitable are (1) the spatial extent of the sampling and the size of the sample area; (2) the number of samples taken: (3) the strategy of taking samples: and (4) the way the data are analyzed. Although selected methods are recommended, application of quantitative methods is directed by users having prior training or experience for the dynamic site investigation process.

  • PDF