• Title/Summary/Keyword: Site plan

Search Result 1,493, Processing Time 0.033 seconds

Analysis of Harbor Tranquility due to Port Expansion

  • Moon, SeungHyo;Lee, JoongWoo;Kwon, SeongMin;Song, HyunWoo
    • Journal of Navigation and Port Research
    • /
    • v.43 no.5
    • /
    • pp.320-327
    • /
    • 2019
  • This study examined the port expansion plan for the fishery port at the east coast of Korea, in accordance with permission conditions for coastal ports such as a limit on the cargo volume and passenger demand for the coastal tourism belt formation. The site was chosen as a municipal coastal port attracting the new ocean industry and building waterfront zone as a hub of new marine tourism. Two different numerical models (Swan and Bouss 2D) were used. Before applying to the target sea area, some numerical tests were conducted for the variation according to Bouss-2D's strong/weak and nonlinear technique compared to the irregular diffraction of semi-infinite breakwater with a theoretical solution. As a result, there was a difference in strong nonlinearity with breaking waves and it was necessary to experiment with a strong nonlinear analysis technique for the actual site. Two numerical models were applied to the fishery port site and the tranquility of some alternatives were analyzed. The numerical results show the most suitable plan was ALT-1, with satisfied harbor tranquility and reasonable economic sense. The extension of the east breakwater and enlarged turning basin of the F-Land plan have brought generally more stable harbor tranquility than the ALT-1. The result can be used as a reference for the port expansion plan in the future.

A Case Study of Disaster Accidents at Construction Site Based on PDCA Theory

  • Shin, Dong-Won;Kong, Ha-Sung
    • International journal of advanced smart convergence
    • /
    • v.10 no.3
    • /
    • pp.245-256
    • /
    • 2021
  • This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.

Introduction to Daegwallyeong Wind Turbine Test Site and Field Test Study (대관령 풍력실증단지 및 실증연구 소개)

  • Yoo Neung-Soo;Nam Yun-Soo;Lee Jung-Wan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.5-8
    • /
    • 2005
  • This paper aims to introduce the Daegwallyeong wind turbine test site which is the first official wind turbine test site in Korea. The current status of test site, the characteristics, the projects performed and future plan of this test site are described. The results of wind condition measurements and monitoring system established by the Kangwon National University are presented. The importance of field test is also commented.

  • PDF

Proposed optimal fishing-ground plan to increase productivity in the Ki-jang coastal region of Busan, Korea (양식어장 생산성 향상을 위한 적정배치방안-부산 기장연안을 중심으로-)

  • Yoon, Han-Sam;Kim, Heon-Tae;Ryu, Cheong-Ro;Kim, Young-Po
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.17 no.3
    • /
    • pp.361-372
    • /
    • 2005
  • The purpose of this paper was to examine the status of unlawful actions in the fishing grounds located in the Ki-jang coastal region of Busan, Korea, and to develop an optimal fishing-ground plan that will increase the productivity of fisheries resources. We examined the impacts of important factors influencing the basic environment of the fishing grounds at the study site, as including the physical environmental conditions of water temperature and qualies. In addition, we administered a survey that focused on the necessity of enhanced maintenance of the fishing grounds at this site. As a result, we identified some required management action for the fishing grounds and proposed an optimal fishing-ground plan to increase productivity in the Ki-jang coastal region of Busan.

A Study on Improvement Plan to Enhancing the Effectiveness of Technical Guidance Project for Safety Control of Small Construction Site (소규모건설현장 안전관리를 위한 기술지도 사업의 실효성 제고를 위한 개선방안 연구)

  • Lim, HyoungChul;Beak, NakKyu;Kim, DaeYoung;Jeong, SeongChoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.79-85
    • /
    • 2018
  • The government and of the Safety and Health Corporation have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce accidents on the construction site. However, the number of disasters on the construction site is increasing every year, Which accounts for more than 80% of the total number of casualties. It is necessary to investigate the implementation status of safety and health management in the field of small-size construction site, and to provide the appropriate technical guidance plan to the relevant work places. Also, it is necessary to reduce the disaster at the small-size construction site, The purpose of this study is Improvement Plan to Enhancing the Effectiveness of Technical Guidance Project for Safety Control of Small Construction Site.

An Analysis on the DCGL setting Method of the United States for Demonstrating Nuclear Power Plants Site Release Criteria (국내 원전 부지 해제 기준 준수 입증을 위한 미국의 유도농도기준(DCGL) 설정 방법에 대한 분석)

  • Jeon, Yeo Ryeong;Park, Sang June;Ahn, Seokyoung;Lee, Jong Seh;Kim, Yongmin
    • Journal of the Korean Society of Radiology
    • /
    • v.11 no.1
    • /
    • pp.1-8
    • /
    • 2017
  • The U.S. NRC establishes a radiological criteria with regard to restricted or unrestricted use of nuclear plant site after decommissioning in NUREG-1757. According to this, a nuclear plant site can be released in a restricted way or unrestricted way only if a licensee demonstrates that the dose criteria is fulfilled after the site decontamination and remediation. In order to prove compliance with the radiological criteria of site release, LTP(License Termination Plan) must include the site release criteria, site characterization, final survey plan with major radionuclides and DCGL(Derived Concentration Guideline Levels), etc. Based on the decommissioning case of Rancho Seco nuclear power plant in the United States, this paper analyzed a method of setting the DCGL that can be applied to Kori NPP Unit 1 which will be permanently disabled in 2017.

A Case Study on the Quality Management of Construction Site through PDCA Cycle (PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구)

  • Baik, In-Whee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

Environmental Impact and Allowable Density Using the Rural Residential Density Matrix (주거밀도모형을 이용한 환경영향분석과 수용능력 산출)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.3
    • /
    • pp.151-160
    • /
    • 2003
  • Analysis of carrying capacity and site suitability by the systematic application of environmental information an provide a basis for implementing environmentally sensitive and sustainable resource development policies. Based on the availability of public services and environmental and site-specific constraints, a Rural Residential Density Matrix was applied in Santa Cruz County, California, USA to assess the development potential of rural land parcels since 1980. In one case, the Matrix was applied to calculate the allowable development density on a site in Lompico planned for use as a Buddhist retreat center. These calculations revealed higher environmental sensitivity and lower carrying capacity than projected in the proposed plan. Under the constraints of the county's minimum acreage policies and insufficient developable land, the developer cancelled the proposed plan. This example suggests that application of the Matrix at the concept development stage would increase the effectiveness of the prior environmental review and environmental impact assessment (EIA) system in Korea.

Analysis and Improvement Plan of Government Support Project for Reducing Disaster in Small Construction Site. (소규모 건설현장의 재해저감을 위한 정부지원 사업 분석 및 개선요구사항 도출)

  • Baek, Nak-Ku;Lee, Mi-Hyeon;Lim, Houng-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.116-117
    • /
    • 2018
  • The government and the Korea Occupational safety & Health Agency have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce safety accidents at the construction site. However, the number of disasters at construction sites is increasing every year. So analyze the results of the supervision and inspection of the Ministry of Employment and Labor, the projects related to the small-scale construction work of the Safety and Health Corporation, and the technical guidance project of the disaster prevention technology guidance organization. It is also necessary to establish an improvement plan for the disaster reduction of the small-scale construction work site for this project.

  • PDF

Range Safety Activities for the Launch of an Earth Observation Satellite

  • Im, Jeong-Heum
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.194.2-194.2
    • /
    • 2012
  • Korea Aerospace Research Institute has developed an earth observation satellite and it was launched into its orbit in 2012 by using a foreign commercial launch vehicle. The launch site authority has imposed safety requirements to the spacecraft developer to ensure the safety of the personnel and to protect launch vehicle, spacecraft and facilities from accidents associated with the satellite operation at the launch site. This paper describes the range safety activities implemented for the satellite and supporting equipments during the whole phase of their design, manufacturing/test and operation at the launch site. To ensure the integrated requirements for safety management and design, system safety program plan has been developed. And based upon the plan, spacecraft developer conducted hazard analysis to identify and establish safety requirements to reflect in designs, procedures, operations. The result of the hazard analysis has been complied into safety data packages and it was reviewed by launch site review board at the safety reviews and finally it was approved to launch.

  • PDF