• Title/Summary/Keyword: Site Risk

Search Result 1,338, Processing Time 0.032 seconds

Status of Agrometeorology Monitoring Network for Weather Risk Management: Focused on RDA of Korea (위험기상 대응 농업기상관측 네트워크의 현황: 농촌진흥청을 중심으로)

  • Shim, Kyo Moon;Kim, Yong Seok;Jeong, Myung Pyo;Choi, In Tae;So, Kyu Ho
    • Journal of Climate Change Research
    • /
    • v.6 no.1
    • /
    • pp.55-60
    • /
    • 2015
  • Agro-Meteorological Information Service (AMIS) network has been established since 2001 by Rural Development Administration (RDA) in Korea, and has provided access to current and historical weather data with useful information for agricultural activities. AMIS network includes 158 automated weather stations located mostly in farm region, with planning to increase by 200 stations until 2017. Agrometeorological information is disseminated via the web site (http://weather.rda.go.kr) to growers, researchers, and extension service officials. Our services will give enhanced information from observation data (temperature, precipitation, etc.) to application information, such as drought index, agro-climatic map, and early warning service. AMIS network of RDA will help the implementation of an early warning service for weather risk management.

A Study on Driving Algorithm and Communication Characteristics for Remote Control of Mini Excavator (소형 굴삭기의 원격제어를 위한 주행 알고리즘 및 통신특성에 관한 연구)

  • Jeong, Jin Beom;Kim, Kyung Soo
    • Journal of Drive and Control
    • /
    • v.15 no.4
    • /
    • pp.81-90
    • /
    • 2018
  • Indoor construction site such as building demolition sites, tunnel, vinyl house, and cattle shed are subject to various risk factors such as falling stones, soot and bad odors. However, most of the mini excavators have no cabin that can protect the driver from such risk factors. Therefore, researches on remote control technology of construction equipment are actively conducted as a method for protecting the driver from the risk factors occurring in the working environment. For effective remote control, it is necessary to be able to control the travelling and work using a portable small transmitter. However, due to the limitation of the size of the transmitter, complex operation control is required to control two or more actuators with a single joystick. Also, it is essential to check how remote control characteristics change in various environments such as distance, signal strength, obstacle. Therefore, in this study, an algorithm that can control two actuators simultaneously with a single joystick signal was developed, and a communication method suitable for indoor and outdoor mini construction equipment by analyzing experimentally how the remote control characteristics vary according to various work environments and telecommunication methods proposed.

Methodology of seismic-response-correlation-coefficient calculation for seismic probabilistic safety assessment of multi-unit nuclear power plants

  • Eem, Seunghyun;Choi, In-Kil;Yang, Beomjoo;Kwag, Shinyoung
    • Nuclear Engineering and Technology
    • /
    • v.53 no.3
    • /
    • pp.967-973
    • /
    • 2021
  • In 2011, an earthquake and subsequent tsunami hit the Fukushima Daiichi Nuclear Power Plant, causing simultaneous accidents in several reactors. This accident shows us that if there are several reactors on site, the seismic risk to multiple units is important to consider, in addition to that to single units in isolation. When a seismic event occurs, a seismic-failure correlation exists between the nuclear power plant's structures, systems, and components (SSCs) due to their seismic-response and seismic-capacity correlations. Therefore, it is necessary to evaluate the multi-unit seismic risk by considering the SSCs' seismic-failure-correlation effect. In this study, a methodology is proposed to obtain the seismic-response-correlation coefficient between SSCs to calculate the risk to multi-unit facilities. This coefficient is calculated from a probabilistic multi-unit seismic-response analysis. The seismic-response and seismic-failure-correlation coefficients of the emergency diesel generators installed within the units are successfully derived via the proposed method. In addition, the distribution of the seismic-response-correlation coefficient was observed as a function of the distance between SSCs of various dynamic characteristics. It is demonstrated that the proposed methodology can reasonably derive the seismic-response-correlation coefficient between SSCs, which is the input data for multi-unit seismic probabilistic safety assessment.

Evaluating the Application of Portable Safety Equipment in Nuclear Power Plants using Multi-unit PSA (다수기 PSA 기반 원자력 발전소 이동형 안전 설비 활용성 평가)

  • Jae Young Yoon;Ho-Gon Lim;Jong Woo Park
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.3
    • /
    • pp.110-120
    • /
    • 2023
  • Following the Fukushima accident, portable equipment employed as accident mitigating systems have been installed and operated to reduce core damage and large early release frequencies. In addition, the establishment of an accident management strategy has gained importance. This study investigated the current status of portable equipment including the international portable equipment FLEX (diverse and flexible coping strategies), and domestic portable equipment multi-barrier accident coping strategy (MACST). Research on optimal utilization of MACST remains insufficient. As a preliminary study for establishing an optimal strategy, sensitivity studies were conducted to facilitate the priority of use on portable equipment, number of portable equipment, and dependency of operator actions based on a multi-unit probabilistic safety assessment model. The results revealed the conditions that reduced the multi-unit and site conditional core damage probabilities, indicating the optimal strategy of MACST. The results of this study can be used as a reference for establishing an optimal strategy that utilizes domestic safety equipment in the future.

Incidence and Risk Factors for Surgical Glove Perforation (수술용 장갑의 천공률에 대한 연구)

  • Yoo, Seon Ju;Lim, Young Shin;Kim, Myung Suk
    • Journal of Korean Clinical Nursing Research
    • /
    • v.16 no.3
    • /
    • pp.63-71
    • /
    • 2010
  • Purpose: This study was conducted to evaluate the incidence and risk factors for surgical glove perforation during operation. Methods: During the month of december 2008, a total of 1,400 pairs of surgical gloves used in major operations was collected in a tertiary hospital. All gloves were examined immediately after operation using the standardized water-leak method to detect any perforation. Incidence of the glove perforation was counted according to the type of operation, operation time, the number of involved personnel, perforation sites, and the manufacturing companies. Results: Out of 2,800 gloves examined, 312 perforations were detected comprising 11.1% of samples. In terms of the type of operation, the perforation incidence varied from 5% to 20%, and the perforation rates in CS (20%) and NS (18%) (p<.001) were significantly higher than those in other departments. The 1st assistant or scrub nurse got glove perforation more frequently than the 2nd assistant or operator (p<.001). Longer operation time was associated with higher incidence of perforation evidently (p<.001). In terms of the sites, the thumb and index finger were more frequently perforated than other sites (4.1% and 3.4% respectively) without any differences between left and right side. Conclusion: Risk factors for glove perforation including the department of operation, operation time, participating personnel, and location of perforation should be taken into account to improve surgical safety.

Flood Risk Management for Weirs: Integrated Application of Artificial Intelligence and RESCON Modelling for Maintaining Reservoir Safety

  • Idrees, Muhammad Bilal;Kim, Dongwook;Lee, Jin-Young;Kim, Tae-Woong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.167-167
    • /
    • 2020
  • Annual sediment deposition in reservoirs behind weirs poses flood risk, while its accurate prediction remains a challenge. Sediment management by hydraulic flushing is an effective method to maintain reservoir storage. In this study, an integrated approach to predict sediment inflow and sediment flushing simulation in reservoirs is presented. The annual sediment inflow prediction was carried out with Artificial Neural Networks (ANN) modelling. RESCON model was applied for quantification of sediment flushing feasibility criteria. The integrated approach was applied on Sangju Weir and also on estuary of Nakdong River (NREB). The mean annual sediment inflow predicted at Sangju Weir and NREB was 400,000 ㎥ and 170,000 ㎥, respectively. The sediment characteristics gathered were used to setup RESCON model and sediment balance ratio (SBR) and long term capacity ratio (LTCR) were used as flushing efficiency indicators. For Sangju Weir, the flushing discharge, Qf = 140 ㎥/s with a drawdown of 5 m, and flushing duration, Tf = 10 days was necessary for efficient flushing. At NREB site, the parameters for efficient flushing were Qf = 80 ㎥/s, Tf = 5 days, N = 1, Elf = 2.24 m. The hydraulic flushing was concluded feasible for sediment management at both Sangju Weir and NREB.

  • PDF

Establishment of a Safety Inspection System for Public Institutions Ordered Construction Projects (건설공사 발주 공공기관의 안전점검 체계구축에 관한 연구)

  • Eung Ho Park;Sudong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.3
    • /
    • pp.55-62
    • /
    • 2023
  • Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.

Key Methodologies to Effective Site-specific Accessment in Contaminated Soils : A Review (오염토양의 효과적 현장조사에 대한 주요 방법론의 검토)

  • Chung, Doug-Young
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.32 no.4
    • /
    • pp.383-397
    • /
    • 1999
  • For sites to be investigated, the results of such an investigation can be used in determining foals for cleanup, quantifying risks, determining acceptable and unacceptable risk, and developing cleanup plans t hat do not cause unnecessary delays in the redevelopment and reuse of the property. To do this, it is essential that an appropriately detailed study of the site be performed to identify the cause, nature, and extent of contamination and the possible threats to the environment or to any people living or working nearby through the analysis of samples of soil and soil gas, groundwater, surface water, and sediment. The migration pathways of contaminants also are examined during this phase. Key aspects of cost-effective site assessment to help standardize and accelerate the evaluation of contaminated soils at sites are to provide a simple step-by-step methodology for environmental science/engineering professionals to calculate risk-based, site-specific soil levels for contaminants in soil. Its use may significantly reduce the time it takes to complete soil investigations and cleanup actions at some sites, as well as improve the consistency of these actions across the nation. To achieve the effective site assessment, it requires the criteria for choosing the type of standard and setting the magnitude of the standard come from different sources, depending on many factors including the nature of the contamination. A general scheme for site-specific assessment consists of sequential Phase I, II, and III, which is defined by workplan and soil screening levels. Phase I are conducted to identify and confirm a site's recognized environmental conditions resulting from past actions. If a Phase 1 identifies potential hazardous substances, a Phase II is usually conducted to confirm the absence, or presence and extent, of contamination. Phase II involve the collection and analysis of samples. And Phase III is to remediate the contaminated soils determined by Phase I and Phase II. However, important factors in determining whether a assessment standard is site-specific and suitable are (1) the spatial extent of the sampling and the size of the sample area; (2) the number of samples taken: (3) the strategy of taking samples: and (4) the way the data are analyzed. Although selected methods are recommended, application of quantitative methods is directed by users having prior training or experience for the dynamic site investigation process.

  • PDF

Free Flap Reconstruction of Head and Neck Defects after Oncologic Ablation: One Surgeon's Outcomes in 42 Cases

  • Lim, Yun Sub;Kim, Jun Sik;Kim, Nam Gyun;Lee, Kyung Suk;Choi, Jae Hoon;Park, Sang Woo
    • Archives of Plastic Surgery
    • /
    • v.41 no.2
    • /
    • pp.148-152
    • /
    • 2014
  • Background Free flap surgery for head and neck defects has gained popularity as an advanced microvascular surgical technique. The aims of this study are first, to determine whether the known risk factors such as comorbidity, tobacco use, obesity, and radiation increase the complications of a free flap transfer, and second, to identify the incidence of complications in a radial forearm free flap and an anterolateral thigh perforator flap. Methods We reviewed the medical records of patients with head and neck cancer who underwent reconstruction with free flap between May 1994 and May 2012 at our department of plastic and reconstructive surgery. Results The patients included 36 men and 6 women, with a mean age of 59.38 years. The most common primary tumor site was the tongue (38%). The most commonly used free flap was the radial forearm free flap (57%), followed by the anterolateral thigh perforator free flap (22%). There was no occurrence of free flap failure. In this study, risk factors of the patients did not increase the occurrence of complications. In addition, no statistically significant differences in complications were observed between the radial forearm free flap and anterolateral thigh perforator free flap. Conclusions We could conclude that the risk factors of the patient did not increase the complications of a free flap transfer. Therefore, the risk factors of patients are no longer a negative factor for a free flap transfer.

A Study on the Risk Assessment by Comparing Workplace Environment Measurement with Exposure Assessment Program(ECETOC TRA) (작업환경측정과 노출평가 프로그램(ECETOC TRA) 비교에 따른 위해성 평가에 관한 연구)

  • Ko, Won-Kyoung;Yi, Young-Seop
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.3
    • /
    • pp.1-6
    • /
    • 2013
  • This study was conducted to compare the value of the working environment measurement with the expected exposure value drawn by using a program, thereby going to investigate whether it is available to the risk assessment of domestic workplace. We used the ECETOC TRA program which is one of the exposure predictive models. Four kinds of substances were measured in two workplace which was exposed to organic solvents and one kind of substance was measured in three workplace which was exposed to dusts and then an exposure assessment of chemical risk factors was conducted. The result value of the working environment measurement, solid substance exceeded standard in one site, and it was found that the other solid and liquid substances were within the standard. The value of the exposure assessment program showd the same result; it was higher than the value of the working environment measurement, suggesting that due to its nature, the exposure assessment program is run only on the worst situation. Therefore, it was found that when the exposure assesment program is used, variables should be substituted only after accurately assessing the workplace and it is a good idea to assess the risk beforehand with the exposure assessment program in the case of the workplace which employs no more than 5 people and where it is hard to assess the working environment.