• 제목/요약/키워드: Site Risk

검색결과 1,327건 처리시간 0.044초

법규적 측면에서 고찰한 고층 건축물 공사현장 화재안전 확보방안 (A Study on the Improvement of Fire Safety in high-rise Building Construction in Legal aspects)

  • 박찬석;정일균
    • 대한안전경영과학회지
    • /
    • 제17권1호
    • /
    • pp.21-32
    • /
    • 2015
  • High rising of the buildings offers a number of risk factors than ever before with regard to fire prevention. Especially in the construction site of high-rise buildings, people waste golden-time during the evacuation because temporary fire fighting facilities are not installed and transferred to a large fire because of fire suppression failure. In this study, the researcher derives the problems of fire protection in high-rise buildings construction sites and proposed the measures in such the legal aspects as fire building construction code and etc. There are the legal improvements such as orders of construction suspension in the problems of fire safety, appointing fire safety manager, temporary fire protection installation standards, enhancing penalty provisions regarding the use of fire, operating self fire brigade, confirming on-site after completing fire-protection facalities, establishment or strengthening special fire-protection investigations.

BIM을 활용한 안전사고 예방교육 내용매체의 효율성 평가 방안 (Measures to Evaluate the Efficiency for Safety Education Contents Using BIM)

  • 박태환;박영준;김태희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.40-41
    • /
    • 2014
  • Today, the potential safety risk is increased due to a construction industry is high-rised, mechanized, and complexed. Most workers injured in accident caused by lack of safety awareness. Therefore the safety education is focused in construction site, but it can not get workers' interest and has many problems to reduce construction accident. This study will investigate the effects of education used BIM intended for workers in construction site to verify the objective effectiveness in future.

  • PDF

불량 매립지에서의 지하수 오염특성과 환경오염 방지방안 (Characteristics of Groundwater Contamination in Uncontrolled Landfill and Pollution Control Measures)

  • 구자중;윤석표
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1993년도 지반.환경 매립에 관한 학술발표회 논문집
    • /
    • pp.28-44
    • /
    • 1993
  • Remediation actions in uncontrolled landfill site should be conducted after the investigation of contamination status and potential health risk or damage. Based on the above, proper control measures should be established and operated. Also continuous monitoring should be followed. In this study, the status of ground water contamination around Nanji Landfill Site was investigated. Monitoring wells were installed around the landfill and ground water was sampled once a month and analyzed. Water quality of each monitoring well was different depending on the horizontal and vertical distance from the landfill, and the seasonal leachate characteristics were not significantly changed because percolating water stayed long time in the deep waste layer. It was predicted that major multivalent cations were mainly precipitated as metal carbonate form, and chemical mass balances (CMBs) could be applied for the apportionment of leachate contamination to ground water quality of surrounding areas of Nanji Landfill. Parameters required to estimate pollutant flux to the receptor near landfill were listed and discussion to get these parameters was made. Finally, based on the above data, control measures of ground water contamination were suggested and discussed.

  • PDF

온라인 부분방전 감시 시스템 (On-Line System for Partial Monitoring Discharge)

  • 최용성;황종선;이경섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.2114-2115
    • /
    • 2008
  • We consider the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers is described.

  • PDF

Breast Reconstruction with Microvascular MS-TRAM and DIEP Flaps

  • Chang, David W.
    • Archives of Plastic Surgery
    • /
    • 제39권1호
    • /
    • pp.3-10
    • /
    • 2012
  • The free muscle-sparing transverse rectus abdominis myocutaneous (MS-TRAM) and deep inferior epigastric perforator (DIEP) flaps involve transferring skin and subcutaneous tissue from the lower abdominal area and have many features that make them well suited for breast reconstruction. The robust blood supply of the free flap reduces the risk of fat necrosis and also enables aggressive shaping of the flap for breast reconstruction to optimize the aesthetic outcome. In addition, the free MS-TRAM flap and DIEP flap require minimal donor-site sacrifice in most cases. With proper patient selection and safe surgical technique, the free MS-TRAM flap and DIEP flap can transfer the lower abdominal skin and subcutaneous tissue to provide an aesthetically pleasing breast reconstruction with minimal donor-site morbidity.

Radionuclide-Specific Exposure Pathway Analysis of Kori Unit 1 Containment Building Surface

  • Byon, Jihyang;Park, Sangjune;Ahn, Seokyoung
    • 방사성폐기물학회지
    • /
    • 제18권3호
    • /
    • pp.347-354
    • /
    • 2020
  • Site characterization for decommissioning Kori Unit 1 is ongoing in South Korea after 40 years of successful operation. Kori Unit 1's containment building is assumed to be mostly radioactively contaminated, and therefore radiation exposure management and detailed contamination investigation are required for decommissioning and dismantling it safely. In this study, site-specific Derived Concentration Guideline Levels (DCGLs) were derived using the residual radioactivity risk evaluation tool, RESRAD-BUILD code. A conceptual model of containment building for Kori Unit 1 was set up and limited occupational worker building inspection scenario was applied. Depending on the source location, the maximum contribution source and exposure pathway of each radionuclide were analyzed. The contribution of radionuclides to dose and exposure pathways, by source location, is expected to serve as basic data in the assessment criteria of survey areas and classification of impact areas during further decommissioning and decontamination of sites.

논 지역 시설재배지에서의 유기물 및 영양염류 유출 특성 (Runoff characteristics of organic matters and nutrients from greenhouse site in paddy field area)

  • 이근후;옥정훈;유시창;유찬
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2005년도 학술발표논문집
    • /
    • pp.604-609
    • /
    • 2005
  • Runoff characteristics of organic matters and nutrients from greenhouse site in paddy field area were investigated during the irrigation period in 2004. The greenhouse selected which situated near the Nam river, Jinju, Korea used the ground water as the irrigation purpose. And, the rotating system of paddy field to upland was adapted as a cropping system which is a typical practice in this area. Various items such as total phosphorus(T-P), total nitrogen(T-N), dissolved oxygen(DO), BOD, etc. were observed to figure out the seasonal and spatial variation in the study sites. it was found that the risk of water pollution due to the contamination of nutrients in canals in green house sites, and their neighbouring small sized streams are much higher than those in ordinary paddy field areas. Further surveys and investigations are required to find out the counter measures to reduce water pollution occurred in greenhouse sites.

  • PDF

구강암 환자에서 비골 유리 피판 재건술 후 공여부 부위의 괴사가 발생한 사례에 대한 증례 보고 (A Case of Donor Site Necrosis after Fibular Osteocutaneous Free Flap in Oral Cavity Cancer)

  • 권진호;김지훈;정현필;홍현준
    • 대한두경부종양학회지
    • /
    • 제28권1호
    • /
    • pp.50-53
    • /
    • 2012
  • Advanced cancer of the oral cavity has been treated with wide excision in conjunction with mandibulectomy and neck dissection. This has resulted in significant mandibulofacial defects with functional and cosmetic significance. Therefore, proper mandibular reconstruction is very important for physiologic and esthetic restoration. The risk factors of free flap reconstruction have been reported including obesity, age, smoking, previous irradiation, and systemic vascular disease. We recently experienced a case of donor site necrosis after fibular osteocutaneous free flap in oral cavity cancer.

현장 노무자를 대상으로 한 BIM 안전교육의 효과 검증 (The Verification of Safety Education Contents Using BIM from Construction Workers)

  • 박태환;박영준;김태희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.102-103
    • /
    • 2014
  • Today, the potential safety risk is increased due to a construction industry is high-rised, mechanized, and complexed. Most workers injured in accident caused by lack of safety awareness. Therefore the safety education is focused in construction site, but it can not get workers' interest and has many problems to reduce construction accident. This study investigated the effects of education used BIM intended for workers in construction site to verify the objective effectiveness in future.

  • PDF

Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.