• Title/Summary/Keyword: Site Risk

Search Result 1,338, Processing Time 0.028 seconds

Crash of a small construction site accident analysis and Risk Assessment Study -Focusing on project value of less than 20 billion small construction sites- (소규모 건설현장의 추락 재해분석 및 위험성 평가연구 -공사금액 20억 미만 소규모 건설현장을 중심으로-)

  • Shin, Sung Su;Bae, Young Bok;Ha, Haeng Bong;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.4
    • /
    • pp.41-51
    • /
    • 2014
  • Share of total accidents in construction accidents construction site accident 70% of small embroidery Reducing the rate of Construction of the entire construction accidents decreased overall is a very meaningful work. Disaster reduction continues to increase despite the efforts of a small construction site(Amount less than 2,000,000,000) for Disaster Reduction In order to identify more clearly the cause of the system and provide the urgently needed measures.

A Study on the Factors Affecting the Influence Ranges of Ammonia Leakage by Using KORA Program (KORA 프로그램을 활용한 암모니아 누출사고 영향범위 결정 기여요인 연구)

  • Lim, Hyeongjun;Kwak, Sollim;Jung, Jinhee;Ryu, Taekwon;Choi, Woosoo;Lee, Jieun;Lee, Jinseon;Lee, Yeonhee;Kim, Jungkon;Yoon, Junheon;Ryu, Jisung
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.3
    • /
    • pp.38-44
    • /
    • 2018
  • Ammonia is used primarily as a refrigerant in refrigeration facility and SCR of a plant, and is frequently involved in leakage accidents. This study was conducted by selecting ammonia, a material with a wide influence range when evaluated, as a material with higher vapor pressure and lighter than air. In this study, the influence ranges were computed using KORA(Korea Off-site Risk Assessment supporting tool) with four different environmental factors : ground roughness, sealing, operating temperature, pressure, and leakage hole size. As a result, the difference in the influence range of ground roughness is approximately 4.62 times, while the ammonia storage tank shows a difference in the reduction rate of 0.64 when sealed. The extent of impact increased with increasing leakage depending on storage temperature and pressure, and when storing higher than the saturation vapor pressure, the impact range showed an average growth rate of 3.45 % per 0.1 Mpa($45^{\circ}C$). The influence ranges based on the size of the leakage holes is shown to be proportional to the area of the leakage zone.

Patterns of recurrence after radiation therapy for high-risk neuroblastoma

  • Jo, Ji Hwan;Ahn, Seung Do;Koh, Minji;Kim, Jong Hoon;Lee, Sang-wook;Song, Si Yeol;Yoon, Sang Min;Kim, Young Seok;Kim, Su Ssan;Park, Jin-hong;Jung, Jinhong;Choi, Eun Kyung
    • Radiation Oncology Journal
    • /
    • v.37 no.3
    • /
    • pp.224-231
    • /
    • 2019
  • Purpose: To investigate the patterns of recurrence in patients with neuroblastoma treated with radiation therapy to the primary tumor site. Materials and Methods: We retrospectively analyzed patients with high-risk neuroblastoma managed with definitive treatment with radiation therapy to the primary tumor site between January 2003 and June 2017. These patients underwent three-dimensional conformal radiation therapy or intensity-modulated radiation therapy. A total of 14-36 Gy was delivered to the planning target volume, which included the primary tumor bed and the selected metastatic site. The disease stage was determined according to the International Neuroblastoma Staging System (INSS). We evaluated the recurrence pattern (i.e., local or systemic), progression-free survival, and overall survival. Results: A total of 40 patients with high-risk neuroblastoma were included in this study. The median patient age was 4 years (range, 1 to 11 years). Thirty patients (75%) had INSS stage 4 neuroblastoma. At the median follow-up of 58 months, there were 6 cases of local recurrence and 10 cases of systemic recurrence. Among the 6 local failure cases, 4 relapsed adjacent to the radiation field. The other 2 relapsed in the radiation field (i.e., para-aortic and retroperitoneal areas). The main sites of distant metastasis were the bone, lymph nodes, and bone marrow. The 5-year progression-free survival was 70.9% and the 5-year overall survival was 74.3%. Conclusion: Radiation therapy directed at the primary tumor site provides good local control. It seems to be adequate for disease control in patients with high-risk neuroblastoma after chemotherapy and surgical resection.

Risk Assessment for Hazardous Construction Work Recognized by Workers (건설위험직종 작업자의 위험체감도 평가)

  • Son, Ki-Sang;Lee, Shin-Jae
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.3 s.75
    • /
    • pp.67-72
    • /
    • 2006
  • This study is to investigate the related materials such as domestic law regulation, research paper, research report, and the other material, and to suggest suitable counter measures, to find out hazard degree for its works of workers and work place through direct survey, in order to determine risk score of each hazardous work which is designated by the Government, without consideration of labour's consciousness against risk level at a site. Therefore, a new questionnaire survey related to the decision of risk level are made and distributed to find out what risk level each worker recognizes. Also, the authors tried to approach reasonable conclusions after discussing reasonability of qualification standard and improving ideas of worker at hazardous work places with worker, faculty member, H&S manager, labour union. And the results show hazard degrees by each work kind of the above: 3.75 for working with machinery, 3.7 for steel structure, 3.5 for operation of tower crane, 3.51 for retaining wall, 3.85 for form work, 3.46 for scaffolding are obtained. This quantified risk can be applied to establishing a reasonable system to keep safe against hazardous works.

Wind Induced Risk Analysis of Highway Facilities (고속도로 시설물의 풍하중 위험도 해석)

  • Kim, Dong Hyawn;Lee, Il Keun;Jo, Byung Wan
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.6
    • /
    • pp.553-561
    • /
    • 2009
  • Risk analysis of highway sign supporting structures and sound barriers was done. Stochastic wind load was modeled by using extreme value distribution from site measurement and the variability of structural parameters was considered. Limit state functions were defined to assess structural stability by wind and risk of highway facilities was analyzed by combining wind hazard. According to the numerical analysis results, sound barrier post shows significantly higher risk than highway sign supporting structures. This is caused by the fact that the design codes of the structures are different. To distribute wind induced risk in highway structures, unification and improvement of design codes are required based on risk assessment.

Risk Assessment Method for Activities of Apartment Construction (공동주택 건축공사 단위작업의 위험성 평가 방법)

  • Park, Sungpyo;Choi, Jae-Wook;Lee, Chansik
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.135-145
    • /
    • 2020
  • Recently, the disaster rate of the construction industry has increased with high-rise, and complexity of the building, unlike the decrease in the disaster rate in other industries. Although risk assessment is performed to reduce the occurrence of disasters, it is difficult to estimate the risks accurately due to activity in which no disaster has occurred, and inconsistencies in the level of details of work. In this study, in order to evaluate the risk of the major activity for the apartment construction work, the activity was identified by referring to the risk assessment model of construction industry type by the KOSHA. The construction work types and activities were consistently organized in level of work into nine work types and 82 activities were through experts consultation. Analyzing the disaster types that occurred during work through KOSHA disaster cases, calculating the probability of disaster occurrence according to the type of disaster, and combining the probability of disaster with the severity of disaster to estimate the risk assessment method was presented. Using the daily report of the construction site of the apartment, the results of a case study confirmed the validity of the risk calculation method presented in this study.

Crime Mapping Based on Experts' and Residents' Assessments of Neighborhood Environment

  • Kim, Jaecheol
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.35 no.4
    • /
    • pp.213-220
    • /
    • 2017
  • This study examines the limitations of existing crime mapping that relies mainly on reported crime data, suggests a crime mapping method based on experts' and users' assessments of a neighborhood environment as an alternative approach, and conducts a case study on a real-world site by applying the suggested approach. According to the results of the case analysis, while the areas adjoining arterial roads with heavy pedestrian traffic were shown as high crime risk areas in the crime map based on actual reported crime data, the areas adjoining local roads with low pedestrian traffic were high-risk areas in the crime risk area map based on experts' and residents' evaluations. This study makes a contribution to the field in that it demonstrates the detailed application process of crime risk area mapping according experts' and residents' evaluations, compares the results with those of an existing crime map, and finally shows that the former can function as a complement to the latter.

A study on the Research & Analysis of the Health and safety Managing's Understanding for practical Application of Construction Industry Risk Assessment - Focus on worker - (건설업 위험성평가 실무적 적용을 위한 안전보건 인식도 조사 연구 -근로자를 중심으로-)

  • Choe, Su-Hwan;O, Tae-Geun;Lee, Yeon-Su;Lee, Jin-Seop
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.445-456
    • /
    • 2013
  • According to Department of labor guideline "2012-104 (2012.9.26.)" This study is to suggest the basic information and the improvement for the application of risk assessment on a construction site by group interview & survey of construction worker who is the practice of the subject and then numerical analysis about awareness and action plan of Safety and health. The result of group interview and survey of construction worker, most of construction worker feel the danger during the work. Then construction worker analysis results that risk assessment helps to change & raise awareness of safety and reduce an industrial disaster. Easy Safety management activity such as TBM & safety education active will be necessary for safe worksite and then I suggest the TBT(tool box talk) active which combines TBM & safety education.

  • PDF

Development of a Cost-benefit Model for the Management of Structural Risk on Oil Facilities in Mexico

  • Leon, David-De;Alfredo H-S. Ang
    • Computational Structural Engineering : An International Journal
    • /
    • v.2 no.1
    • /
    • pp.19-23
    • /
    • 2002
  • A reliability-based cost-benefit model for the risk management of oil platforms in the formulation of optimal decisions based on life-cycle consideration is proposed. The model is based on structural risk assessments and the integration of social issues and economics into the management decision process. Structural risks result from the platform's exposure to the random environmental loading associated with the offshore site where it is located. Several alternative designs of a typical platform are proposed and assessed from the cost-effectiveness viewpoint. This assessment is performed through the generation of cost/benefit relationships that are used, later on, to select the optimal design.

  • PDF

A Study on the Effectiveness of the Risk Assessment Regulations for Construction Works (건설공사 유해위험방지계획서제도의 효과분석에 관한 연구)

  • 안홍섭;노민래;이명구
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.4
    • /
    • pp.134-139
    • /
    • 2001
  • The Risk assessment regulation(RAR) is one of the essential articles of the Occupational safety and health law for the construction industry along with safety and health management expense and safety organization regulation. However, arguments regarding the working time of the safety assessment documents, the person in charge of documentation, weakness in legislative enforcement etc. are ongoing. Thus this study aims to analyze the effectiveness of RAR for the guidance of enhancing the effectiveness of RAR. The findings are; 1) the effectiveness of RAR is recognized, however the indirect effectiveness ie, enforcement of safety activities, previewing of drawings etc. are bigger than the direct effectiveness of accident prevention, 2) to enhance the effectiveness of RAR site inspection procedure has to be utilized, 3) further research for identifying and getting rid of negative factors in RAR is recommended.

  • PDF