This objective of this study is to thoroughly analyze the policies of international organizations and major advanced countries relevant to the realization of Green port To construct Green ports, there first must be competition to build such ports in sustainable, fixed quantities. Second, there is a great need for cooperation and support networks made binding by mutual agreements on ship recycling. Third, there is a need for scientific research on responses to changes in environmental regulations and on environmental issues. Today, the majority of the world's ports use gasoline or electric energy, and improving capacities for self-sufficiency through development of new and renewable energy is judged to be a pressing task. The conditions for an eco-friendly port is that it must be an important center for economic and industrial activity, and valuable as a site where people live and work, with residences and work places existing in close proximity.
Lim, Jeong-un;Kwon, Bong Ju;Kim, Doo Youl;Lee, Sang Yum;Rhee, Suk Keun
International Journal of Highway Engineering
/
v.18
no.2
/
pp.61-71
/
2016
PURPOSES: The objective of this study was to determine the optimum ratio of mix design, for a reclaimed asphalt pavement (RAP) content of 100%, for spray injection application. METHODS: A literature review revealed that spray injection is an efficient and cost-effective application for fixing small defective regions of an asphalt pavement. Rapid-setting polymer-modified asphalt mixtures prepared from two types of rapid-setting polymer asphalt emulsion were subjected to Marshall stability and wet track abrasion tests, in order to identify the optimum mix designs. RESULTS and CONCLUSIONS : Different mix designs of type A and type B emulsions were prepared using RAP and virgin aggregates, in order to compare the performance and determine the optimum mix design. The performance of mixtures prepared with RAP was superior to that of mixtures containing virgin aggregates. Moreover, for optimum ratio of the design, the binder content prepared from RAP was set to 1~2% lower than that consisting of virgin aggregates. Compared to their Type A counterparts, type B mixtures consisting of a reactive emulsion performed better in the Marshall stability and wet track abrasion tests. The initial results confirmed the advantages associated with using RAP for spray injection applications. Further studies will be performed to verify the difference in the optimum mix design and performance obtained in the lab-scale test and tests conducted at the job site by using the spray injection machine.
Journal of the Korean Recycled Construction Resources Institute
/
v.9
no.3
/
pp.229-235
/
2021
To dispose of waste, there are methods such as landfill, incineration, recycling, and sea discharge. Since the landfill wastes accumulate, there is a limit to the landfill site to accommodate them. In this paper, a time series analysis and current status of landfill allowance was analyzed over 20 years of landfills distributed throughout the country using GIS to understand the status of waste reclamation. As a result, the emissions of waste were gradually increasing, and as the emissions increased, the amount of landfill increased. The landfills in the Seoul metropolitan area have been saturated and need to be resolved as soon as possible.
The government introduced a waste disposal share system to reduce the annual increase in construction waste and to increase the recycling rate. As a result, the cost of waste treatment by public institutions is growing inevitably, causing disagreements and disputes between the public owner and the construction waste treatment company. They are also arguing for an increase in construction waste disposal costs. Therefore, in this study, an on-site survey was conducted to identify the current construction waste management problems and to find improvements. The survey was conducted for supervisors of public institutions, construction companies, and those related to waste treatment companies. The survey results were analyzed by dividing the construction waste management, regulations, treatment cost, and treatment method. The results of this study were used as primary data for changes in the construction waste guidelines and waste treatment costs of public institutions.
In Korea, numerous large-scale infrastructure construction projects and housing site developments are being undertaken. However, due to limited land availability, sourcing high-quality backfill materials that meet the standards for railroad and road embankment compaction and mechanically stabilized earth (MSE) retaining wall construction poses significant challenges. Concurrently, there has been an increase in structural failures of many MSE retaining walls, attributed primarily to reduced bearing capacity and impaired drainage performance, resulting from inadequate backfill compaction. This study aimed to analyze the structural performance and safety of an MSE retaining wall using recycled soil as backfill. We conducted small-scale model tests utilizing 3D printing technology combined with two-dimensional numerical analysis. The study quantitatively evaluated the MSE retaining wall's performance concerning the recycled soil mixing ratio and reinforcement installation methods. Furthermore, the utility of 3D printing was confirmed through the production of an experimental wall designed to facilitate easy reinforcement attachment, mirroring the conditions of actual MSE retaining wall construction.
The purpose of this study was to survey the trends of waste products in schools, its gathering and disposal, identification of problems and to analyze its disposal. Moreover, this study was aimed at basic suggestions about the establishment and plans of waste environmental education. 98 public primary and secondary schools were surveyed in Seoul during the month of March and April, 1991. Information was collected from each educational association by random sampling. Questionaries were used for this survey. To understand the disposal status of school waste and its reforms, this study surveyed the amount of waste by products, their origin and analyzed the disposal by type, one number of schools and teachers involved. The dump sited and disposal methods of school waste, its problems, and the status of school waste educations were researched, and ideal disposal methods and plans for waste education were suggested. The results were as follows. 1. The School's trash was produced by followings: paper, vinyle plastics, food, woods, metals, ceramics, glass, bottles, and ash from the heating system. The biggest cause of the school's waste as shown by the survey was a lack of environmental awareness(39.8%). The second biggest was the use of a one time use of disposable paper products(27.6%). 2. Waste collection by different grade levels were proven to be important but as you move from elementary to high school, the waste collecting operation decreased, in this connection between the students and waste collection itself it was significant on the other hand the teachers were not working as significant variables. 3. Of the school that collected waste 69.5 percent of the schools separately grouped common waste and recyclable waste. 25 schools(42.4%) received improvement on their environmental awareness of trash collection through this method. 4. From the number of disposal sites in surveyed schools, it was determined that the education of the necessity for separation of waste was performed in vain and accordingly the should require a real education in the future. 5. Regarding the method of disposal of waste the survey indicated that the #1 method of disposal was partial burning and the remains carried to a dump site by others(35,7%). In elementary schools the entire waste was taken by individuals to a dump site (33.3%). In high schools partial burning and then transported by individuals #1 in our survey(50%). 6. Relative to the problem of the treatment to waste, the emission of smoke from the burning was considered to be the #1 priority in our survey (62.3%) the problem of trash collection being delayed was 52.1%(1in our survey). 7. The present situation of environmental education of waste us lacking. Under present circumstances, the practice of public announcements for improvement and waste-paper collection has been going on vigorously but lacking in education as to the preparation of compositions for students the themes of public exhibitions, the organizing of voluntary associations should be part of the education system to reinforce student's awareness of proper waste disposal. 8. The most economical alternative for disposal was recycling usable waste or combustible material through a variety of education we can therefore educate students bring this education to their homes public servants will also be able to benefit in the waste disposal process with proper education. In conclusion we should intensify the systemical organization and the education of our waste disposal for a better environment.
Journal of the Korea institute for structural maintenance and inspection
/
v.17
no.3
/
pp.136-144
/
2013
In this study, in order to establish a plan that will enable safe use of renewable resources such as diverse industrial by-products and urban recycled materials, we conducted experiments that focused on flow, bleeding, compressive strength and environmental pollution evaluation to evaluate the material properties of low strength concrete using BFS and SS. In the case of low strength concrete using BFS and SS, blending of at least BFS 6000 within a 30% range regardless of the type of sand used was found to be the most effective approach for improving the workability by securing the minimum unit quantity of water, restraining the bleeding ratio and establishing compressive strength by taking account of the applicability at the work site. In particular, in view of the efficient use of SS, the optimal mixing condition was found to be the mixing of BFS 8000 with in the 30% range, not only for improving the workability restraining the bleeding ratio and establishing the compressive strength but also for application to the work site. Further, the results of tests on hazardous substance content and those of elution tests conducted on soil cement using SS indicated that all values satisfied the environmental standards without any harmful effects on the surrounding environment.
Soils contaminated with hydrocarbons and residual metals can be effectively treated by soil washing. In developing the soil washing process several major effects for separating contaminants from coarse soils progressively improved upon combinations of mining and chemical processing approaches. The pilot-scale soils washing process consists of the four major parts : 1) abrasive scouring, 2) scrubbing action using a washwater that is sometimes augmented by surfactants or other agents, 3) rinsing, and 4) regenerating the contaminated washwater. The plant was designed based upon the treatment capacity > 5 ton/hr on site. The lumpy contaminated soil fractions first experience deagglomeration and desliming passing through a rolling mill pipe. In the second unit the attrition scrubbing module equipped with paddles uses high-energy to remove contaminants from the soils. And a final rinsing system is assembled to separate the washwater containing the contaminants and very fine soils from the washed coarse soils. For recycling the contaminated washwater passes through a washwater clarifier specifically designed for flocculation, sedimentation and gravity separation of fine as well as flotation and separation of oils from the washwater. In order to more rapidly assess the applicability of soil washing at a potential site while minimizing the expense of mobilization and operation, a mobile-type soil washing process which is self-contained upon a trailer will be further developed.
Korean Journal of Construction Engineering and Management
/
v.15
no.6
/
pp.63-70
/
2014
Deconstruction of the building must be applied firstly in order to improve recycling and reuse of construction wastes. In this study have done a case study for deconstruction of an apartment. All construction waste(CW) which will be generated during deconstruction was examined in each part of the building. Because drawing did not exist in most of the old building, we drew up floor plans of buildings. After analyzing these drawings, estimated quantities of CW. It was measured working time of labor and equipments for deconstruction and general demolition on each building of the apartment. In addition, it was proposed in the volume and weight per unit after analyzing detailed measurement of CW which was generated in the process of deconstruction and traditional demolition. It suggested recovery rate at a site, volume and weight conversion factors, and waste basic unit per area that based on the results of comparative analysis on the amount of CW which is calculated from drawing and generated at a site. These factors will be used fundamental materials for estimating quantities and treatment cost of CW, and scheduling of works.
Journal of the Korea Organic Resources Recycling Association
/
v.23
no.2
/
pp.36-46
/
2015
Integration of crop-livestock farming has been a problem-solving mode for abatement of environmental pollution and recovery of resources in recent years. The objectives of this study were 1) to suggest the customized integration of crop-livestock farming model reflecting the regional characteristics through in-depth analysis of case study and 2) to analyze the livestock nutrients flow in terms of three primary elements as nitrogen(N), phosphorous(P), and potassium(K). The personal interview and survey were carried out in 2012 for a total of 161 farms from four different regions(NS, NW, JJ, YC) in South Korea. The mass balance analysis was used to suggest and evaluate the models for two sites(JJ and YC). The results showed that NS and NW sites produced relatively more livestock manure than the sites of YC and JJ because of the regional differences in livestock numbers and urbanization. The models were suggested for the site JJ and site YC, and 'two track model(energy and resource recovery)' and 'dispersal type model' were assigned respectively. For the nutrient flows, the releasing P and K with new models had increased up to 7%, while N release had decreased down to 15% in both YC and JJ sites compared to the present treatment system. Estimated value showed that there was oversupply of N (719 ton/yr) and $P_2O_5$ (1,269 ton/yr) in YC and deficiency of N (671 ton/yr) and excessive $P_2O_5$ (32 ton/yr) in JJ respectively. Therefore, P runoff has to be considered an eutrophication occurs in rural small stream when an integration of crop-livestock farm system is applied into both sites.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.