• 제목/요약/키워드: Site Planning Optimization

검색결과 34건 처리시간 0.024초

Optimizing Laser Scanner Selection and Installation through 3D Simulation-Based Planning - Focusing on Displacement Measurements of Retaining Wall Structures in Small-scale Buildings -

  • Lee, Gil-yong;Kim, Jun-Sang;Yoou, Geon hee;Kim, Young Suk
    • 한국건설관리학회논문집
    • /
    • 제25권3호
    • /
    • pp.68-82
    • /
    • 2024
  • The planning stage of laser scanning is crucial for acquiring high-quality 3D source data. It involves assessing the target space's environment and formulating an effective measurement strategy. However, existing practices often overlook on-site conditions, with decisions on scanner deployment and scanning locations relying heavily on the operators' experience. This approach has resulted in frequent modifications to scanning locations and diminished 3D data quality. Previous research has explored the selection of optimal scanner locations and conducted preliminary reviews through simulation, but these methods have significant drawbacks. They fail to consider scanner inaccuracies, do not support the use of multiple scanners, rely on less accurate 2D drawings, and require specialized knowledge in 3D modeling and programming. This study introduces an optimization technique for laser scanning planning using 3D simulation to address these issues. By evaluating the accuracy of scan data from various laser scanners and their positioning for scanning a retaining wall structure in a small-scale building, this method aids in refining the laser scanning plan. It enhances the decision-making process for end-users by ensuring data quality and reducing the need for plan adjustments during the planning phase.

물류량을 고려한 마감공사 자재운반의 실시간 경로탐색 최적화 연구 (Optimization of real-time path finding for material handling of finishing work considering the logistics flow)

  • 김완섭;이동민;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.170-171
    • /
    • 2015
  • Resource procurement and material handling are considered as a significant part of construction project especially in large or tall building construction site. There are multiple variables that must be considered in a construction site during finishing work such as movement of materials, equipments, and workers. Therefore, it is difficult for construction workers to find the material handling path solely by intuition. The aim of this study is to propose a real-time path finding model suitable for complicated logistics flow in the field. The model explores the optimal transport path of finishing material with its basis on optimization algorithm, and it determines the direction of the Smart Sign. The proposed model is expected to be utilized for planning of efficient finishing material handling.

  • PDF

유전 알고리즘을 적용한 토지이용 최적화 배분 연구 - 양평군 양평읍 일대를 대상으로 - (Land Use Optimization using Genetic Algorithms - Focused on Yangpyeong-eup -)

  • 박윤선;이동근;윤은주;모용원;임지훈
    • 환경영향평가
    • /
    • 제26권1호
    • /
    • pp.44-56
    • /
    • 2017
  • 지속가능한 발전은 도시의 효율적인 개발과 경제, 사회, 환경적 측면의 보전을 목표로 하기 때문에 중요하다. 그러나 우리나라의 빠른 도시화로 경제적 발전은 이루었지만 자원의 비효율적인 배분현상을 경험하게 되었고 이는 토지이용 배분도 예외가 아니다. 토지이용 배분의 문제가 어려운 이유는 다양한 목적을 고려해야하기 때문이며 이는 다목적 최적화의 방법에서 그 해결책을 찾을 수가 있다. 본 연구에서는 생태적으로 보존이 잘 되어있으며 인구 증가가 일어나고 있는 경기도 양평지역의 양평읍과 그 일대를 대상지로 선정하였다. 그리고 넓은 공간 탐색에 유리하고 토지이용 배분의 문제에서 널리 사용되고 있는 유전 알고리즘을 사용하였다. 유전알고리즘(GA)는 더 좋은 자손을 얻기 위하여 염색체의 교차 및 돌연변이의 과정을 거치는 적자생존의 원리가 작용하는 진화의 단계가 그 출발점이다. 본 연구는 변이의 방식에 변화를 주었으며 공간적 목적, 토지이용 전환 최소화, 생태계 보전 최대화, 경제적 이익 최대화라는 네 가지 목적과 특정 토지이용의 면적제한과 고정지역 설정이라는 제약요건을 두고 최적 안을 도출해내었다. 생태적으로 보존시켜야 할 곳에는 시가지가 형성되지 않았고, 시가지 면적 증가율이 높은 결과는 최적화의 방향인 '경제적 이익의 최대화'라는 점과 상응하였다. 적합도 값이 최소인 지점이 수렴지점임을 고려했을 때, 1500세대 부근에서 최적화가 일어났음을 알 수 있었다. 본 연구의 결과는 양평읍과 그 일대에 적용시킬 수 있는 효과적인 지원방안을 마련하는데 도움이 될 수 있을 것으로 판단된다.

ei-Rail을 활용한 노선설계 모형의 적용 및 중앙선/서해안선 사례분석 (Implementation and Analysis of Railway Design Model using ei-Rail with Joong-Ang and Seo-Hae Lines)

  • 신영호;김정현;오지택
    • 대한토목학회논문집
    • /
    • 제35권2호
    • /
    • pp.407-415
    • /
    • 2015
  • 철도사업을 추진함에 있어, 지금까지 대부분의 사업은 노선과 선형계획은 엔지니어가 현장 사전조사 결과 및 지형도 등을 이용하여 한정된 수의 대안을 설정하여 분석하는 방식으로 수행되어 왔다. 본 연구에서는 유전자 알고리즘을 이용한 지능형 철도선형계획 프로그램(ei-Rail)을 개발하여, 가능한 모든 대안에 대하여 선형요소 및 공사비에 대한 평가를 가능하게 하였다. 그리고 기존에 계획된 노선에 대한 비교 평가를 통하여 기존 대안보다 사업비를 절감할 수 있을 뿐만 아니라, 이에 소요되는 비용과 시간도 단축할 수 있는 것으로 나타났다. 본 연구의 결과는 향후 국내외 철도사업 계획 수립에 소요되는 비용과 시간, 그리고 전체 사업비 절감을 가능케 함으로써 철도분야 발전에 도움이 될 수 있을 것으로 기대할 수 있다.

Traditional Software Development for WLAN Propagation Model

  • Ibrahim Anwar Hassan;Ismail Mahamod;Jumari Kasmiran;Kiong Tiong Sieh
    • Journal of Electrical Engineering and Technology
    • /
    • 제2권1호
    • /
    • pp.123-128
    • /
    • 2007
  • SPWPM traditional software development is surveyed and essential problems are investigated on the basis of system wireless link considerations. This paper presents the current state software planning tools for wireless LAN link optimization. The software directory is based on combination of MatLab and MapInfo software and measurement which gives the best grouping parameters to build up the software development. Among the requirements assumed, the WLAN site selections must be Line-of-sight (LOS) or near line of sight (NLOS) field strength prediction for either point to point or point to multi points. The results obtainable the out put of the program include two-dimensional (2D) and three dimensional (3D) plots for creating the link; design parameters through GUI representing the height and location for each antenna is depending on K-factor of the area and transmit antenna location.

Research on Facility Layout of Prefabricated Building Construction Site

  • Yang, Zhehui;Lu, Ying;Zhang, Xing;Sun, Mingkang;Shi, Yufeng
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.42-51
    • /
    • 2017
  • Due to the high degree of mechanization and the good environmental benefits, the prefabricated buildings are being promoted in China. The construction site layout of the prefabricated buildings has important influence on its safety benefit. However, few scholars have studied the safety problem on it. Firstly, in order to give a follow-up study foreshadowing the characteristics of prefabricated buildings are analyzed, the research assumptions are given and three types of safety buffers are established. And then a mult-objective model for the prefabricated buildings site layout is presented: taking into account the limits of noise, the coverage of the tower crane and the possibility of exceeding boundaries and overlapping, the constraints are and designed established respectively; Based on the improved System Layout Planning (SLP) method, the efficiency\cost\safety interaction matrices among the facilities are also founded for objective function. For the sake of convenience, a hypothetical facility layout case of the prefabricated building is used, the optimal solution of that is obtained in MATLAB with particle swarm algorithm (PSO), which proves the effectiveness of the model presented in this paper.

  • PDF

건축물 마감공사 자재 배치 최적화 모델 (A Layout Planning Optimization Model for Finishing Work)

  • 박문서;양영준;이현수;한상원;지세현
    • 한국건설관리학회논문집
    • /
    • 제12권1호
    • /
    • pp.43-52
    • /
    • 2011
  • 불필요한 자원 이동 및 운반은 건설 현장 작업 생산성에 부정적인 영향을 미치는 주요 원인 중 하나이다. 이에 따라 레이아웃 관련 연구들은 사이트 수준에서 이뤄지는 자원의 이동 및 운반을 최소화하기 위한 관리 기술과 기법들을 개발하기 위해서 노력하였다. 더불어 건축물이 대형화되고 평면이 복잡해지면서 작업층 내 레이아웃 연구의 필요성도 제기되었으나, 현재 건물 내부 자재 이동 및 운반에 대한 최적화 연구는 활발히 이루어지지 않고 있는 실정이다. 따라서 본 연구에서는 유전 알고리즘을 이용하여 작업층 내 마감 자재의 위치를 최적화할 수 있는 모델을 개발하였다. 구축된 모델은 복잡한 건축 평면 위에서 다양한 자재들의 배치를 계획할 수 있으며, 이때 모델로부터 도출된 최적화된 자재 배치 계획은 작업 당일 작업자에 의한 총 자재 운반 시간을 최소화할 수 있다. 또한 작업과 자재 간 운반거리를 현실적으로 산정하기 위해서 실제 운반 거리 개념을 적용하였다. 개발된 모델의 적용성을 확인하고 기존 방법론과의 비교/분석을 위해서 실제 고층 주상복합 아파트를 대상으로 모델을 적용하였다.

엔드밀 원형 가공 시 런아웃에 따른 가공조건 최적화 (Optimization of Processing Conditions According to Run-out During End-mill Round Machining)

  • 이하늘;최희관;김영신;전의식
    • 한국기계가공학회지
    • /
    • 제20권1호
    • /
    • pp.57-65
    • /
    • 2021
  • With the increased utilization of CAM programs, end-mill processing is most commonly used for machining and metal processing. In particular, hole or shaft machining has high assembly precision, which inevitably leads to high utilization of end mills. However, the analysis of quality characteristics according to the process conditions of end mills is not performed systematically at the site, causing poor quality and productivity. The most influential factor of quality is the runout of the end mill. In this paper, the number of turns of the end mill, number of tool blades, cutting direction, and artificial runout volume were determined to identify the correlation between the epicenter, cylindricality, and surface roughness. Two types of end mills, three levels of runout, three levels of rotational speed, and two cutting directions were considered and 36 rounds of hole processing were conducted. For the analysis of shape characteristics according to the set process variables, the experimental planning method was applied to the measured specimen and the processing characteristics were analyzed according to the runout of the end mill through correlation analysis.

시뮬레이션을 이용한 석면 해체공사의 최적화 공정계획 모델 (A Model for Optimization Process of Asbestos Dismantling Work Using Simulation)

  • 조형준;노재윤;이호현;이수민;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2022
  • In Korea, asbestos removal has been actively carried out nationwide since 2015 when asbestos was completely banned as a first-class carcinogen. Since scattering dust generated in the process of removing asbestos causes fatal diseases such as asbestos lung disease and lung cancer, concerns are growing over the safety of construction workers and building users undergoing dismantling. For this reason, regulations on asbestos sites have been strengthened and prior studies on safety and risk assessment have been conducted, but research on actual site data collection and process planning is insufficient even though safety is reduced due to delay in site construction period. Therefore, it is necessary to analyze the work and delay factors of the asbestos dismantling process and develop an optimized process plan model for workers. This study is an initial step to develop an optimized process plan model that considers the safety and productivity of asbestos dismantling work, and aims to help establish an optimized process plan for asbestos dismantling process using website clone simulation.

  • PDF

DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구 (Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM))

  • 김승호;김상용;전지훈;안성훈
    • 한국건축시공학회지
    • /
    • 제16권2호
    • /
    • pp.151-159
    • /
    • 2016
  • 건설프로젝트에서 요구되는 중요한 장비 중 하나는 타워크레인 이다. 특히, 대부분의 고층건물 공사에서는 자재들의 이동작업들을 수행하기 위해 타워크레인이 더욱 요구되어진다. 따라서 타워크레인의 양중계획은 공사기간과 비용의 측면에서도 중요하다 할 수 있다. 하지만, 건설현장 대부분의 양중계획은 여전히 합리적인 작업의 분석없이 현장 관리자들의 경험과 직관에 의존하여 행해지고 있다. Dependency structure matrix (DSM)는 CPM과 Pert 같은 기존의 툴과는 다르게 작업 활동 순서 계획과 정보관리를 하는데 있어서 유용한 툴이다. 본 연구는 타워크레인의 양중 관리를 향상시키기 위하여 실제 건설 현장의 Case study를 통해 타워크레인 양중관리의 새로운 틀을 DSM을 이용하여 제시 할 것이다. DSM을 이용한 T/C의 양중계획의 Case study를 통해 나타난 결과는 기준층 양중 계획에 있어서 T/C의 양중계획을 최적화 시키는데 매우 유용하다는 결론을 보여주었다.