• Title/Summary/Keyword: Simulation operation

Search Result 5,629, Processing Time 0.033 seconds

Efficient Yard Tractor Control Systems for the Dual Cycling (효율적인 듀얼 사이클을 위한 야드 트랙터 통제 시스템)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.11a
    • /
    • pp.170-171
    • /
    • 2011
  • Recently, container terminal managers make an experiment on the double cycle and dual cycle operation, which ship loading and unloading were carried out simultaneously, for increasing the productivity of quay side. If, however, we make an experiment on dual cycle operation in a real job site, the efficiency is poor up to terminal operation method as YTs(Yard Tractors)' allocation method, QCs(Quay Cranes)' working speed, and position of export containers. Especially, using the existing yard operation method, it is difficult to support to dual and double cycle operation. Therefore, this paper examine more efficient terminal operation method, when terminal uses dual cycle operation. We developed a simulation model using simulation analysis software, Arena.

  • PDF

The simulation study on natural circulation operating characteristics of FNPP in inclined condition

  • Li, Ren;Xia, Genglei;Peng, Minjun;Sun, Lin
    • Nuclear Engineering and Technology
    • /
    • v.51 no.7
    • /
    • pp.1738-1748
    • /
    • 2019
  • Previous research has shown that the inclined condition has an impact on the natural circulation (natural circulation) mode operation of Floating Nuclear Power Plant (FNPP) mounted on the movable marine platform. Due to its compact structure, small volume, strong maneuverability, the Integral Pressurized Water Reactor (IPWR) is adopted as marine reactor in general. The OTSGs of IPWR are symmetrically arranged in the annular region between the reactor vessel and core support barrel in this paper. Therefore, many parallel natural circulation loops are built between the core and the OTSGs primary side when the main pump is stopped. and the inclined condition would lead to discrepancies of the natural circulation drive head among the OTSGs in different locations. In addition, the flow rate and temperature nonuniform distribution of the core caused by inclined condition are coupled with the thermal hydraulics parameters maldistribution caused by OTSG group operating mode on low power operation. By means of the RELAP5 codes were modified by adding module calculating the effect of inclined, heaving and rolling condition, the simulation model of IPWR in inclined condition was built. Using the models developed, the influences on natural circulation operation by inclined angle and OTSG position, the transitions between forced circulation (forced circulation) and natural circulation and the effect on natural circulation operation by different OTSG grouping situations in inclined condition were analyzed. It was observed that a larger inclined angle results the temperature of the core outlet is too high and the OTSG superheat steam is insufficient in natural circulation mode operation. In general, the inclined angle is smaller unless the hull is destroyed seriously or the platform overturn in the ocean. In consequence, the results indicated that the IPWR in the movable marine platform in natural circulation mode operation is safety. Selecting an appropriate average temperature setting value or operating the uplifted OTSG group individually is able to reduce the influence on natural circulation flow of IPWR by inclined condition.

Development of Hardware Simulator for Operation Analysis of DC Microgrid (DC 마이크로그리드의 동작분석을 위한 하드웨어 시뮬레이터 개발)

  • Lee, Ji-Heon;Han, Byung-Moon
    • Proceedings of the KIPE Conference
    • /
    • 2011.07a
    • /
    • pp.251-252
    • /
    • 2011
  • This paper describes the development of hardware simulator for the operation analysis of DC microgrid, which has a wind power, solar power and fuel cell as a distributed generation, and a supercapacitor and battery as an energy storage. A detailed simulation model for the DC microgrid was developed for operation analysis. Based on simulation results a hardware simulator was built in the lab for the purpose of operation analysis. The developed hardware simulator can be utilized to evaluate with practical manner the performance of actual microgrid in the field.

  • PDF

Canal Operation Simulation of Middle Route Project

  • Fan, Jie
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.26-32
    • /
    • 2008
  • Middle Route Project, the largest water conveyance system in China delivers the water of Changjiang River to North China. In order to create canal operation simulation system, mathematical models are established based on the analysis of hydraulics about steady flow, unsteady flow, and check gate. By simulating the canal operation behavior, we improved the check gate control algorithm and predicted the change process of water surface and flow profile which is very valuable to actual canal operation.

  • PDF

Master-Slave type DC-DC Converters Parallel Operation by ZCT method (ZCT방식의 master-slave형 DC-DC컨버터 병렬운전)

  • 박상은;송승찬;진정태;이기홍;성세진
    • Proceedings of the KIPE Conference
    • /
    • 1999.07a
    • /
    • pp.655-658
    • /
    • 1999
  • In this paper, Parallel operation of two DC-DC converters which we have ever done before need two CTs to do load current sharing. However, we have proposed a new method called ZCT method that can share load current with only a CT as doing parallel operation two converters with same converter capacity. To confirm parallel performance by a proposed DC-DC converter parallel operation method, we have done computer simulation and experiment. It is certain that we have showed to achieve two converters current sharing performance efficiently through simulation and experiment at result.

  • PDF

Optimal Operation Scheduling Using Possibility Fuzzy Theory on Cogeneration Systems Connected with Auxiliary Equipment (각종 보조설비가 연계된 열병합발전시스템에서 가능성 퍼지이론을 적용한 최적운전계획수립)

  • Kim, Sung-Il;Jung, Chang-Ho;Lee, Jong-Beon
    • Proceedings of the KIEE Conference
    • /
    • 1995.11a
    • /
    • pp.128-130
    • /
    • 1995
  • This paper presents the optimal operation scheduling on cogeneration systems connected with auxiliary equipment by using the possibility fuzzy theory. The probability fuzzy theory is a method to obtain the possibility of the solution from the fuzzification of coefficients. Simulation is carried out to obtain the boundary of heat production in each time interval. Simulation results shows effectively the flexible operation boundary to establish operation scheduling.

  • PDF

Transport Simulation of The Operation Modes in a KT-2 Tokamak

  • B. G. Hong;Lee, K. W.;Kim, S. K.
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1995.05b
    • /
    • pp.1027-1032
    • /
    • 1995
  • To develop operation scenarios of KT-2 tokamak, 3 operation modes(OH, high ${\beta}$ and high bootstrap) deduced from zero dimensional steady-state power balance are examined with TSC(Tokamak Simulation Code) time-dependent transport .ode. Plasma profiles are evaluated self consistently during simulations and plasma shapes are maintained by feedback control on PF coil currents. Simulations show operation modes which are typical of KT-2 expected discharges are compatible with the KT-2 PF system design specifications[1].

  • PDF

Probabilistic Optimal Weekly Coordination of Thermal-Pumped Storage Power System based on the Maximum Principle (최대원리에 의한 화력-양수발전시스템의 확률적 운전시뮬레이션 모델)

  • Lee, Bong-Yong;Shim, Keon-Bo
    • Proceedings of the KIEE Conference
    • /
    • 1991.07a
    • /
    • pp.411-416
    • /
    • 1991
  • Operation simulation is a key factor to evaluate investment and operation in a power utility. Probabilistic production simulation is of major concern. With pumped-storage plant, production simulation is not an easy task, because its economy should fully be exploited. In addition, usual operation interval is a week rather than a day. Most existing models are based on approximate production simulation such as adopting simple priority orders of generations. This study is based on the more elaborate model developed by authors. Further, a policy of weekly coordination is established based on the Maximum Principle. Chronological load curve instead of usual load duration curve is used and the accuracy in simulation is enhahced. Resulting economics are compared. Deviation between these two toad curve is shown.

  • PDF

Development of simulation equipment system on EPB shield TBM hood operation (토압식 쉴드TBM의 후드부 시뮬레이션 장비 시스템 개발에 대한 연구)

  • Kim, Sang-Hwan;Oh, Tae-Sang;Park, Soo-Hwan;Lee, Choong-Yeoul;Park, Jong-Kwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.193-201
    • /
    • 2014
  • This paper presents the development of simulation system on EPB shield TBM Hood operation. In recent, EPB shield TBM is widely used in the tunnel construction. Since the hood system of the EPB shield TBM is most important to excavate the tunnel, it is necessary to perform the simulation of hood system to investigate the design and operation parameters prior to tunnel construction. In order to carry out this study, the scaled simulation system was designed and developed. The model tests were performed to verify the developed system. During the simulation, the earth pressures developed in the chamber during tunnelling were measured to evaluate the operation technique. The test results obtained by the developed simulation system show clearly the similar behaviour of TBM hood compared with the field data. It was also found that the ground loss during tunnelling is dependent on the change of earth pressure in chamber. Therefore, the simulation system developed in this study will be very useful to evaluate the operation technique of the TBM hood prior to tunnel construction. In addition, this system will be applied in a various condition of ground to get the operating information.

OPTIMUM STORAGE REALLOCATION AND GATE OPERATION IN MULTIPURPOSE RESERVOIRS

  • Hamid Moradkhani
    • Water Engineering Research
    • /
    • v.3 no.1
    • /
    • pp.57-62
    • /
    • 2002
  • This research is intended to integrate long-term operation rules and real time operation policy for conservation & flood control in a reservoir. The familiar Yield model has been modified and used to provide long-term rule curves. The model employs linear programming technique under given physical conditions, i.e., total capacity, dead storage, spillways, outlet capacity and their respective elevations to find required and desired minimum storage fur different demands. To investigate the system behavior resulting from the above-mentioned operating policy, i.e., the rule curves, the simulation model was used. Results of the simulation model show that the results of the optimization model are indeed valid. After confirmation of the above mentioned rule curves by the simulation models, gate operation procedure was merged with the long term operation rules to determine the optimum reservoir operating policy. In the gate operation procedure, operating policy in downstream flood plain, i.e., determination of damaging and non-damaging discharges in flood plain, peak floods, which could be routed by reservoir, are determined. Also outflow hydrograph and variations of water surface levels for two known hydrographs are determined. To examine efficiency of the above-mentioned models and their ability in determining the optimum operation policy, Esteghlal reservoir in Iran was analyzed as a case study. A numerical model fur the solution of two-dimensional dam break problems using fractional step method is developed on unstructured grid. The model is based on second-order Weighted Averaged Flux(WAF) scheme with HLLC approximate Riemann solver. To control the nonphysical oscillations associated with second-order accuracy, TVD scheme with SUPERBEE limiter is used. The developed model is verified by comparing the computational solutions with analytic solutions in idealized test cases. Very good agreements have been achieved in the verifications.

  • PDF