• Title/Summary/Keyword: Simulation operation

Search Result 5,661, Processing Time 0.033 seconds

Simulation Analysis of the Train Overhaul Maintenance Capacity for Rolling Stock Depot (열차 차량기지의 중정비 검수 용량 시뮬레이션 분석)

  • Jeon, Byoung-Hack;Lee, Won-Young;Jang, Seong-Young;Yoo, Jae-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1481-1498
    • /
    • 2007
  • As railroad industry face the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high speed long distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for detailed operations of the sample maintenance center are developed. In this study, standard maintenance procedures, layout, equipments and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. Three simulation analysis using the developed simulation model are done. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Lastly, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared.

  • PDF

Applications of online simulation supporting PWR operations

  • Wang, Chunbing;Duan, Qizhi;Zhang, Chao;Fan, Yipeng
    • Nuclear Engineering and Technology
    • /
    • v.53 no.3
    • /
    • pp.842-850
    • /
    • 2021
  • Real Time Simulation (RTS) has long been used in the nuclear power industry for operator training and engineering purposes. And, Online Simulation (OLS) is based on RTS and with connection to the plant information system to acquire the measurement data in real time for calibrating the simulation models and following plant operation, for the purposes of analyzing plant events and providing indicative signs of malfunctioning. An OLS system has been developed to support PWR operations for CPR1000 plants. The OLS system provides graphical user interface (GUI) for operators to monitor critical plant operations for preventing faulty operation or analyzing plant events. Functionalities of the OLS system are depicted through the maneuvering of the GUI for various OLS functional modules in the system.

Analysis of Fuel Economy for Series Plug-in Hybrid Electric Bus according to Engine Operation Strategy Based on Simulation (직렬형 플러그인 하이브리드 전기 버스의 엔진 구동 전략에 따른 시뮬레이션 기반 연비 분석)

  • Kim, Jinseong;Lee, Chibum;Park, Yeong-Il
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.22 no.5
    • /
    • pp.102-107
    • /
    • 2014
  • Because of high oil prices and emission gas problems, many governments tighten regulation of fuel economy and emission gas. For Passenger car, there are many researches for plug-in hybrid electric vehicles and they are being manufactured. On the other hand, there are few researches for plug-in hybrid electric bus that is heavy commercial vehicle. In this study, analysis of fuel economy for series plug-in hybrid electric bus according to engine operation strategy based on simulation is conducted. Forward simulator is developed using Autonomie. Engine operation strategies consist on constant engine operation strategy and engine on/off operation strategy. Considering the engine operation strategy, results of vehicle speed, engine operating points and fuel economy are obtained and analyzed. As a result, engine on/off operation strategy has more advantage than constant engine operation strategy in terms of fuel economy.

Efficient Yard Operation for the Dual Cycling in Container Terminal (컨테이너 터미널의 효율적인 듀얼 사이클을 위한 야드 운영)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Journal of Navigation and Port Research
    • /
    • v.35 no.1
    • /
    • pp.71-76
    • /
    • 2011
  • Recently, container terminal managers make an experiment on the double cycle and dual cycle operation, which ship loading and unloading were carried out simultaneously, for increasing the productivity of quay side. If, however, we make an experiment on dual cycle operation in a real job site, the efficiency is poor up to terminal operation method as YTs(Yard Tractors)' allocation method, QCs(Quay Cranes)' working speed, and position of export containers. Especially, using the existing yard operation method, it is difficult to support to dual and double cycle operation. Therefore, this paper examine more efficient terminal operation method, when terminal uses dual cycle operation. We developed a simulation model using simulation analysis software, Arena.

Agent-based Lift-car Group Operation Optimization Model in High-rise Building Construction

  • Jung, Minhyuk;Park, Moonseo;Lee, Hyun-soo;Hyun, Hosang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.221-225
    • /
    • 2015
  • To hoist construction workers to their working space is directly related to the productivity of building construction since hoisting tasks are carried out during the working time. In order to reduce hoisting time in the condition that the number of construction lift-cars is limited, various types of the lift-cars group operation plans such as zoning and sky-lobby have been applied. However, previous researches on them cannot be compared in the performance due to their methodological limitation, discrete-event simulation methods, and cannot be find better solution to increase the performance. Therefore, this research proposed the simulation-based optimization model combining the agent-based simulation method to the scatter search optimization methods. Using the proposed model, this paper carried out the comparison analysis on the performance of typical operation plans and also optimize an operation plans by controlling the service range of lift-cars, the size and number of service zones. In this case study, it is verified that better alternatives than typical operation plans can be exists and it is possible to increase the productivity of building construction.

  • PDF

Computer Simulation Approach to Analysis of Train Operation and Control (컴퓨터 시뮬레이션을 이용한 열차운행제어 분석에 대한 기초검토)

  • Lee Dong-Sung;Choi Kyu-Hyoung;Kim Wang-Kon
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1212-1218
    • /
    • 2004
  • Train operation simulation program models the railway facilities such as railway network configuration, railway parameters and signalling equipments, as well as the train performances such as traction performance, schedules, timetable. As the program can emulate exactly the train movements on the railway network by using computer simulation techniques, it can be applied to the optimization of the train operation plan and the reform of railway facilities. This paper provides a simulation case study which shows that we can simulate exactly the unusual situations of train traffic operation when train movements are disturbed by accidents, and also provide the effective countermeasure to minimize the train delays.

  • PDF

Optimal Operational Schemes of Mailing Center based on Simulation (Simulation 기반 우편집중국 최적운영 방안)

  • Nam, Yoon-Seok;Lee, Hong-Chul
    • IE interfaces
    • /
    • v.13 no.4
    • /
    • pp.680-687
    • /
    • 2000
  • The objectives of this research are to establish the operation scheduling and the preventive maintenance system in order to optimize the operation of mailing center. For the optimal operation scheduling of mailing process, the existing workflow of mailing process and that of required time are investigated prior to simulation modeling. The simulation experiments are conducted to increase the nextday delivery rate. The best alternative whose nextday delivery rate up to 100% is selected based the AHP(Analytic Hierarchy Process) method. The optimal work scheduling of all mailing centers are also presented. In addition, the CMMS(Computerized Maintenance Management System) for preventive maintenance is introduced for efficient operation of highly automated facilities of mailing center.

  • PDF

A Study on the Fundamental Comparison of Simulation and Optimization Approaches for Water Resources Systems Planning and Management (수자원시스템의 효율적 운영을 위한 시뮬레이션과 최적화 기법의 원론적 비교 연구)

  • Kong, Jeong-Taek;Kim, Jaehee;Kim, Sheung-Kown
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.4
    • /
    • pp.373-387
    • /
    • 2013
  • For the efficient operation and management of the water resources system, coordinated operation of weirs and reservoirs is required. A simulation based, and an optimization based approaches are available to deal with the operation and management problems. The simulation based approach does not guarantee an optimal solution, and the optimization based approach is not so flexible to consider, complex, nonlinear problems we will face when trying to allocate water to different uses, various demand sectors in a basin. Hence, it is important to develop a model that would compensate for the weak points in both models. We will compare and contrast intrinsic and extrinsic properties of two modeling approaches, addressing issues related to setting system operation and control rules that would lead us to more efficient use of water in the basin. As a result, we propose to use CoWMOM(Coordinated weirs and multi-reservoir operating model), a "simulation based" optimization model for a simple simulation of the past periods, and for the real-time simulation process considering uncertain inflow.

A Study on the Efficiency of Energy Storage System Applied to the Power Traction System of DC Electric Railway (직류전기철도에서 운행시격에 따른 에너지저장장치의 효율에 관한 연구)

  • Kim, Sung-Dae;Choi, Kyu-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.754-760
    • /
    • 2011
  • In the DC traction system, a large load current of electric railcar leads to a voltage drop when a vehicle starts, and the regenerative power generated by brake system increases the catenary voltage. To minimize the voltage fluctuation during the train operation and make use of the regenerative power, several types of energy storage systems are being studied. The energy storage system that is being recently introduced consists of the supercapacitors for energy storage and the bi-direction DC/DC converter for charge/discharge control. The efficiency of the energy storage system depends on the train operation pattern. In this paper, the operation efficiency of the energy storage system was quantitatively analyzed via simulation study taking consideration of the train operation patterns. The simulation was conducted changing the headway of trains with the energy storage system that uses the bi-direction DC/DC converter and supercapacitor. The simulation results showed that the operation efficiency of the energy storage system increases as the headway increase.

  • PDF

A dynamic simulation study on SCR (Stream Carbon dioxide Reforming) process for pilot plant operation (파일럿 플랜트 최적운전을 위한 SCR공정 동적 모사)

  • Kim, Yong Heon;Bae, Ji Han;Park, Myoung Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.136.2-136.2
    • /
    • 2011
  • A dynamic simulation study on SCR process in GTL process was carried out in order to find optimum operation conditions for pilot plant operation. Optimum operating conditions for SCR synthesis gas process were determined by changing operation variables such as feed temperature and pressure. It was also assumed that physical properties of reaction medium were governed by RKS (Redlich-Kwong-Soave) equation. The effect of temperature and pressure on synthesis gas process $H_2$/CO ratio were mainly examined. Dynamic simulation results were fed back to feed operation condition for optimizing productivity, especially for appropriate condition to FT (Fischer-Tropsch) synthesis unit.

  • PDF