This study analyzes the impact on geomorphic changes downstream due to alternate bars developed weir upstream through laboratory experiments. The disturbance, such as a spur in the side wall, of the flow at the inlet of the channel triggers the development of alternate bar upstream at the beginning of the experiment, and gradually moved downstream with keeping their shapes over time. The bed in the downstream of weir in the mid of channel scoured due to the scarcity of sediment inflow because weir upstream traps it. Moreover, bar migration speed decreases as the bars approaches to the weir with time. However, as time increases, the alternate bars upstream migrate over the weir, and sediment in the eroded bed of the weir downstream are deposited. The phase of the bar upstream changes oppositely after passing through the weir. The phase of the bar downstream changes rapidly as the shape of alternate bar is clear upstream, which is affected by the strong disturbance. The phase of bar changes, and the bar migration speed decreases gradually with time, and finally stopped due to forcing effects on the bar by the disturbance. The faster the reaction of alternate bar with a long spur, the larger the bar height formed downstream and the shorter the bar length. This means that the larger the forcing effect of bar, the more it affects the bar migration. In addition, although the size of the alternate bar increases over time, the bar doesn't migrate downstream and a forced bar is generated.
The small and medium sized dams have the fill dam type of a lot of occasions, which are often weak in cases of major floods. For this reason, although a countermeasure is in great need, due to the importance of the facilities and financial situations, no direct safety measures have been taken. In this study, in order to minimize construction expenditure for practical safety measures in cases of major floods, the overflow section of spillway has been analyzed focusing on how the overflow capacity will increase in the case of partially rebuilding a part of the overflow section of spillway favorable for hydraulic conditions. The Labyrinth weir and movable weir was chosen for reconstruction models of the overflow section. Moreover, for analyzing the after-effects of the reconstruction, a small scale dam was temporarily chosen for various experiments such as the hydraulic model testing and the three dimension numerical evaluation through the use of Flow-3D.
Sung, Bok Kyeong;Yoon, Tae Hyung;Hwang, Sung Hwan;Moon, Young Il
Proceedings of the Korea Water Resources Association Conference
/
2015.05a
/
pp.510-510
/
2015
우리나라는 1960년대 경제개발에 의한 산업화 이후, 토지이용이 꾸준히 확대되어 왔으며, 이로 인해 불투수면적 증가하였고, 배수시설의 확장은 표면조도계수 및 침투율을 급격히 감소시키는 요인으로 작용하여 우수 및 오수의 유출속도가 증가하여 홍수방어능력이 감소하였다. 또한 기후변화로 인한 국지성 집중호우의 발생빈도가 증가함에 따라 이로 인한 피해가 더욱 가중되고 있다. 현재 이에 대한 대응능력을 갖추기 위한 치수대책을 꾸준히 실시하고 있으나 주로 홍수량을 줄이기 보다는 증가하는 홍수량을 처리하기 위한 하천정비, 하수관, 유수지 및 펌프장 증설을 중심으로 이루어지고 있다. 이는 하천 하류의 홍수량을 증가시켜 하천주변에 침수피해를 일으키고 있어 보다 항구적인 대책이 요구되고 있다. 본 연구에서는 특정유역에 침수가 발생할 시 횡월류위어 가동방식(고정보-가동보)에 따라 미치는 침수영향에 대해 저류조 유입특성(총 유입량, 유입유량 첨두치), 침수지역 침수특성(첨두유량, 첨두수위, 첨두유속, 침수면적, 월류시간)을 정량적으로 분석하여 향후 저류지 설치에 따른 횡월류위어 가동방식 선정에 기여하고자 한다.
Proceedings of the Korea Water Resources Association Conference
/
2008.05a
/
pp.660-663
/
2008
방수로는 본류의 첨두홍수량을 분담하여 대상 지역의 홍수피해가능성을 줄이기 위해서 도입되는 구조적 홍수방어대책의 하나로 특히 도시화로 인하여 기존 하천 유역의 저류 능력이 감소하여 홍수 시 유출량이 증가함에 따라 방수로의 필요성은 점차 늘어나고 있다. 외국의 경우에는 이미 대표적인 구조적 홍수방어대책으로 활용되어 그 효과가 이미 확인되어 있다. 방수로로 분담되는 유량은 일반적으로 방수로 유입부에 설치되어 있는 횡월류위어의 월류량을 정확히 산정함으로써 알 수 있다. 따라서 방수로의 홍수방어능력을 알기위해서는 이러한 유입부 횡월류위어의 월류량을 정확히 평가하는 것이 중요하다. 횡월류위어의 형태는 여러 가지가 있지만 가장 기본적인 형태로 예연위어 형태와 광정위어 형태가 있다. 본 연구에서는 그 중에서 광정횡월류위어(broad-crested side weir)을 대상으로 실제 하도와 유사한 흐름 조건을 가지도록 상대적으로 작은 횡월류위어길이(L)와 본류 폭(B) 비(L/B)를 가지는 실험 수로를 이용하여 광정횡월류위어에 대한 실험을 수행한 후 유량 계수를 산정하여 본류 흐름 조건 및 횡월류위어 제원 변화에 따른 영향을 검토하였다. 광정횡월류위어에서의 유량계수도 기본적으로 예연횡월류위어와 동일한 방식을 이용하여 검토할 수 있으며, 동일한 주요 영향 변수를 포함하지만, 위어 폭 W가 횡월류위어의 월류 유량과 본류 유황에 영향을 미치게 된다. 따라서 본 연구에서는 광정횡월류위어의 특성에 따른 산정된 유량계수의 변화에 초점을 두어 분석을 수행하였다.
Kim, Duck-Gil;Lee, Lim-Yeol;Lee, Chang-Won;Kang, Na-Rae;Lee, Jong-So;Kim, Hung-Soo
Journal of Wetlands Research
/
v.13
no.2
/
pp.307-317
/
2011
Recently, we have a growing interest in the washland construction for the function of flood control. Therefore this study analyzed flood reduction effect of washland using hydraulic experiment. We used open-channel unit for flood reduction effect of washland. And we used side weir to lateral structure. The result of hydraulic experiment showed a decrease of the average velocity and discharge according to the installation location of side weir. Also, we compared the results of HEC-RAS model and hydraulic experiment for the review of the result of hydraulic experiment. As the result, hydraulic experiment and HEC-RAS model have showed the similar results.
Magazine of the Korean Society of Agricultural Engineers
/
v.14
no.3
/
pp.2716-2725
/
1972
Side channel spillways based on Hinds theory were tested. Surface water level at the beginning point of side channel is the same as the crest level of weir in the usual design. Here, side channel section were moved upwards $\frac{1}{2}$ of the total head on the crest and test(revised experiment) were made. In the revised experiments, coefficients of discharge for design flood (Q) were the same with that of original design experiments. In case of 1.2Q a little influence of submergence were appeared, coefficients of discharge were decreased to be about 97.6% of that of original design experiments, therefore, Reservoir flood water level become higher about 2-3cm than original case. So revised design can be used for actual purpose and it will brings much savings in construction cost of side channel spillway.
Journal of Korean Society of Disaster and Security
/
v.16
no.1
/
pp.81-89
/
2023
Recently, due to global warming and urbanization due to the influence of abnormal weather, weather changes are increasing worldwide. Various measures have been proposed to reduce flood damage as flood volume increases due to problems such as an increase in impermeable area due to urbanization and reckless development. In this study, flow characteristics and overflow volume were analyzed using FLOW-3D, a three-dimensional CFD model, in accordance with changes in the cross-flow weir inlet angle installed in the meandering river section, and a basic study was conducted to evaluate the overflow capacity and calculate the flow coefficient. As a result of the analysis, the smaller the inflow angle of the transverse overflow, the lower the water level and flow rate of the main water flow after passing the transverse overflow, and the higher the inflow angle, the higher the water level and the flow rate. In addition, it was confirmed that the direct downstream flow rate decreased compared to the upstream flow rate when the inflow angle of the transverse overflow was 40° or higher.
In this study, hydraulic characteristics for upstream migration of fish in a pool-and-weir fishway were analyzed through experiment. The results showed that streaming flow was preferable to plunging flow for upstream migration of fish and it was not good to make an orifice beneath the septum since it generates turbulent jet and eddies. Protrusions on the side wall of fishway were preferable to grooves since they decelerate flow velocity and make upstream migration easy. A vertically movable septum was necessary for a flushing of deposited bed material, and net installing over fishway was also needed for birds not to approach the fishway and eat fish.
This study analyzed the hydrodynamic flow behavior on a standard ogee spillway with pier by using FLOW-3D. The simulation results were compared with the experiment data of U.S. Army Corps of Engineers - Waterways Experiment Station (WES) and also compared with 2-dimensional simulation results on a spillway without pier. In particular, the characteristics of the distribution of the overflow nappe and pressure in a spillway with pier were investigated in detail. As for the results of the simulation on the flow rate, overflow nappe, and pressure, although there were a few differences in the experiment results of WES, they were identical in most cases in terms of trend. Summarizing the major flow behavior in a standard ogee spillway with pier, first, the water stage at the center line of the bay was higher than that at the side of the bay along the pier. Second, when the water head was larger than the design head of the spillway, at the upstream area of the weir crest, the absolute magnitude of negative pressure occurred highest at the side of the bay along the pier. On the other hand, at the downstream area of the weir crest, the absolute magnitude of negative pressure occurred highest at the centerline of the bay.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.