• Title/Summary/Keyword: Shut Down system

Search Result 138, Processing Time 0.035 seconds

Safety Schematic Diagram and Sequence of Heater in FPD Wet Equipment (FPD 장비 습식공정에서의 안전한 히터 공급 계통도 및 제어 회로)

  • Yoo, Heung-Ryol;Son, Yung-Deug
    • Journal of IKEEE
    • /
    • v.23 no.1
    • /
    • pp.107-111
    • /
    • 2019
  • In FPD WET equipment, heaters are used a lot. There are many electric accidents caused by short circuit and overheating due to the use of heater, so it is necessary to have a safe electric system and interlock. Therefore, in this paper, we propose an electrical schematic and interlock for FPD WET equipment. In this paper, a hardware interlock such as a level sensor, an overheat protector, and an SSR heater sink is inserted, and the electric system is composed of ELB - MC - SSR - EOCR - heater. When the interlock occurs, the magnetic contactor (MC) is turned off and the power of the heater is cut off.EOCR, an electric overcurrent protection device, has an interlock to shut down the MC when there is an abnormality in the heater while checking the overcurrent, undercurrent and disconnection. These circuit configurations and interlocks are likely to be useful not only for WET equipment but also for any equipment in which the heater is placed.

Building Bearing Fault Detection Dataset For Smart Manufacturing (스마트 제조를 위한 베어링 결함 예지 정비 데이터셋 구축)

  • Kim, Yun-Su;Bae, Seo-Han;Seok, Jong-Won
    • Journal of IKEEE
    • /
    • v.26 no.3
    • /
    • pp.488-493
    • /
    • 2022
  • In manufacturing sites, bearing fault in eletrically driven motors cause the entire system to shut down. Stopping the operation of this environment causes huge losses in time and money. The reason of this bearing defects can be various factors such as wear due to continuous contact of rotating elements, excessive load addition, and operating environment. In this paper, a motor driving environment is created which is similar to the domestic manufacturing sites. In addition, based on the established environment, we propose a dataset for bearing fault detection by collecting changes in vibration characteristics that vary depending on normal and defective conditions. The sensor used to collect the vibration characteristics is Microphone G.R.A.S. 40PH-10. We used various machine learning models to build a prototype bearing fault detection system trained on the proposed dataset. As the result, based on the deep neural network model, it shows high accuracy performance of 92.3% in the time domain and 98.3% in the frequency domain.

Prediction of fatigue crack initiation life in SA312 Type 304LN austenitic stainless steel straight pipes with notch

  • Murthy, A. Ramachandra;Vishnuvardhan, S.;Anjusha, K.V.;Gandhi, P.;Singh, P.K.
    • Nuclear Engineering and Technology
    • /
    • v.54 no.5
    • /
    • pp.1588-1596
    • /
    • 2022
  • In the nuclear power plants, stainless steel is widely used for fabrication of various components such as piping and pipe fittings. These piping components are subjected to cyclic loading due to start up and shut down of the nuclear power plants. The application of cyclic loading may lead to initiation of crack at stress raiser locations such as nozzle to piping connection, crown of piping bends etc. of the piping system. Crack initiation can also take place from the flaws which have gone unnoticed during manufacturing. Therefore, prediction of crack initiation life would help in decision making with respect to plant operational life. The primary objective of the present study is to compile various analytical models to predict the crack initiation life of the pipes with notch. Here notch simulates the stress raisers in the piping system. As a part of the study, Coffin-Manson equations have been benchmarked to predict the crack initiation life of pipe with notch. Analytical models proposed by Zheng et al. [1], Singh et al. [2], Yang Dong et al. [25], Masayuki et al. [33] and Liu et al. [3] were compiled to predict the crack initiation life of SA312 Type 304LN stainless steel pipe with notch under fatigue loading. Tensile and low cycle fatigue properties were evaluated for the same lot of SA312 Type 304LN stainless steel as that of pipe test. The predicted crack initiation lives by different models were compared with the experimental results of three pipes under different frequencies and loading conditions. It was observed that the predicted crack initiation life is in very good agreement with experimental results with maximum difference of ±10.0%.

Social Distancing and Public Health Guidelines at Workplaces in Korea: Responses to Coronavirus Disease-19

  • Kim, Eun-A
    • Safety and Health at Work
    • /
    • v.11 no.3
    • /
    • pp.275-283
    • /
    • 2020
  • Background: In the absence of a vaccine or treatment, the most pragmatic strategies against an infectious disease pandemic are extensive early detection testing and social distancing. This study aimed to summarize public and workplace responses to Coronavirus Disease-19 (COVID-19) and show how the Korean system has operated during the COVID-19 pandemic. Method: Daily briefings from the Korean Center for Disease Control and the Central Disaster Management Headquarters were assembled from January 20 to May 15, 2020. Results: By May 15, 2020, 11,018 COVID-19 cases were identified, of which 15.7% occurred in workplaces such as health-care facilities, call centers, sports clubs, coin karaoke, and nightlife destinations. When the first confirmed case was diagnosed, the Korean Center for Disease Control and Central Disaster Management Headquarters responded quickly, emphasizing early detection with numerous tests and a social distancing policy. This slowed the spread of infection without intensive containment, shut down, or mitigation interventions. After entering the public health blue alert level, a business continuity plan was distributed. After entering the orange level, the Ministry of Employment and Labor developed workplace guidelines for COVID-19 consisting of social distancing, flexible working schedules, early identification of workers with suspected infections, and disinfection of workplaces. Owing to the intensive workplace social distancing policy, workplaces remained safe with only small sporadic group infections. Conclusion: The workplace social distancing policy with timely implementation of specific guidelines was a key to preventing a large outbreak of COVID-19 in Korean workplaces. However, sporadic incidents of COVID-19 are still ongoing, and risk assessment in vulnerable workplaces should be continued.

5G service and universal service (5G시대 통신서비스의 공익성 제고 방안에 대한 모색)

  • Kim, Sung-Wook
    • Journal of Digital Convergence
    • /
    • v.18 no.2
    • /
    • pp.103-110
    • /
    • 2020
  • The fire incident of KT's Ahyun branch occurred last year indicates that hyper-connected society led by 5G technology would be a dystopia instead of a utopia unless seamless connection of 5G service is well secured. Looking backward on 1999, we could peacefully and happily greet the new millennium by making a great effort to prevent the millennium bugs(Y2K) from causing the catastrophe such as a shut-down of banking system. Likewise, we should make a great effort to keep 5G networks and 5G service continuously working without the disruption of even just a second, which would enable us to avoid facing any catastrophes caused by the disruption of 5G service. As a way to do so, it can be considered that 5G service is designated as universal service because it has the key features of public goods like telephone and high-speed internet services.

Open Switch Fault Tolerance Control of Active NPC Inverters With HF/LF Modulation (HF/LF 변조를 적용한 Active NPC 인버터의 개방 고장 허용 제어)

  • Jung, Won Seok;Kim, Ye-Ji;Kim, Seok-Min;Lee, Kyo-Beum
    • Journal of IKEEE
    • /
    • v.24 no.1
    • /
    • pp.170-177
    • /
    • 2020
  • This paper presents an open-fault tolerance control method for active neutral point clamped (ANPC) inverter with high frequency/low frequency (HF/LF) modulation. By applying the ANPC inverter with SiC MOSFETs and Si IGBTs, the system efficiency and performance can be improved compared to a Si-based inverter. HF/LF modulation is used for a megawatt-scale inverter to minimize the commutation loop. The open-switch failure in megawatt-scale inverter causes severe damage to load and huge expenses when the inverter has been shut-down. The proposed tolerance control of open-switch failure provides continuous operation and improved reliability to the ANPC inverter. The effectiveness of the proposed fault tolerance control is verified by simulation results.

A Simulation Method of PID Tuning with Process Modeling in Operating Nuclear Power Plants (가동원전에서 공정모델링을 통한 PID 튜닝 시뮬레이션 방법)

  • Min, Moon-Gi;Jung, Chang-Gyu;Lee, Kwang-Hyun;Lee, Jae-Ki;Kim, Hee-Je
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.290-294
    • /
    • 2014
  • PID(Proportional, Integral, Derivative) controller is the most popular process controllers in nuclear power plants. The optimized parameter setting of the process controller contributes to the stable operation and the efficiency of the operating nuclear power plants. PID parameter setting is tuned when new process control systems are installed or current process control systems are changed. When the nuclear plant is shut down, a lot of PID tuning methods such as the Trial and Error method, Ultimate Oscillation method operation, Ziegler-Nichols method, frequency method are used to tune the PID values. But inadequate PID parameter setting can be the cause of the unstable process of the operating nuclear power plant. Therefore the results of PID parameter setting should be simulated, optimized and finally verified. This paper introduces the simulation method of PID tuning to optimize the PID parameter setting and confirms them of the actual PID controller in the operating nuclear power plants. The simulation method provides the accurate process modeling and optimized PID parameter setting of the multi-loop control process in particular.

Smart Battery System of Lithium ion Batteries (리튬이온전지의 Smart Battery System)

  • Kim Hyun-Soo;Moon Seong-In;Yun Mun-Soo;Ko Beyng-Hi;Park Sang-Kun;Shin Dong-O;Yoo Seong-Mo;Lee Seung-Ho
    • Journal of the Korean Electrochemical Society
    • /
    • v.4 no.3
    • /
    • pp.132-137
    • /
    • 2001
  • Recently, the demand for notebook PC with lithium ion batteries has steadily increased and consumers require them to adopt a SBP(smart battery pack) able to predict the remaining capacity and the run time of batteries precisely. The SBP is composed of a protection If, by which safety of lithium ion batteries is maintained against overcharge, overdischarge and overcurrent, and a smart IC, which calculates the remaining capacity and the remaining run time. The protection IC shut abmormal current down by using overcharge/overdischarge FET. A SBS(smart battery system) is composed of a system host, a smart battery and a smart battery charger. The smart ICs for SBP will be required to provide a low cost, low current consumption and small size. There will need to develop a microcomputer control type IC and an optimum algorism which is able to predict the residual capacity and the residual run time precisely. SBS will apply to many kinds of industry fields such as an electric bicycle, an electric vehicle, a load levelling and a military.

A Study on the Implementation and Modeling of 20kW Scale ESS Load Test Device for Emergency Generator (소방용 비상발전기의 현장부하시험을 위한 20 kW급 ESS 부하시험장치 모델링과 구현에 관한 연구)

  • Choi, Seung-Kyou;Lee, Hu-Dong;Choi, Sung-Sik;Ferreira, Marito;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.541-550
    • /
    • 2019
  • An emergency generator is key equipment for fire-fighting to supply power to fire-fighting facilities, which protect property and people in cases of fire accidents. A rated load test for emergency generators must be carried out by connecting an emergency load to the generator in accordance with related regulations. However, a no-load test has been performed for emergency generators in general since serious problems can occur when the main power is cut off, including the damage of customer devices and shut down of critical loads. Therefore, this paper proposes a load test method for an emergency generator using energy storage system (ESS) without the interruption of main power. The emergency power system was also modeled based on PSCAD/EMTDC software, and a 200-kW scale ESS load test device was implemented. The simulation and test results show that the load test method is useful and practical for an emergency power supply system.

Experimental Study on the Diagnosis and Failure Prediction for Long-term Performance of ESP to Optimize Operation in Oil and Gas Wells (유·가스정 최적 운영을 위한 ESP의 장기 성능 진단 및 고장 예측 실험 연구)

  • Sung-Jea Lee;Jun-Ho Choi;Jeong-Hwan Lee
    • Journal of the Korean Institute of Gas
    • /
    • v.27 no.2
    • /
    • pp.71-78
    • /
    • 2023
  • In general, electric submersible pumps (ESPs), which have an average life of 1.0 to 1.5 years, experience a decrease in performance and a reduction in life of the pump depending on oil and gas reservoir characteristics and operating conditions in wells. As the result, the failure of ESP causes high well workover costs due to retrieval and installation, and additional costs due to shut down. In this study, a flow loop system was designed and established to predict the life of ESP in long­term operation of oil and gas wells, and the life cycle data of ESP from the time of installation to the time of failure was acquired and analyzed. Among the data acquired from the system, flow rate, inlet and outlet temperature and pressure, and the data of the vibrator installed on the outside of ESP were analyzed, and then the performance status according to long-term operation was classified into five stages: normal, advice I, advice II, maintenance, and failed. Through the experiments, it was found that there was a difference in the data trend by stage during the long­term operation of the ESP, and then the condition of the ESP was diagnosed and the failure of the pump was predicted according to the operating time. The results derived from this study can be used to develop a failure prediction program and data analysis algorithm for monitoring the condition of ESPs operated in oil and gas wells.