• Title/Summary/Keyword: Short supply

Search Result 729, Processing Time 0.026 seconds

A Study on Retraining for Career Development of Information Security Workforce (정보보호 업무인력의 경력개발을 위한 재교육 방향)

  • Jun, Hyo-Jung;Kim, Tae-Sung
    • Journal of Information Technology Applications and Management
    • /
    • v.25 no.4
    • /
    • pp.67-77
    • /
    • 2018
  • With the types and targets of cyber attacks expanding and with personal information leaks increasing, the quantitative demand for information security specialists has increased. The base for training the workforce has expanded accordingly, but joblessness and job-seeking still coexist. To resolve the gap between labor demand and supply, education and training systems that can supply demand quickly are needed. It takes a considerable amount of time for information security education and new manpower supply through universities and graduate schools to be reflected in the market. However, if information security retraining is carried out in terms of career development of information security and related workforce, the problem of lack of experts could be solved in a relatively short period. This paper investigates and analyzes the information security work of the information security workforce, the degree of skill level, the need for retraining, and the workplace migration experience; it also discusses the direction of career development retraining.

A Study on the Back Bead control by Using Short Circuit Frequency in GMA Welding of Sheet Metal (박판 GMA 용접에서 단락 주파수를 이용한 이면비드의 제어에 관한 연구)

  • 안재현;김재웅
    • Journal of Welding and Joining
    • /
    • v.13 no.4
    • /
    • pp.75-84
    • /
    • 1995
  • In GMA welding of sheet metal, the short circuit metal transfer mdoe is preferred because of its low heat input and capability of bridging the root gap. The molten electrode is transferred to the workpiece during repectitive short circuit in the model. The waveform of welding current or voltage and the frequency of short circuiting are affected by a number of factors including: magnitude of welding current and voltage, root gap, electrode extension, power supply characteristics, and so on. In this study experimental models were proposed, which are able to determine the relationship between the root gap and short circuit frequency and the relationship between the root gap and appropriate welding speed that produces the good quality of back bead without burn through. Using the experimental models, the root gap can be obtained from measuring the short circuit frequency, and then the appropriate weldig speed to the root gap can be determined. Thus a back bead control system was constructed by controlling the welding speed for maintaining the quality of back bead. The developed system has shown the successful capability of back bead control.

  • PDF

A Study on the Short-Term Demand Forecasing System of the Construction Materials for Concrete (콘크리트용 건설자재의 단기수요 예측모형에 관한 연구)

  • 최민수;김무한
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1991.10a
    • /
    • pp.146-151
    • /
    • 1991
  • In recent years a reasonable supply and demand plan of construction materials which is based upon an accurate forecast has been greatly required to prevent construction works from delaying and slapdash. To meet an above requirement, a short-term forecasting system of construction materials, in this paper, is established, which is approached in engineering aspect and emerged from conventional forecasting systems. The major considerations in setting up this system are the distributed lag of consrection business indicators and seasonal variations in consumption of constuction materials.

  • PDF

A Heuristic for Vendor-managed Inventory/Distribution Problems in the Retail Supply Chain (소매점 공급사슬에서 공급자주도 재고/분배 문제를 위한 발견적 해석)

  • Hong, Sung-Chul;Park, Yang-Byung
    • Korean Management Science Review
    • /
    • v.25 no.1
    • /
    • pp.107-121
    • /
    • 2008
  • As to more efficiently manage the inventory in the retail supply chain and to meet the customer demand in a timely manner, vendor-managed inventory (VMI) has been widely accepted, which manages inventory in the retail supply chain via sharing information and collaborating with the retailers. Applying VMI generates vendor-managed inventory/distribution problem (VMIDP), which involves inventory management for both the vendor and the retailers, and the design of vehicle routes for delivery, to minimize the total operating cost in the supply chain. In this paper, we suggest a mixed integer programming (MIP) model to obtain the optimal solution for VMIDP in a two-echelon retail supply chain, and develop an efficient heuristic based on the operating principles of the MIP model. To evaluate the performance of the heuristic, its solution was compared with the one of the MIP model on a total of twenty seven test problems. As a result, the heuristic found optimal solutions on seven problems in a significantly reduced time, and generated a 4.3% error rate of total cost in average for all problems. The heuristic is applied to the case problem of the local famous franchise company together with GIS, showing that it is capable of providing a solution efficiently in a relatively short time even in the real world situation.

Dynamics of Crude Oil and Real Exchange Rate in India

  • ALAM, Md. Shabbir;UDDIN, Mohammed Ahmar;JAMIL, Syed Ahsan
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.12
    • /
    • pp.123-129
    • /
    • 2020
  • This scholarly work is an effort to capture the effects of oil prices on the actual exchange rate between dollar and rupee. This is done with reference to the U.S. dollar as oil prices are marked in USD (U.S. Dollar) in the international market, and India is among the top five importers of oil. Using monthly data from January 2001 to May 2020. The study used the real GDP, money supply, short-term interest rate difference between two countries, and inflation apart from the crude oil prices per barrel as the factors that help define the exchange rate. The analysis, through cointegration and vector error correction method (VECM), suggests long and short-run causality amid prices of oil and the rate of exchange fluctuations. Oil prices are found to be negatively related to the exchange rate in the long term but positively related in the short term. The result of the Wald test also indicates the short-run causation from the short-term interest rate and the prices of crude oil towards the exchange rate. The present study shows that oil prices are evidence of the existence of short-term and long-term driving associations with short-term interest rates and exchange rates.

Short Stature and Growth Hormone Therapy (저신장 소아를 위한 성장호르몬 치료)

  • Park, Yong-Hoon
    • Journal of Yeungnam Medical Science
    • /
    • v.22 no.1
    • /
    • pp.1-12
    • /
    • 2005
  • Normal growth and development is of prime concern during childhood. The treatment of children with growth hormone deficiency has been revolutionized by growth hormone therapy. An improved height outcome with a final height within the target height range has been achieved. However, close follow-up with regular clinical and laboratory monitoring is essential for achieving the desirable height outcome. The theoretical unlimited supply of growth hormone has led to its wide spread use in a variety of disorders other than a growth hormone deficiency. Initially used in children with Turner syndrome, growth hormone is now used to treat chronic renal failure, an idiopathic short stature and intrauterine growth restrictions in addition to a wide array of newly emerging indications. This review summarizes the basics for a proper growth assessment, the differentiation of normal and abnormal growth causes of a short stature, and the indications for growth hormone treatment.

  • PDF

The Study on Countermeasures of Electromagnetic Force by Three Phase Short-Circuit Test of Underground Transmission Cable (송전케이블 삼상단락 실증시험을 통한 전자력 대책방안 연구)

  • Kang, Ji-Won;Park, Hung-Sok;Yoon, Jong-Keon;Kim, Yang-Sang;Hong, Dong-Suk;Chang, Woo-Seog
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.12
    • /
    • pp.2342-2348
    • /
    • 2009
  • Even though underground transmission cable is an essential transmission method to supply stable power for downtown and population center, the interaction of electromagnetic force by fault current is very large comparing to overhead transmission line due to restricted installation space such as tunnel, and close consideration is required for it. This paper presents countermeasures to reduce and release the effect of electromagnetic force with rope binding and installation of spacer and describes its efficacy through three phase short-circuit test, which will be utilized as basic materials for improvement and development of cleat, hanger, etc. to reduce and release effect of electromagnetic force in the future.

A Study on the Architectural Planning of the Short-Stay Care Facilities for the Elderly (노인단기보호시설의 건축계획에 관한 연구)

  • Park, Sung-Jea;Yu, Young-Min
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.6 no.10
    • /
    • pp.31-40
    • /
    • 2000
  • Facing the aging society in Korea, the supply of elderly care services has to be increased. Among these services short-stay care service is one of the alternative service connecting home and communities and this service is at the beginning stage in Korea. This paper aims to identify the current status and characteristics of short-stay care facilities in Korea. On the bases of survey and analysis the basic data for architectural planning and design of short-stay care facilities for elderly have been proposed.

  • PDF

The Impact of the Supply Regulation on the Price in Farming Olive Flounder (출하량 조절이 양식 넙치가격에 미치는 영향)

  • Kang, Seokkyu
    • Environmental and Resource Economics Review
    • /
    • v.24 no.4
    • /
    • pp.709-725
    • /
    • 2015
  • This study is to analyse the relationship between the price and the supply in the farming Olive Flounder's production area market. The data used in this study correspond to daily price and supply quantity covering time period from January 1, 2007 to June 30. 2013. The analysis methods of cointegration and vector error correction model are employed. The empirical results of this study are summarized as follows: First, the price and the supply follow random walks and they are integrated of order 1. Second, the price and the supply are cointegrated. Third, vector error correction model suggests that the relationship between the price change ration and the supply quantity change ratio has negative and feedback effect exists in the long-run, but the disequilibrium between the price and the supply is corrected by the supply quantity. Finally, vector error correction model suggests that the supply quantity leads the price in the short-run. This indicates that the decrease(increase) of the supply quantity results in the increase(decrease) of the price.

THE ANALYSIS OF PSM (POWER SUPPLY MODULE) FOR MULTI-SPECTRAL CAMERA IN KOMPSAT

  • Park Jong-Euk;Kong Jong-Pil;Heo Haeng-Pal;Kim Young Sun;Chang Young Jun
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.493-496
    • /
    • 2005
  • The PMU (Payload Management Unit) in MSC (Multi-Spectral Camera) is the main subsystem for the management, control and power supply of the MSC payload operation. The PMU shall handle the communication with the BUS (Spacecraft) OBC (On Board Computer) for the command, the telemetry and the communications with the various MSC units. The PMU will perform that distributes power to the various MSC units, collects the telemetry reports from MSC units, performs thermal control of the EOS (Electro-Optical Subsystem), performs the NUC (Non-Uniformity Correction) function of the raw imagery data, and rearranges the pixel data and output it to the DCSU (Data Compression and Storage Unit). The BUS provides high voltage to the MSC. The PMU is connected to primary and redundant BUS power and distributes the high unregulated primary voltages for all MSC sub-units. The PSM (Power Supply Module) is an assembly in the PMU implements the interface between several channels on the input. The bus switches are used to prevent a single point system failure. Such a failure could need the PSS (Power Supply System) requirement to combine the two PSM boards' bus outputs in a wired-OR configuration. In such a configuration if one of the boards' output gets shorted to ground then the entire bus could fail thereby causing the entire MSC to fail. To prevent such a short from pulling down the system, the switch could be opened and disconnect the short from the bus. This switch operation is controlled by the BUS.

  • PDF