• 제목/요약/키워드: Short Faults

검색결과 206건 처리시간 0.027초

풍력발전시스템이 연계된 계통의 과도상태해석 (Transient State Analysis of Network Connected to Wind Generation System)

  • 김세호
    • 한국태양에너지학회 논문집
    • /
    • 제23권3호
    • /
    • pp.29-35
    • /
    • 2003
  • Generator for wind power can be either synchronous or asynchronous (induction) types. Induction and synchronous generators behave in a different way when subjected to severe faults. Induction generators does not have an angle stability limit and short circuit in the neighborhood of an Induction generator causes the demagnetization of the machine when the fault is cleared, the voltage raises slowly, while the grid contributes with reactive power to the generator and the magnetic flux recovers. On the other hand in the synchronous generators the recovery of the voltage is immediate, since the excitation of the rotor angle comes from an independent circuit. This paper shows the result of the transient state analysis in the network connected to wind generation system Several case studies have been conducted to determine the effect of the clearing time of a fault on the network stability. It has been found that the critical clearing time can be as low as 61ms in the case of induction generator compared to 370ms in the case of synchronous generator.

자연공원 내 비오톱조성을 통한 자연학습공간 개선방안 - 전라북도를 사례로 - (An Improvement Proposal for Nature-learning Places in Natural Parks with the Concept of Biotope - A Case Study of the Natural Parks of Chollabukdo -)

  • 유리수;이명우
    • 한국조경학회지
    • /
    • 제34권5호
    • /
    • pp.59-69
    • /
    • 2006
  • Nature-learning place is a critical space together with nature center in Natural parks. But there are serious faults on these design and planning as for the landscape ecological consideration. The objective of this paper was to suggest the ecological alternatives through analyzing existing cases of nature-teaming place in Natural parte. Five case sites in Natural parks were selected in Chollabukdo. Three landscape indices- subjectivity, natural prototype, nativity, were introduced for evaluating the existing cases. Results showed that those are short of landscape ecological senses- Biotope target species, ecological vegetation patches, eco-corridor concept. A proposal for the ecological planning in Deokyusan Natural park was suggested according to several criteria with biotopes as forest and stream patches and the corridor. The results of the study can be summarized as follows. First, existing natural-loaming sites should be evaluated in light of landscape ecological indices. Second, they can be designed to work with the concept of the biotope patch and corridor for target species. The results of this study could provide critical guidelines for the ecological planning and design of natural-loaming sites in nature parks.

CMOS 조합회로의 IDDQ 테스트패턴 생성 (IDDQ Test Pattern Generation in CMOS Circuits)

  • 김강철;송근호;한석붕
    • 한국정보통신학회논문지
    • /
    • 제3권1호
    • /
    • pp.235-244
    • /
    • 1999
  • 본 논문에서는 새로운 동적 컴팩션(dynamic compaction) 알고리즘을 제안하고 이용하여 CMOS 디지털 회로의 IDDQ 테스트패턴 생성한다. 제안된 알고리즘은 프리미티브 게이트 내부에서 발생하는 GOS, 브리징 고장을 검출할 수 있는 프리미티브 고장패턴을 이용하여 초기 테스트패턴을 구하고, 초기 테스트패턴에 있을 수 있는 don't care(X)의 수를 줄여 테스트 패턴의 수를 감소시킨다. 그리고 난수와 4 가지 제어도(controllability)를 사용하여 백트레이스를 수행시키는 방법을 제안한다. ISCAS-85 벤치마크 회로를 사용하여 모의 실험한 결과 큰 회로에서 기존의 정적 컴팩션 알고리즘에 비하여 45% 이상 테스트패턴 수가 감소함을 확인하였다.

  • PDF

PMSG 적용 가변속 계통연계형 풍력발전 시스템의 통합 시뮬레이션 및 스위치 개방고장 진단기법 연구 (A Study on the Integrated Simulation and Condition Monitoring Scheme for a PMSG-Based Variable Speed Grid-Connected Wind Turbine System under Fault Conditions)

  • 김경화;송화창;최병욱
    • 조명전기설비학회논문지
    • /
    • 제27권3호
    • /
    • pp.65-78
    • /
    • 2013
  • To analyze influences under open fault conditions in switching devices, an integrated simulation and condition monitoring scheme for a permanent magnet synchronous generator (PMSG) based variable speed grid-connected wind turbine system are presented. Among various faults in power electronics components, the open fault in switching devices may arise when the switches are destructed by an accidental over current, or a fuse for short protection is blown out. Under such a faulty condition, the grid-side inverter as well as the generator-side converter does not operate normally, producing an increase of current harmonics, and a reduction in output and efficiency. As an effective way for a condition monitoring of generation system by online basis without requiring any diagnostic apparatus, the estimation schemes for generated voltage, flux linkage, and stator resistance are proposed and the validity of the proposed scheme is proved through comparative simulations.

Lessons learned from recent destructive Van, Turkey earthquakes

  • Yon, Burak;Sayin, Erkut;Calayir, Yusuf;Ulucan, Zulfu Cinar;Karatas, Mehmet;Sahin, Humeyra;Alyamac, Kursat Esat;Bildik, Abdullah Tevfik
    • Earthquakes and Structures
    • /
    • 제9권2호
    • /
    • pp.431-453
    • /
    • 2015
  • A destructive earthquake, the magnitude of this earthquake was 7.2, hit Van, Turkey on October 23, 2011. After this devastating earthquake, a moderate earthquake which had 5.7 magnitude on November 9, 2011 occurred in Edremit, Van. These earthquakes caused heavy damages and collapses in many reinforced concrete buildings with loss of lives. In this paper, characteristics of ground motions of these earthquakes were studied and, deficiencies in structural elements and engineering faults such as poor workmanship and quality of construction, soft and weak stories, strong beam-weak column, short column, large overhang, hammering and unconfined gable wall were investigated. According to the observations, it was seen that, low quality of structural materials, lack of engineering services, inappropriate design and construction with insufficient detailing of the structural elements were the main reasons of heavy damages.

전력계통 고장시 계통연계형 태양광발전시스템의 영향분석 (Analysis of the Effect of the Grid-connected Photovoltaic System in Fault Case of Power System)

  • 박성훈;이용식;정성원;김재현
    • 한국태양에너지학회 논문집
    • /
    • 제39권4호
    • /
    • pp.69-77
    • /
    • 2019
  • Among the main functions of the grid-connected photovoltaic (PV) system, the anti-islanding operation function is a very important problem. Recently, due to the improvement in power generation efficiency and the maintenance advantages in PV system, the use of string inverter has increased so that the possibility of islanding operation has been raised. Generally, when a power system faults, the PV inverter must be disconnected from power system within 10 cycles by the anti-islanding operation function. However, in the real-time of power system, the output power of the PV system within 10cycles is effected. In this paper, we analyzed the effect of grid-connected PV system on power quality in a short time within 10 cycles on fault case of power system using the Matlab Simulink program.

스페이서 강성과 간격이 송전선 갤러핑에 미치는 영향분석 (Effect Analysis of Spacer Stiffness and Interval on Galloping of Power Transmission Lines)

  • 오윤지;손정현
    • 한국기계가공학회지
    • /
    • 제18권1호
    • /
    • pp.52-58
    • /
    • 2019
  • Due to icing and snow, power transmission lines have asymmetric cross sections, and their motion becomes unstable. At this time, the vibration caused by the wind is called galloping. If galloping is continuous, short circuits or ground faults may occur. It is possible to prevent galloping by installing spacers between transmission lines. In this study, the transmission line is modeled as a mass-spring-damper system by using RecurDyn. To analyze the dynamic behavior of the transmission line, the damping coefficient is derived from the free vibration test of the transmission line and Rayleigh damping theory. The drag and lift coefficient for modeling the wind load are calculated from the flow analysis by using ANSYS Fluent. Galloping simulations according to spacer stiffness and interval are carried out. It is found that when the stiffness is 100 N/m and the interval around the support is dense, the galloping phenomenon is reduced the most.

A Novel Framework Based on CNN-LSTM Neural Network for Prediction of Missing Values in Electricity Consumption Time-Series Datasets

  • Hussain, Syed Nazir;Aziz, Azlan Abd;Hossen, Md. Jakir;Aziz, Nor Azlina Ab;Murthy, G. Ramana;Mustakim, Fajaruddin Bin
    • Journal of Information Processing Systems
    • /
    • 제18권1호
    • /
    • pp.115-129
    • /
    • 2022
  • Adopting Internet of Things (IoT)-based technologies in smart homes helps users analyze home appliances electricity consumption for better overall cost monitoring. The IoT application like smart home system (SHS) could suffer from large missing values gaps due to several factors such as security attacks, sensor faults, or connection errors. In this paper, a novel framework has been proposed to predict large gaps of missing values from the SHS home appliances electricity consumption time-series datasets. The framework follows a series of steps to detect, predict and reconstruct the input time-series datasets of missing values. A hybrid convolutional neural network-long short term memory (CNN-LSTM) neural network used to forecast large missing values gaps. A comparative experiment has been conducted to evaluate the performance of hybrid CNN-LSTM with its single variant CNN and LSTM in forecasting missing values. The experimental results indicate a performance superiority of the CNN-LSTM model over the single CNN and LSTM neural networks.

MCM/PCB 회로패턴 검사에서 SEM의 전자빔을 이용한 측정방법 (Characterization Method for Testing Circuit Patterns on MCM/PCB Modules with Electron Beams of a Scanning Electron Microscope)

  • 김준일;신준균;지용
    • 전자공학회논문지D
    • /
    • 제35D권9호
    • /
    • pp.26-34
    • /
    • 1998
  • 본 논문은 주사전자현미경(SEM)의 전자총을 이용하여 MCM 또는 PCB 회로기판의 신호연결선에서 전압차를 유도시켜 개방/단락 등의 결함을 측정 검사하는 방법을 제시한다. 본 실험에서는 주사전자현미경의 구조를 변형시키지 알고 회로기판의 개방/단락 검사를 실시할 수 있는 이중전위전자빔(Dual Potential) 검사방법을 사용한다. 이중전위전자빔(Dual Potential) 측정검사 방법은 이차전자수율 값 δ의 차이를 유기시키는 δ < 1 인 충전 전자빔과 δ > 1 인 읽기 전자빔을 사용하여 한 개의 전자총이 각각 다른 가속전압에 의해 생성된 두 개의 전자빔으로 측정하는 방법으로 특정 회로네트에 대한 개방/단락 등의 측정 검사가 가능하다. 또한 읽기 전자빔을 이용할 경우 검사한 회로 네트를 방전시킬 수 있어 기판 도체에 유기된 전압차를 없앨 수 있는 방전시험도 실시할 수 있어, 많은 수의 회로네트를 지닌 회로 기판에 대해 측정 검사할 때 충전되어 있는 회로네트에 대한 측정오류를 줄일 수 있다. 측정검사를 실시한 결과 glass-epoxy 회로기판 위에 실장된 구리(Cu) 신호연결선은 7KeV의 충전 전자빔으로 충전시키고 10초 이내에 주사전자현미경을 읽기 모드로 바꾸어 2KeV의 읽기 전자빔으로 구리표면에서의 명암 밝기 차이를 읽어 개방/단락 상태를 검사할 수 있었다. 또한 IC 칩의 Au 패드와 BGA의 Au 도금된 Cu 회로패드를 검사한 결과도 7KeV 충전 전자빔과 2KeV 읽기 전자빔으로 IC칩 내부회로에서의 개방 단락 상태를 쉽게 검사할 수 있었다. 이 검사방법은 주사전자현미경에 있는 한 개의 전자총으로 비파괴적으로 회로 기판의 신호 연결선의 개방/단락 상태를 측정 검사할 수 있음을 보여 주었다.

  • PDF

한국 서해 대륙붕 군산분지 까치-1공의 층서 (Stratigraphy of the Kachi-1 Well, Kunsan Basin, Offshore Western Korea)

  • 유인창;김태훈
    • 자원환경지질
    • /
    • 제40권4호
    • /
    • pp.473-490
    • /
    • 2007
  • 서해 대륙붕 군산분지 까치-1공의 퇴적층을 통합층서적 접근을 통하여 분석하였다. 분석 결과, 까치-1공 내에서 (1)트라이아스기 돌로마이트 기반암층, (2) 후기 쥬라기 말-전기 백악기 초 퇴적층, (3) 전기 백악기 퇴적층, (4) 후기 백악기 퇴적층 및 (5) 중기 마이오세 이후 퇴적층 등 5개의 단위층들이 인지되었다. 각 단위층은 부정합에 의해 경계되는 구조층서 단위층으로 군산분지의 형성, 퇴적 및 변형에 대한 정보를 제공해 준다. 후기 쥬라기 말에 들어와 탄루탄층대를 따라 이차 및 삼차 순위의 주향이동 단층들이 분지되면서 소규모 열개 분지들이 형성되기 시작하였다. 전기 백악기 이후 팔레오세 말까지 지속된 분지단층들의 좌수향 이동에 의해 군산분지는 대규모의 인장력을 받게 되어 소규모 열개 분지들은 대규모의 인리형 분지로 확장되었다. 그러나 팔레오세 말에 시작된 인도판과 유라시아판의 연성충돌에 의한 1차 히말라야 조산운동의 영향으로 탄루단층이 우수향으로 이동을 시작하면서 군산분지는 서서히 변형을 받기 시작하였다. 이후 에오세 중기에 일어났던 인도판과 유라시아판의 강성충돌에 의한 2차 히말라야 조산운동에 의해 탄루단층의 우수향 이동이 본격화되면서 군산분지는 극심한 구조역전의 현상이 일어났다. 따라서 에오세 말과 올리고세 동안 군산분지에서는 심한 구조역전에 의한 분지변형이 일어났다. 올리고세 이후 현재까지, 군산분지는 간헐적인 해침과 함께 광역적인 침강을 유지하면서 안정된 대륙 연변부 침강분지로 전이되었다.