• Title/Summary/Keyword: Ship-building

Search Result 363, Processing Time 0.025 seconds

Comparison of Algorithm based on the Container Remarshalling Efficiency Factor in Port Distribution (항만유통의 컨테이너 재정돈 성능요인에 따른 알고리즘 성능비교)

  • Park, Young-Kyu
    • Journal of Distribution Science
    • /
    • v.14 no.5
    • /
    • pp.107-114
    • /
    • 2016
  • Purpose - Loading can decrease the productivity due to the possibility of carrying out with the opposite order of storage in container terminal. When the container is to be taken out, it is needed to move the container stacked upon the container to be carried out to other place temporarily. It is called as rehandling. Remarshalling, with the loading plan, is the arranging the containers before the ship arrives in order to avoid the rehandling during the carrying out. The present study tried to find out the factors affecting the efficiency when building the remarshalling plan with the utilization of neighboring storage space as a outer slot, and analyzed the efficiency of several remarshalling algorithms with the combination of those factors. Research design, data and methodology - The present study used, when the remarshalling plan is prepared for utilizing the outer slot, the simulation methods in order to compare the efficiency of the remarshalling algorithms which made with the factors affecting the efficiency. The factors affecting the efficiency are the method of making the child node, method of arrangement, and possibility of application of FIX. In order to analyze the affecting factors on the efficiency, several algorithms are prepared with the combination of production of the child node and the arrangement method with the availability of FIX application. With this algorithm, the effect of the factors on the efficiency after building up of remarshalling plan with the target on the bay with 10 rows, 8 columns, and 10 indices. Results - The method of rearrangement and making of a child node as the factor affecting the efficiency of remarshalling utilization of the outer bay were studied. It is efficient to combine the method of making a child node with MCS in order to reduce the number of moving the containers. For reducing the time in carrying out, it was found that all arrangement methods should be combined with RCS for the efficiency. The result of experiment shows the application of FIX with good result in case of succession ratio. In addition, when FIX was not applied, all of the most combinations resulted in short time in remarshalling. As a result, it can be concluded that the algorithm with proper combination of making the child node and the arrangement can increase the job efficiency based on the importance. Conclusion - The present study suggested and analyzed the algorithms with the combination of the arrangement method, the making of child node, and FIX. It is needed to develop the algorithm to judge the possibility whether the best remarshalling plan can be built or not within the bay in order to find a better method between the two cases such as within the bay and outer the bay. As a method for extending the study on the factors affecting the efficiency, it is possible to find out the way to build the remarshalling plan within the permitted time under any storage situation.

Chang in the Small Boat Building Industry: the Case of the Lake Washington Ship Canal (소규모 boat공업의 입지에 관한 연구 : Seattle 의 Washington 운하지역의 경우)

  • Lim, Yeong Dae
    • Journal of the Korean Geographical Society
    • /
    • v.24
    • /
    • pp.1-18
    • /
    • 1981
  • 본 연구는 미국에서 boat공업의 중심지 중의 하나인 Seattle의 boat 공업의 입지와 그 변화를 고찰하므로서 소기업의 입지를 구명하려고 하였다. 본 연구에서는 먼저 Seattle에서 소규모 boat제조업체가 가장 많이 집중한 Washington호와 Shilshole 만간의 운하지역을 연구지역으로 선정하려 이 지역내에 입지하고 있는 boat 제조업체의 기업주와 interview한 결과를 기본자료로 이용하였다. 이상에서 얻어진 결과는 다음과 같았다. 연구지역의 소규모 boat 공업은 boat제조에 흥미와 능력을 가진 기업가들이 boat 공업에 유리한 Seattle의 환경의 영향을 받아 그들의 기업을 그들의 오랜 거주 지역에서 시작하므로서 발생하게 되었다. 그러나 담수를 지향하는 이 공업의 입지상의 특색, 원료공급처와 제품판매처의 위치, 주위의 지형 그리고 지방정부의 정책에 기인하여 이 공업은 Chittenden Locks와 Portage 만간의 운하지역에 그 입지가 국한되었다. 다시 이 지역내에서는 주위의 지형과 토지이용, 기업의 재정적인 능력 때문에 이 운하지역에 연해있는 기존공장 혹은 건물을 이용하여 입지하게 되었다. 입지후에 이 공업은 원료공급처와 제품판매처와의 강한 linkage를 형성하고 있다. 더구나 원료공급처의 희소성에 기인한 공간적 독점과 소비자 및 제품의 특성 때문에 연구지역의 대부분의 소규모 boat 제조업체는 바로 근처에 있는 원료공급처 및 소비자와 긴밀한 contact를 하고 있고 이러한 contact를 통하여 그들의 입지를 존속시키고 있다. 한편 Seattle 이 가지고 있는 boat 공업에 유리한 기업환경의 덕택으로 이들 소규모 boat 제조업체들은 수요의 계절적인 변동에서 초래되는 노동력의 공급 때문에 곤란을 받을 뿐 장기적인 불황에 직면한 적은 없다. 이리하여 이들 업체들은 이러한 계절적인 변동에 대처하기 위해 생산 input 의 조절, 주위의 기존공장이나 건물의 병합을 통한 연속적인 확장 혹은 그들의 action space 내에 있는 기존공장이나 건물을 이용한 이동등과 같은 입지변화를 보여왔을 뿐이다. 이리하여 연구지역의 소규모 boat공업은 Seattle의 경제 system 내의 주요 subsystem의 하나로서 활발히 움직이고 있다. 그러나 만약 기업의 외부환경에서 초래되는 stress, 즉 주민의 소득저하, 타 recreation 산업이 쇠퇴하게 되면 이 공업 또한 쇠퇴될 것이다. 요컨대 담수 지향성과 관련된 입지상의 특색을 제외하고는 연구지역의 소규모 boat 공업은 타 소규모 공업과 동일한 입지상의 특색을 가지고 있다.

  • PDF

A Study on method of load attribute for Spatial Scheduling (공간일정계획에서의 부하조정을 위한 방법론 연구)

  • Back Dong-Sik;Yoon Duck-Young;Kwak Hyun Ho
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.96-100
    • /
    • 2004
  • In the ship building industry various problems of erection is counterfeited due to formation of bottle necks in the block erection flow pattern This kind of problems cause accumulated problems in real-time erection right on the floor, When such a problem is approached, a support data of the entire erection sequence should be available, Here planning is done by reasoning about the future events in order to verify the existence of a reasonable series of actions to accomplish a goal. This technique helps in achieving benefits like handling search complications, in resolving goal conflicts and anticipation of bottleneck formation well in advance to take necessary countermeasures and boosts the decision support system, The data is being evaluated and an anticipatory function is to be developed This function is quite relevant in day to day planning operation. The system updates database with rearrangement of off-critical blocks in the erection sequence diagram, As a result of such a system, planners can foresee months ahead and can effectively make decisions regarding the control of loads on the man, machine and work flow pattern, culminating to an efficient load management. Such a foreseeing concept helps us in eliminating backtracking related adjustment which is less efficient compared to the look-ahead concept. An attempt is made to develop a computer program to update the database of block arrangement pattern based on heuristic formulation.

  • PDF

A Study on Spatial Scheduling in the P.E. Stage (선행 탑재장에서의 공간일정계획에 관안 연구)

  • Koo Chung-kon;Yoon Duck-Young;Bae Tae-Kyu;Cho Min-Ch
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.61-66
    • /
    • 2004
  • In this paper an effort is made to develop an innovative spatial arrangement concept pertaining to ship building industry. The spatial scheduling is the problem that concentrates on effective planning of available space and arrangements of blocks and in a priority manner. In order to create an effective spatial scheduling. a database providing the priority has to be available to make the erection sequence. Such a system works hand in hand with erection sequence generator program The erection sequence program works on the conventional network analysis method which uses a typical parent-children idea for the calculation of the ENT(possible earliest network start time) and LNT(possible latest network start time). This program works in a cyclic manner taking turns by calculating the ENT in upward trace and LNT on the return trace thereby generating the entire erection sequence diagram for the requisite problem The generated database serves as an input data for spatial scheduling problem. When the system works it takes into consideration the entire system based on heuristic concepts as mentioned. There system uses the spatial aspects such as the available area of the P. E area and plan area of the corresponding blocks and its priority of erection from the erection sequence generator program develops the spatial scheduling arrangement. In this paper using all these concepts an innovative spatial schedule development system developed.

  • PDF

Development of Furan Mold Design and Machining System for Marine Propeller Casting (선박용 프로펠러 후란주형 설계 및 가공 시스템 개발)

  • Park, Jung Whan;Jung, Chang Wook;Kwon, Yong Seop;Kang, Sung Pil
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.40 no.1
    • /
    • pp.121-128
    • /
    • 2016
  • A furan mold design and machining system for marine propeller casting was developed. In general, a large marine propeller is produced by casting in a foundry, where the upper and lower molds are constructed of cement or other materials like furan. Then, the cast workpiece is machined and manually ground. Currently, furan mold construction requires a series of manual tasks. This introduces a fairly large amount of stock allowances, which require a considerable number of man-hours for later machining and grinding, and also increase the work processes. A mold design and off-line robot programming software tool with a six-axis robot hardware system was developed to enhance the shape accuracy and productivity. This system will be applied in a Korean ship building company.

New business opportunity: Green field project with new technology

  • Lee, Seung Jae;Woo, Jong Hun;Shin, Jong Gye
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.6 no.2
    • /
    • pp.471-483
    • /
    • 2014
  • Since 2009 of global financial crisis, shipbuilding industry has undergone hard times seriously. After such a long depression, the latest global shipping market index shows that the economic recovery of global shipbuilding market is underway. Especially, nations with enormous resources are going to increase their productivity or expanding their shipyards to accommodate a large amount of orders expected in the near future. However, few commercial projects have been carried out for the practical shipyard layout designs even though those can be good commercial opportunities for shipbuilding engineers. Shipbuilding starts with a shipyard construction with a large scale investment initially. Shipyard design and the equipment layout problem, which is directly linked to the productivity of ship production, is an important issue in the production planning of mass production of ships. In many cases, shipbuilding yard design has relied on the experience of the internal engineer, resulting in sporadic and poorly organized processes. Consequently, economic losses and the trial and error involved in such a design process are inevitable problems. The starting point of shipyard construction is to design a shipyard layout. Four kinds of engineering parts required for the shipyard layout design and construction. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is used as a foundation of the other engineering parts, and also, determines the shipyard capacity in the shipyard lifecycle. In this paper, the background of shipbuilding industry is explained in terms of engineering works for the recognition of the macro trend. Nextly, preliminary design methods and related case study is introduced briefly by referencing the previous research. Lastly, the designed work of layout design is validated using the computer simulation technology.

Visual Sensor Design and Environment Modeling for Autonomous Mobile Welding Robots (자율 주행 용접 로봇을 위한 시각 센서 개발과 환경 모델링)

  • Kim, Min-Yeong;Jo, Hyeong-Seok;Kim, Jae-Hun
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.8 no.9
    • /
    • pp.776-787
    • /
    • 2002
  • Automation of welding process in shipyards is ultimately necessary, since the welding site is spatially enclosed by floors and girders, and therefore welding operators are exposed to hostile working conditions. To solve this problem, a welding mobile robot that can navigate autonomously within the enclosure has been developed. To achieve the welding task in the closed space, the robotic welding system needs a sensor system for the working environment recognition and the weld seam tracking, and a specially designed environment recognition strategy. In this paper, a three-dimensional laser vision system is developed based on the optical triangulation technology in order to provide robots with 3D work environmental map. Using this sensor system, a spatial filter based on neural network technology is designed for extracting the center of laser stripe, and evaluated in various situations. An environment modeling algorithm structure is proposed and tested, which is composed of the laser scanning module for 3D voxel modeling and the plane reconstruction module for mobile robot localization. Finally, an environmental recognition strategy for welding mobile robot is developed in order to recognize the work environments efficiently. The design of the sensor system, the algorithm for sensing the partially structured environment with plane segments, and the recognition strategy and tactics for sensing the work environment are described and discussed with a series of experiments in detail.

Study on Motion and Mooring Characteristics of Floating Vertical Axis Wind Turbine System (부유식 수직축 풍력발전 시스템의 운동특성 및 계류특성에 대한 연구)

  • Jang, Min-Suk;Jo, Hyo-Jae;Hwang, Jae-Hyuk;Kim, Jae-Heui;Kim, Hyen-Woo
    • Journal of Ocean Engineering and Technology
    • /
    • v.31 no.3
    • /
    • pp.202-207
    • /
    • 2017
  • This paper presents the results of an experimental study on the motions and mooring characteristics of a floating vertical axis wind turbine system. Based on a comparison of regular wave experiment results, the motions of structures with different types of mooring are almost the same. Based on the tension response results of a regular wave experiment with a catenary mooring system, the mooring lines in front of the structure have a larger tension effect than the back of the structure by the drifted offset of the structure. The dynamic response spectrum of the structure in the irregular wave experiments showed no significant differences in response to differences in the mooring system. As a result of the comparison of the tension response spectra, the mooring lines have a larger value with a drifted offset for the structure, as shown in the previous regular wave experiment. The results of the dynamic response of the structure under irregular wave and wind conditions showed that the heave motion response is influenced by the coupled effect with the mooring lines of the surge and pitch motion due to the drifted offset and steady heeling. In addition, the mooring lines in front of the structure have a very large tension force compared to the mooring lines in back of the structure as a result of the drifted offset of the structure.

Drag Coefficient Estimation of Pile Type Structures by Numerical Water Basin Experiments (수조 수치실험에 의한 말뚝구조물의 항력계수 산정)

  • Park, Il-Heum;Lee, Geun-Hyo;Cho, Young-Jun
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.21 no.1
    • /
    • pp.45-53
    • /
    • 2009
  • A possibility of the drag coefficient estimation in numerical water basins was discussed where the numerical solution were calculated by the 3-dimensional hydro-dynamical model (FLOW-$3D^{(R)}$) with the RNG $k-{\varepsilon}$ turbulence model. On the known cases of the drag coefficients for a rectangle, the numerical drag coefficients got $1.34{\sim}1.52$ and the wind tunnel values were $1.3{\sim}1.5$. For a cylinder, the numerical values were calculated as $0.75{\sim}0.78$ in the range of 0.5

Numerical Simulation on Laminar Flow Past a Rotary Oscillating Circular Cylinder (주기 회전하는 원형 실린더 주위 층류 유동장의 수치 시뮬레이션)

  • Park, Jong-Chun;Moon, Jin-Kuk;Chun, Ho-Hwan;Suh, Sung-Bu
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.4 s.142
    • /
    • pp.368-378
    • /
    • 2005
  • The effects of rotary oscillation on the unsteady laminar flow past a circular cylinder. are numerically investigated in the present study. The numerical solutions for the 20 Wavier-Stokes equation are obtained using a finite volume method Tn the framework of an overlapping grid system. The vortex formation behind a circular cylinder and the hydrodynamics of wake flows for different rotary oscillation conditions are analyzed from the results of numerical simulation. The lock-on region is defined as the region that the natural shedding frequency due to the Karmann Vortex shedding and the forcing frequency due to the forced oscillating a cylinder are nearly same, and the quasi-periodic states are observed around that region. At the intersection between lock-on and non-lock-on region the shedding frequency is bifurcated. After the bifurcation, one frequency fellows the forcing frequency($S_f$) and the other returns to the natural shedding frequency($St_0$). in the quasi-periodic states, the variation of magnitudes and relevant phase changes of $C_L$ with forcing phase are examined.