• Title/Summary/Keyword: Shield tunneling method

Search Result 37, Processing Time 0.023 seconds

Exposure Characteristics to Noise Among Tunnel Construction Workers (터널공사현장 근로자의 소음노출 특성 평가)

  • Kim, Kab Bae;Jang, Jae-Kil
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.9
    • /
    • pp.831-840
    • /
    • 2013
  • The noise levels of workers in tunnel sites are likely to be high because tunneling work places are confined space. However, research on the noise exposure levels of tunneling workers have not been performed intensively due to restricted accessibility to tunnel construction sites. The aim of this study is to evaluate the noise exposure levels for workers engaged in tunneling work sites. Noise dosimeters were used for monitoring workers' noise exposure level in 5 tunneling work sites in accordance with the Notification of the Ministry of Labor. Among 5 tunneling work sites, 4 of them used NATM tunneling method and 1 work site used shield TBM tunneling method. The average noise exposure levels of NATM tunneling workers was 81.1 dB(A) and 15.4 % of the workers' noise level were exposed more than 90 dB(A) which is the exposure limit value. In Shield TBM tunneling method, 4.3 % of the workers were exposed more than 90 dB(A) of noise level, the average noise exposure levels of TBM tunneling workers was 84.1 dB(A).

Two-Dimensional Elasto-Viscoplastic Finite Element Analysis Considering Shield Tunneling Construction Stages (실드터널 시공단계를 고려한 2차원 탄.점소성 유한요소해석)

  • 진치섭;노경배;한상중
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1996.10a
    • /
    • pp.89-94
    • /
    • 1996
  • The use of shield is increasing day by day, because it's method is advantageous tunneling method to soft and collapsible ground. In case of analyzing shield tunnel by FEM, short term behavior of ground by initial heaving and tail void closure and long terms of it because of consolidation by changes of pore pressures in clay must be considered. In this paper, the shield tunneling construction stages was analyzed from 2 dimensional elasto - viscoplastic finite element program used Mohr - Coulomb yield criterion but not considered the changes of pore pressures. The object of investigation was N - 2 Tunnel. Since the good results of analysis compared to the measured behavior of ground for heaving, tail void closure and liner installation, this results can be applied to design and construction of shield tunneling for the subways, sewage lines etc.

  • PDF

Deformation analyses during subway shield excavation considering stiffness influences of underground structures

  • Zhang, Zhi-guo;Zhao, Qi-hua;Zhang, Meng-xi
    • Geomechanics and Engineering
    • /
    • v.11 no.1
    • /
    • pp.117-139
    • /
    • 2016
  • Previous studies for soil movements induced by tunneling have primarily focused on the free soil displacements. However, the stiffness of existing structures is expected to alter tunneling-induced ground movements, the sheltering influences for underground structures should be included. Furthermore, minimal attention has been given to the settings for the shield machine's operation parameters during the process of tunnels crossing above and below existing tunnels. Based on the Shanghai railway project, the soil movements induced by an earth pressure balance (EPB) shield considering the sheltering effects of existing tunnels are presented by the simplified theoretical method, the three-dimensional finite element (3D FE) simulation method, and the in-situ monitoring method. The deformation prediction of existing tunnels during complex traversing process is also presented. In addition, the deformation controlling safety measurements are carried out simultaneously to obtain the settings for the shield propulsion parameters, including earth pressure for cutting open, synchronized grouting, propulsion speed, and cutter head torque. It appears that the sheltering effects of underground structures have a great influence on ground movements caused by tunneling. The error obtained by the previous simplified methods based on the free soil displacements cannot be dismissed when encountering many existing structures.

A study on Gap Parameter and Influence Area of Ground Settlement Using Back Analysis Constructed by Shield TBM with Shallow Depth (천층터널 쉴드TBM에서 역해석을 이용한 Gap Parameter 및 지표침하 영향범위에 대한 연구)

  • Koh, Sung-Yil;Kwon, Sung-Ju;Hwang, Chang-Hee;Kim, Sang-In;Choo, Seok-Yeon
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1509-1518
    • /
    • 2011
  • Shield TBM tunneling method has been getting the spotlight for urban tunneling. It can be minimized the civil complaint during construction and possible safe tunneling. But the settlement has occurred inevitably due to characteristics of shield TBM equipment. For this reason, the civil complaint can occur in urban areas when tunnel with shallow depth passes through neighboring building or residential area. In this study, the occurrence factors of settlement according to shield TBM tunneling and the tendency of ground settlement by strata condition had analyzed. It is suggested that the practical settlement estimation method and minimizing method of ground settlement under simultaneous backfill grouting condition through measurement results and back analysis data using gap parameter.

  • PDF

The suggestion of tunneling information and detail requirements for EPB shield machine design (토압식 쉴드TBM 장비설계를 위한 설계항목과 세부 요구사양의 구성에 관한 제안)

  • Kim, Ki-Hwan;Kim, Hyouk;Kim, Seong-Cheol;Kang, Si-On;Mun, Cheol-Hwa
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.6
    • /
    • pp.611-622
    • /
    • 2020
  • Recently, tunneling projects using shield TBM are increasing in Korea, but the information of client for machine design and manufacturing considering the characteristics of the tunneling phase is not formal, and it is difficult to optimized machine for suitable tunneling works. This paper suggest as for reference the required terms that can be used in Korea on the design items and detailed requirements for ordering of EPB shield TBM based on overseas case study. It would be hope that the TBM user can request the overall tunneling plan and required machine specification when ordering TBM, and the TBM supplier can design and manufacturing that is clear condition and suitable machine for the successful project, so that there are no residential civil complaints and for safe tunneling as well, shield TBM tunneling method will be activated.

Shield TBM trouble cases review and parameter study for the cause analysis (쉴드 TBM 트러블 사례 및 매개변수 연구를 통한 원인 분석)

  • Koh, Sungyil;La, You-Sung;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.197-217
    • /
    • 2020
  • Shield TBM tunneling, used in the construction of Seoul subway line 7 and line 9, has been well known as a very efficient, as well as safe, tunneling method. Although the Shield TBM method has been known to be effectively used in poor ground conditions, a number of troubles have occurred during the use of the shield TBM, due to inappropriate machine selection, machine breakdown, and unpredicted ground conditions etc. In this study, several accidents and trouble cases occurred during excavation by Shield TBM, reported from Japan, were investigated. A series of numerical analysis was then performed to compare with the trouble cases and back-analysis results for the cause analysis. The lessons learned from the case studies are presented at the end.

An overview of several techniques employed to overcome squeezing in mechanized tunnels; A case study

  • Eftekhari, Abbas;Aalianvari, Ali
    • Geomechanics and Engineering
    • /
    • v.18 no.2
    • /
    • pp.215-224
    • /
    • 2019
  • Excavation of long tunnels by shielded TBMs is a safe, fast, and efficient method of tunneling that mitigates many risks related to ground conditions. However, long-distance tunneling in great depth through adverse geological conditions brings about limitations in the application of TBMs. Among various harsh geological conditions, squeezing ground as a consequence of tunnel wall and face convergence could lead to cluttered blocking, shield jamming and in some cases failure in the support system. These issues or a combination of them could seriously hinder the performance of TBMs. The technique of excavation has a strong influence on the tunnel response when it is excavated under squeezing conditions. The Golab water conveyance tunnel was excavated by a double-shield TBM. This tunnel passes mainly through metamorphic weak rocks with up to 650 m overburden. These metamorphic rocks (Shales, Slates, Phyllites and Schists) together with some fault zones are incapable of sustaining high tangential stresses. Prediction of the convergence, estimation of the creeping effects and presenting strategies to overcome the squeezing ground are regarded as challenging tasks for the tunneling engineer. In this paper, the squeezing potential of the rock mass is investigated in specific regions by dint of numerical and analytical methods. Subsequently, several operational solutions which were conducted to counteract the challenges are explained in detail.

A Prediction Method for Ground Surface Settlement During Shield Tunneling in Cohesive Soils (점성토 지반에서의 실드 터널 시공에 따른 지표침하 예측 기법)

  • Yoo, Chung-Sik;Lee, Ho
    • Geotechnical Engineering
    • /
    • v.13 no.6
    • /
    • pp.107-122
    • /
    • 1997
  • This paper presents a ground surface settlement prediction method for shield tunneling in cohesive soils. In order to develop the method, a parametric study on shield tunneling was performed by using a threetimensional elasto-plastic finite element analysis, which can simulate the construction procedure. By using the results of the finite element analysis, the ground movement mechanism was investigated and a base which relates the ground surface settlement and iuluencing factors was formed. The data base was then used to formulate semi -empirical equations for both surface settlement ratio above tunnel face and imflection point by means of a regression analysis. Furthermore, a prediction method for transverse and longitudinal surface settlement profiles was suggested by using the leveloped equations in conjunction with the normal probability curve. Effectiveness of the developed method was illustrated by comparing settlement profiles obtained by using the developed method with the results of finite element analysis and measured data. Based on the comparison, it was concluded that the developed method can be effectively rosed for practical applications at least within the conditions investigated.

  • PDF

Inspecting Stablity of DSM method with Grouting on Tunnel Face using Chamber Test and Numericlal Analysis (토조실험과 수치해석을 이용한 막장면 그라우팅 DSM공법의 안정성 검토)

  • Kim, Young-Uk;Park, Young-Bok;Kim, Li-Sak;Kim, Nak-Kyeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.3
    • /
    • pp.677-683
    • /
    • 2016
  • In urban areas, underground tunnel construction sites have spread widely to accommodate rapidly increasing traffic volume along with a high-degree economic growth. Earth tunneling might be adapted frequently for the underground space securing, and various tunneling methods have been developed to stabilize the tunnel face and crown. Among them, the DSM (divided shield method) is gaining popularity for its enhanced stability and construction efficiency. This method has its foundation from the Messer Shield method, which is one of the trenchless special tunneling methods. This study examined the effects of face reinforcement on construction the sequence through a large scale soil chamber test and numerical analyses. The chamber has a size of a 1/2 scale of the real tunnel. Surface settlements were measured according the tunneling process. Commercially available software, MIDAS GTS, was used for numerical analysis and its result was compared with the values obtained from the chamber test. The results of the study show that both settlements of the embanked soils and the stress of the tunnel girder are located within the safe criteria. Overall, this study provides basic data and the potential of using a reinforced tunnel face to enhance DSM applications.

Stability evaluation for the excavation face of shield tunnel across the Yangtze River by multi-factor analysis

  • Xue, Yiguo;Li, Xin;Qiu, Daohong;Ma, Xinmin;Kong, Fanmeng;Qu, Chuanqi;Zhao, Ying
    • Geomechanics and Engineering
    • /
    • v.19 no.3
    • /
    • pp.283-293
    • /
    • 2019
  • Evaluating the stability of the excavation face of the cross-river shield tunnel with good accuracy is considered as a nonlinear and multivariable complex issue. Understanding the stability evaluation method of the shield tunnel excavation face is vital to operate and control the shield machine during shield tunneling. Considering the instability mechanism of the excavation face of the cross-river shield and the characteristics of this engineering, seven evaluation indexes of the stability of the excavation face were selected, i.e., the over-span ratio, buried depth of the tunnel, groundwater condition, soil permeability, internal friction angle, soil cohesion and advancing speed. The weight of each evaluation index was obtained by using the analytic hierarchy process and the entropy weight method. The evaluation model of the cross-river shield construction excavation face stability is established based on the idea point method. The feasibility of the evaluation model was verified by the engineering application in a cross-river shield tunnel project in China. Results obtained via the evaluation model are in good agreement with the actual construction situation. The proposed evaluation method is demonstrated as a promising and innovative method for the stability evaluation and safety construction of the cross-river shield tunnel engineerings.