• Title/Summary/Keyword: Set-up Equipment

Search Result 256, Processing Time 0.029 seconds

A Study on the Vibration of Hydraulic Clutch Control System (Hydraulic Clutch Control System의 진동특성에 관한연구)

  • So, Yoon-Sub;Hur, Man-Dae;Kim, Jae-Young;Kang, Ji-Woo;Lee, Hong-Bum;Lee, Jae-Yeol;Lee, Jong-Hyung;Ro, Seung-Hoon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.13 no.1
    • /
    • pp.15-22
    • /
    • 2010
  • This paper was originated to set up a test equipment and to obtain the proper installation condition of the plastic damper for the hydraulic clutch control system. Performance tests with different specifications have been applied to the damper to investigate the workability and the vibration characteristics of each case, and the result was utilized into the system simulation for the optimal condition for the damper. The procedure has been developed to set up a damper test system to analyze the dynamic properties and the operation of the system, and further to setup a simulation program for the realistic situations. The result can also be applied to the dampers and the clutch systems to be developed in the future for the property tests and the optimization of the installation conditions.

  • PDF

Development of Interlocking Inspection Simulator for Electronic Interlocking System (전자연동장치를 위한 연동검사시스템의 개발)

  • Lee, Jae-Ho;Hwang, Jong-Gyu;Park, Young-Soo;Park, Gui-Tae
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.53 no.2
    • /
    • pp.70-76
    • /
    • 2004
  • The purpose of interlocking system in railway is to prevent the route for a train being set up and its protecting signal cleared if there were already another, conflicting route set up and the protecting signal for that route cleared. Recently, conventional relays circuitry in industrial field is replaced to computer-based control systems according to the advance of computer and communication technology. Therefore, interlocking systems in railway field are rapidly changing from existing relay-based interlocking system to computer-based electronic ones that executes the vital interlocking logic to assure the safety train routes at trackside signaling equipment room using electronic circuits. So it is very important to verify the performance of developed electronic interlocking system by plentiful laboratory testing before actually application in the railway system. However the laboratory testing in the present state of railway signaling is preformed individually by manual, so very much test time and cost are required. To solve these problems, we are developed the simulator for automatic interlocking inspection in this research. This simulator is able to operate on general personal computer and has following beneficial functions : automatic test sheet generation for inspection, automatic inspection execution and et al. The experiments are executed to test the feasibility of the developed simulator the experimental results have good agreements with the anticipated ones.

Rapid Manufacturing of Trial Molds and Prototypes by High Speed Machining (고속가공을 이용한 시작금형 및 시작품의 쾌속제작)

  • Sin, Bo-Seong;Yang, Dong-Yeol;Choe, Du-Seon;Je, Tae-Jin;Lee, Eung-Suk;Hwang, Gyeong-Hyeon;Lee, Jong-Hyeon;J. H.
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.12
    • /
    • pp.124-129
    • /
    • 2001
  • Recently, life cycle and lead-time of products have been shortened with the demand of customers. Therefore, it is important to reduce time and cost at the step of manufacturing trial molds. High speed machining can be applied for this kind of purpose with a lot of practical advantages. In our research, several fundamental experiments are carried out to obtain machining parameters such as cutting force, machining time and surface characteristics for tool paths that are appropriate to high-speed machining. Moreover, a trial mold for an automatic transmission knob is fabricated with aluminum-7075 material. Using automatic set-up equipments, an ABS rapid prototype of a trial product of an AT knob is also manufactured with a filling process.

  • PDF

A Study on the Forging of Gears with lnternal Serrations (내부세레이션홈이 존재하는 외치차 단조에 관한 연구)

  • 최종용;조해용
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1995.10a
    • /
    • pp.633-637
    • /
    • 1995
  • Numerical calculation tool for forging of gear-like components based on kinematically admissible velocity fields for upper bound method applicable to various deformation features of workpiece in forging processes were suggested. Each one of them deals with unidirectional flow of metal on dies, such as external involute spur gear, sequare spline, internal serrations. A complex calcuation tool of gear-like component forging process was built up by combining these kinematically velocity fields. In this paper, the workpiece with both external and internal teeth is divided into two parts. The deformation of each part is analyzed simultaneously using numerical calculation tool form combined kinematically admissible velocity field. The experimental set-up was installed in a 200 ton hydraulic press. As a result, each kinematically admissible velocity field could be combined with other and the calculated solution are useful to predict the capacity of forging equipment.

  • PDF

A Study on the Forging of Spur Gears with Internal Serrations (내부세레이션홈을 갖는 스퍼어 기어의 단조에 관한 연구)

  • 최종웅;조해용
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.2
    • /
    • pp.81-89
    • /
    • 1998
  • Numerical calculation tools for forging of gear-like components based on kinematically admissible velocity fields for upper bound method applicable to various deformation features of workpiece in forging processes were suggested. Each one of them deals with unidirectional flow of metal on dies, such as external involute spur gear. square spline, internal serrations. A complex calculation tool of gear-like component forging process was built up by combining these kinematically velocity fields. In this paper the workpiece with 110th external and internal teeth is divided into two parts. The deformation of each part is analyzed simultaneously using numerical calculation tool from combined kinematically admissible velocity field. The experimental set-up was installed in a 200 ton hydraulic press. As a result, each kinematically admissible velocity field could be combined with others and the calculated solution are useful to predict the capacity of forging equipment.

  • PDF

Drop Test Simulation of semi-active Landing Gear using Commercial Magneto-Rheological Damper (상용 MR 댐퍼를 이용한 반능동형 착륙장치 낙하실험)

  • Hwang, Jae-Up;Hwang, Jae-Hyuk;Bae, Jae-Sung;Lim, Kyoung-Ho
    • Journal of Aerospace System Engineering
    • /
    • v.4 no.4
    • /
    • pp.44-48
    • /
    • 2010
  • This paper is used the commercial magneto-rheological(MR) damper for landing gear. The damping characteristics of Commercial MR damper by changing the intensity of the magnetic field are investigated and the dynamic responses of the landing gear. it is set up tset equipment, the landing gear drop test system. The landing gear involved drop testing the gear. The landing gear is tested by implementing sky-hook control algorithm and its performance is evaluated comparing to the result.

  • PDF

Flow Measurement and Control by Time-Based Method

  • Chang, Young-Chul;Kim, No-Hyu;Kim, Yong-Cheol
    • Proceedings of the Korean Society Of Semiconductor Equipment Technology
    • /
    • 2002.11a
    • /
    • pp.115-116
    • /
    • 2002
  • This study aimed to investigate flow measurement by using a 'bucket and stop-watch' method of flow measurement. Most flow measurement systems measure pressure or other fluid properties to infer flow rate, though time is a variable which can be easily and very accurately measured. The main principle behind the method was to fill up a reservoir until a set pressure had been reached. This reservoir would then be emptied and the cycle would repeat itself. The prototype was designed to control flow rate using the method. It made use of computer control with an analogue digital converter and fast acting solenoid valves which controlled the flow into a reservoir. Reservoirs were available with internal diameter of 1mm up to 5.5mm to cope with a range of flow rate.

  • PDF

A Study on the Automation Equipment Development of RC Technology(II) -Improvement of Position Controller- (RC 기술의 자동화 장치 개발에 관한 연구(II) -위치 제어기의 개선-)

  • Kim, Ki-Joon;Kim, Sang-Jin;Song, Ja-Youn
    • Proceedings of the KIEE Conference
    • /
    • 1994.11a
    • /
    • pp.314-316
    • /
    • 1994
  • The operation of RC(Rod Consolidation) technology carry out highly radiation environment. It requires remote operation and automation for efficient handling and for minimizing radiation exposure to the operator. So we investigated up and down position control of shock absorber device in RC system. To verify the research experimentally, a RC system was set up and PI control method was applied. Fuzzy control method was also tested to further improve control behavior.

  • PDF

A Study of Efficient Floor Planning and Facility Improvement for Physical Therapy Room of Domestic Long-term Hospitals (국내 요양병원의 물리치료실의 효율적 평면계획 및 시설개선에 관한 연구)

  • Chung, Kwang-Ho
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.4
    • /
    • pp.5-11
    • /
    • 2011
  • The present study investigated the actual conditions of physical therapy rooms at long-term hospitals in Korea and conducted a comparative analysis to develop an efficient floor plan and facility improvement measures. 1. At hospitals surveyed, physical therapy services were used at a high frequency but they did not have enough space for rehab treatment and long paths of patient flow were found to make patient management inconvenient. Therefore, physical therapy units should be conveniently located both in terms of distance and direction so as to be accessible from patient rooms or wards. The space should be organized in a concentrated layout for efficiency of physical therapy, and floor planning for therapy units should ensure the best possible viewing angle to therapists. 2. With regard to the disease characteristics of patients, many physical therapy rooms were in difficult circumstances because of poor facilities, so they need to secure skilled personnel, supplement apparatuses and equipment and have rooms for functional recovery, hydrotherapy and operation treatment. In addition, each of the curtained or partitioned areas for treatment should be set up with consideration for the amount of space taken up by medical equipment. The area under each bed should be designed for patient convenience so that it can be used as storage space for patient's belongings and shoes. 3. Patients complained about the lack of physical therapy space, resting places or exercise areas and demanded the expansion of rehab programs and facilities. Physical therapy facilities need to be improved for patient privacy and effective natural ventilation. 4. At most of the long-term hospitals surveyed, physical therapy units were found to have small areas and treatment equipment and devices were insufficient compared to the number of patients. Therefore, it is required to secure more space (at least 138.24 sq. meters per 100 beds) and improve facilities for better physical therapy services.

Development of a New Prediction Alarm Algorithm Applicable to Pumped Storage Power Plant (양수발전 설비에 적용 가능한 새로운 고장 예측경보 알고리즘 개발)

  • Dae-Yeon Lee;Soo-Yong Park;Dong-Hyung Lee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.2
    • /
    • pp.133-142
    • /
    • 2023
  • The large process plant is currently implementing predictive maintenance technology to transition from the traditional Time-Based Maintenance (TBM) approach to the Condition-Based Maintenance (CBM) approach in order to improve equipment maintenance and productivity. The traditional techniques for predictive maintenance involved managing upper/lower thresholds (Set-Point) of equipment signals or identifying anomalies through control charts. Recently, with the development of techniques for big analysis, machine learning-based AAKR (Auto-Associative Kernel Regression) and deep learning-based VAE (Variation Auto-Encoder) techniques are being actively applied for predictive maintenance. However, this predictive maintenance techniques is only effective during steady-state operation of plant equipment, and it is difficult to apply them during start-up and shutdown periods when rises or falls. In addition, unlike processes such as nuclear and thermal power plants, which operate for hundreds of days after a single start-up, because the pumped power plant involves repeated start-ups and shutdowns 4-5 times a day, it is needed the prediction and alarm algorithm suitable for its characteristics. In this study, we aim to propose an approach to apply the optimal predictive alarm algorithm that is suitable for the characteristics of Pumped Storage Power Plant(PSPP) facilities to the system by analyzing the predictive maintenance techniques used in existing nuclear and coal power plants.