• Title/Summary/Keyword: Service Parts

Search Result 924, Processing Time 0.024 seconds

A Heuristic for Service-Parts Lot-Sizing with Disassembly Option (분해옵션 포함 서비스부품 로트사이징 휴리스틱)

  • Jang, Jin-Myeong;Kim, Hwa-Joong;Son, Dong-Hoon;Lee, Dong-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.2
    • /
    • pp.24-35
    • /
    • 2021
  • Due to increasing awareness on the treatment of end-of-use/life products, disassembly has been a fast-growing research area of interest for many researchers over recent decades. This paper introduces a novel lot-sizing problem that has not been studied in the literature, which is the service-parts lot-sizing with disassembly option. The disassembly option implies that the demands of service parts can be fulfilled by newly manufactured parts, but also by disassembled parts. The disassembled parts are the ones recovered after the disassembly of end-of-use/life products. The objective of the considered problem is to maximize the total profit, i.e., the revenue of selling the service parts minus the total cost of the fixed setup, production, disassembly, inventory holding, and disposal over a planning horizon. This paper proves that the single-period version of the considered problem is NP-hard and suggests a heuristic by combining a simulated annealing algorithm and a linear-programming relaxation. Computational experiment results show that the heuristic generates near-optimal solutions within reasonable computation time, which implies that the heuristic is a viable optimization tool for the service parts inventory management. In addition, sensitivity analyses indicate that deciding an appropriate price of disassembled parts and an appropriate collection amount of EOLs are very important for sustainable service parts systems.

A Study on the Demand Prediction Model for Repair Parts of Automotive After-sales Service Center Using LSTM Artificial Neural Network (LSTM 인공신경망을 이용한 자동차 A/S센터 수리 부품 수요 예측 모델 연구)

  • Jung, Dong Kun;Park, Young Sik
    • The Journal of Information Systems
    • /
    • v.31 no.3
    • /
    • pp.197-220
    • /
    • 2022
  • Purpose The purpose of this study is to identifies the demand pattern categorization of repair parts of Automotive After-sales Service(A/S) and proposes a demand prediction model for Auto repair parts using Long Short-Term Memory (LSTM) of artificial neural networks (ANN). The optimal parts inventory quantity prediction model is implemented by applying daily, weekly, and monthly the parts demand data to the LSTM model for the Lumpy demand which is irregularly in a specific period among repair parts of the Automotive A/S service. Design/methodology/approach This study classified the four demand pattern categorization with 2 years demand time-series data of repair parts according to the Average demand interval(ADI) and coefficient of variation (CV2) of demand size. Of the 16,295 parts in the A/S service shop studied, 96.5% had a Lumpy demand pattern that large quantities occurred at a specific period. lumpy demand pattern's repair parts in the last three years is predicted by applying them to the LSTM for daily, weekly, and monthly time-series data. as the model prediction performance evaluation index, MAPE, RMSE, and RMSLE that can measure the error between the predicted value and the actual value were used. Findings As a result of this study, Daily time-series data were excellently predicted as indicators with the lowest MAPE, RMSE, and RMSLE values, followed by Weekly and Monthly time-series data. This is due to the decrease in training data for Weekly and Monthly. even if the demand period is extended to get the training data, the prediction performance is still low due to the discontinuation of current vehicle models and the use of alternative parts that they are contributed to no more demand. Therefore, sufficient training data is important, but the selection of the prediction demand period is also a critical factor.

Strength Prediction Model and The Internet Service of Fused Deposition Modeling (Fused Deposition Modeling의 강도예측모델과 인터넷 서비스)

  • 백창일;추원식;이선영;안성훈
    • Proceedings of the Korean Society For Composite Materials Conference
    • /
    • 2002.10a
    • /
    • pp.179-182
    • /
    • 2002
  • Rapid Prototyping (RP) technologies provide the ability to fabricate initial prototypes from various model materials. Stratasys' Fused Deposition Modeling (FDM) is a typical RP process that can fabricate prototypes out of plastic materials, and the parts made from FDM were often used as load-carrying elements. Because FDM deposits materials in about $300\mutextrm{m}$ thin filament with designated orientation, parts made from FDM show anisotropic material properties. This paper proposes an analytic model to predict the tensile strength of FDM parts. Applying the Classical Lamination Theory, which was developed for laminated composite materials, a computer code was implemented. Tsai-Wu failure criterion was added to the code to predict the failure of the FDM parts. The tensile strengths predicted by the analytic model were compared with experimental data. The data and prediction agreed reasonably well to prove the validity of the model. In addition, a web-based advisory service was developed to provide to strength prediction and design rules for FDM parts.

  • PDF

Estimation on Repair Part Requirement of Some Major Parts of Power Tiller (사후봉사(事後奉仕)를 위(為)한 동력경운기(動力耕耘機) 주요(主要) 부품(部品)의 소요(所要) 수량(数量) 추정(推定)에 관(関)한 연구(硏究))

  • Lee, Dae Weon;Kim, Kyeong Uk
    • Journal of Biosystems Engineering
    • /
    • v.9 no.1
    • /
    • pp.5-10
    • /
    • 1984
  • Using the renewal theory based on the Weibull distribution, an estimation was made on the number of replacement parts annually required for the after-service of some major parts of power tiller at the local repair shops or dealers. The production requirements of the parts were also estimated for the service in the next 5 years following the sales of power tillers.

  • PDF

A Design and Development of Part Management System including Capabilities from Data Management to Order Management (데이터 관리에서 발주 관리까지 기능을 포함하는 부품 관리 시스템의 설계와 개발)

  • Rhee, Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.1
    • /
    • pp.47-56
    • /
    • 2012
  • Service Parts Management is defined as a supply management associated with service parts from the part suppliers to the final customer. A series of process to improve the customer service level by forecasting the demand and to minimize cost by maintaining the inventory level is included. Uniqueness such as missing value correction, the data pattern analysis and planned order system is designed and implemented. Main feature of order management system is to calculate order amount and order time based on selection of optimal forecasting algorithm.

A study on the Innovation method of Metro EMU Maintenance (도시철도 전동차 정비 이론 및 개선 방향 연구)

  • Choi, Yong-Woon
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1864-1870
    • /
    • 2007
  • The inspection periods for the metro EMU maintenances vary variously according to the countries and railway operators. And the inspection systems vary according to the safety, economical, technical aspects, and also the social environments like passengers and maintenance qualities, etc. Also, in economic point of view, maintenance requires the man power, facilities, equipments, purchasing of parts and the loss of not being in revenue service during the maintenance period. Recently, there is a tendency that the inspection periods are extended gradually owing to the increased reliabilities of the equipments and parts of EMUs. Even if it is the EMUs that are already be in service, once the inspection method is innovated, the inspection time can be reduced. The inspection management innovation scheme includes such methods as the complete module to module replacement when trouble shooting a faulty parts before putting the EMU back to revenue service, the replacements of parts in complete set unit for the heavy maintenance, the establishments of exchange periods for the wasting parts, modernization of inspection equipments, introduction of RAMS for the reliability improvement and computerization of EMU maintenance management, etc. I think it is possible to optimize the inspection scopes and periods per parts and equipments by the introduction of RAMS.

  • PDF

A study on service parts demand forecasting considering parts life cycle (부품 수명주기를 고려한 서비스 부품의 수요예측에 관한 연구)

  • Kwon, Ick-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.3
    • /
    • pp.97-107
    • /
    • 2017
  • This research studies on the demand forecasting for service parts considering parts life cycle, that gets relatively less attentions in the field of forecasting. Our goal is to develop forecasting method robust across many situations, not necessarily optimal for a limited number of specific situations. For this purpose, we first extensively analyze the drawbacks of the existing forecasting methods, then we propose the new demand forecasting method by using these findings and reinforcement leaning technique. Using simulation experiments, we proved that the proposed forecasting method is better than the existing methods under various experimental environments.

A Case Study on Mobile Web-service Implementation for a VMI System of Small.medium sized the Auto-parts Manufacturer in Supply Chain (공급사슬관계에서 중.소 자동차부품제조업체의 VMI시스템에 관한 웹서비스구현)

  • Na, Sang-Gyun;Oh, Myung-Hyun;Jeong, Byung-Ho;Lee, Jun-Su
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.2
    • /
    • pp.29-36
    • /
    • 2007
  • This study was concerned about mobile web-service of a VMI in the SCM system. The VMI would be a main module part of the SCM and regarded as very important thing on supply chain. Therefore, it was essential to react in real time of materials production and situation of used auto-part in procurement company. We could find an affordable method to realize the VMI in a web service. The web service has made inter relevant enterprise easy to collaborate because of supporting most operating system and frame-work. Moreover, the use of a mobile tools was guaranteed a product recording and requirement of materials to real time in a rapid changing of production environments. The result of this research was very useful to apply the VMI system in medium and small sized auto parts company. This web service package has programmed the Visual Studio Dot Net 2003 and the MS SQL 2000 as database.

Development of Air Force Winter Service Uniform Shirt Pattern and Automatic Pattern Drafting Program for MTM Production (MTM 생산을 위한 공군 동약정복 셔츠 패턴 제도법 및 자동 제도 프로그램 개발)

  • Kim, In-Hwa;Nam, Yun-Ja;Kim, Sung-Min
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.35 no.11
    • /
    • pp.1271-1284
    • /
    • 2011
  • This study improves the fitness of Air Force winter service uniforms through the development of a shirt pattern drafting method and automatic pattern drafting program for MTM production. A calculation formula is formed through a correlation analysis and regression analysis using Size Korea 2004 3D measurement data after analyzing 4 kinds of existing shirt pattern drafting methods and 3 types of shirt patterns currently used for the Air Force service uniform. The results of this study are as follows: The developed pattern drafting method has 4 parts that use calculated dimensions: neck base width, front interscye, back interscye and scye depth. Other body measuring parts that have a high correlation with calculation parts are inserted into regression analysis as independent variables to create dimension calculation formulas. The result of the final study patterns were better than existing winter service uniforms in nearly all items for the appearance evaluation and motion adaptability evaluations. The method was converted into an automatic pattern drafting program using C++ after the completion of pattern drafting method development.

MIMS: Web-based Micro Machining Service (MIMS: 웹기반 마이크로 머시닝 서비스)

  • Chu W.-S.;Ahn S.-H.;Kim D.-S.;Jun C.-S.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.9 no.3
    • /
    • pp.246-252
    • /
    • 2004
  • Presented in this Paper is a Micro Machining Service .(MIMS) based on the World Wide Web technologies. In order to ensure easy access to the service, the web browsers are used as the user interface. The pan geometry as an STL file is uploaded with process parameter for 3-axis CNC milling. Depending on the predefined user level, novice or expert, the user interface requires different parameters for process planning. An STL-based CAM resides in the server and automatically provides NC codes upon user's request. Tool-paths for scanning and pencil-cut, which are interference-free and precise, are created by the curve-based polyhedral machining method. A couple of sample parts were fabricated by a micro endmill with 127 fm diameter. From the tests, the parts fabricated by scanning followed by pencil-cut resulted in less error(within 2%) than the parts machined only by scanning tool-path.