• Title/Summary/Keyword: Selection and Evaluation

Search Result 2,287, Processing Time 0.028 seconds

U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication (미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점)

  • Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.2
    • /
    • pp.215-225
    • /
    • 2020
  • In selecting a company of A-E service provider for a public construction project, public owners make widely use the evaluation method based on the quantitative criteria to emphasize transparency and fairness instead of putting more weighting on bidders' technical capability. The selection method and process to select technically better company has been in discussion to motivate company to build up their technical capability and better quality of service. This paper examined US laws and regulations related to evaluating and selecting an A-E company for public construction project in terms of principles, process, selection committee, evaluation methods, and contract management and so on. Then deduced several implications for domestic public owner to select the most adequate company for a certain architectural service through fair and efficient way. The major findings are technical capability based selection, emphasizing owner's role and responsibility, consideration of small and mid-sized company, debriefing, and post-service evaluation.

A Comparative Analysis of Status on the Selection and Evaluation of Field Manager in Apartment and Office Building Project (공동주택과 오피스 건설현장의 조직원선정 및 평가실태 비교분석)

  • Lee Jung-Yong;Kim Byeong-Lae;Son Chang-Baek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.290-293
    • /
    • 2003
  • The field organization management in construction industry is very important factor improvement and cost reduction. But, until now, evaluation methods on the existing field organization did not make ready and endeavor of organization betterment was insufficient in construction industry. The purpose of this study to provide basic data for reasonable selection and evaluation of the field manager through analyzing operation status of the existing field organization in apartment and office building project by interview and questionnaire on the 22 construction companies. This study presented optimal proposal on the selection and evalution of field manager for productivity improvement and cost reduction by means of efficient construction progress in apartment and dffice building project.

  • PDF

Performance Evaluation of the Harmonic Parameters for High Impedance Fault Detection in Distribution System (배전계통의 고 임피던스 고장 검출 고조파 변수 성능 평가)

  • Oh, Yong-Taek;Kim, C.J.
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.883-885
    • /
    • 1997
  • High impedance fault(HIF) is random in its behavior even in a similar environment. The detection of Ire HIF has focused on the development of algorithms based on harmonic, parameters of the arc currents. However, a fact that proper selection of the harmonic parameters, rather than algorithm selection, is more important is shown in this paper by applying three different performance evaluation methods on two HIF detection algorithms using eight harmonic parameters.

  • PDF

Ex-ante Evaluation Process for Public R&D: Korean Case and its Implications for Indonesian R&D System

  • Lee, Elly Hyanghee;Jang, Young-Sun;Ariyani, Luthfina;Sari, Karlina;Hardiyati, Ria
    • Asian Journal of Innovation and Policy
    • /
    • v.9 no.3
    • /
    • pp.281-307
    • /
    • 2020
  • A variety of approaches are being applied to improve the existing ex-ante evaluation by expert panels in publicly funded R&D. While the objective evaluation criteria are constantly being improved to screen and select the superior projects, alternative approaches such as random prioritization and logical modeling are also underway to overcome the conservative bias of reviewers and to secure disruptive innovation. This study intends to find critical implications for ex-ante evaluation of public R&D system from the comparison of Indonesia and Korea. For the comparative analysis, literature review and expert in-depth interviews are conducted on the national R&D system and the selection evaluation process. In Korea, the selection criteria of projects are legally promulgated for establishing an objective evaluation system, and at the program level, the major considerations in the planning process are specified by Presidential Decree. On the other hand, while Indonesia conducts R&D in 47 strategic fields largely by public research institutes (PRI) based on the non-competitive government contributions. This study draws out implications of institutionalizing the planning process at the level of program, and of increasing the ratio of contract-based competitive funding at the level of project in the national R&D portfolio.

Discovery of Performance Traits-Linked Microsatellite Markers in Channel Catfish (Ictalurus punctatus)

  • Kim, Soon-Hag
    • Journal of Aquaculture
    • /
    • v.18 no.2
    • /
    • pp.130-132
    • /
    • 2005
  • Genomics research has two ultimate applied goals: to Isolate and clone genes of economic importance for bio-technology and gene-assisted selection (GAS), and to locate and use markers for marker-assisted selection (MAS) in selective breeding programs. To this end, we have identified linked markers for feed conversion efficiency growth rate, and disease resistance to enteric septicemia of catfish (ESC). Three microsatellite markers Ip266, Ip384, and Ip607 were identified to be linked to feed conversion efficiency. Similarly one marker each was identified to be linked to growth rate (Ip607) and disease resistance to ESC (Ip477). Ip607 marker linked to both growth rate and feed conversion efficiency, indicating that the QTL for both growth rate and feed conversion efficiency may either be the same or located in the same chromosomal region in the catfish genome. On phenotypic evaluation, certain traits such as growth rate can be accurately evaluated by body weight evaluation while other traits such as disease resistance can be quite complex. The linked DNA markers will be highly useful for MAS programs and for directing further efforts of genomic mapping for important quantitative traits.

A Study on the Project Manager's Reaction to R&D Evaluation and Its Influencing Factors (연구과제 평가에 대한 과제책임자의 반응과 그 영향요인에 관한 연구)

  • 김인철;한도희
    • Journal of Korea Technology Innovation Society
    • /
    • v.3 no.2
    • /
    • pp.48-60
    • /
    • 2000
  • An effort has been made in this paper to measure the project manager's reaction to R&D project evaluation and present the useful information related to rebuilding an R&D evaluation system. Results of this study show that project manager's reaction is related to the selection of reasonable items for evaluation, the rater's expertise, the project manager's participation in evaluation process and so on. Accordingly, managers of the research institute have to set up the evaluation system after deeply considering these results.

  • PDF

Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects (공공건설사업의 발주방식 선정 및 성과평가 모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.41-47
    • /
    • 2007
  • The selection of the reasonable project delivery system (PDS) is crucial for a successful performance of a project, which means to achieve project objectives. Furthermore, the project performance has been tightly related to the selection of PDS appropriate to pertinent project characteristics. In this context, the ministry of finance and economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". For efficient operation of the new project delivery systems, this paper suggested a PDS selection model which supports decision making of the reasonable PDS for a pertinent project by assessing characteristics of the public construction projects, both quantitatively and qualitatively. In addition, a PDS performance evaluation model was proposed in order to get feedback on the result of the PDS selection and the operation for the succeeding project. The standard models suggested in this paper might be used as a tool to support the decision making of the public organizations.

  • PDF

A study on evaluation element of technical proposal tendering for apartment remodeling business

  • Park, Min-Young;Lim, Sooyoung
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.61-68
    • /
    • 2015
  • Method of remodeling builder selection for remodeling is competitive bidding. also metropolitan city, megalopolis city, city more than 50million have to do basic plan for remodeling before establishment of a housing cooperative. Purpose of basic plan is improvement of living conditions & the Quality of Life for resident. Technical Proposal Tendering in spite of being the a reasonable bidding system, institutional part, appraisal standard and the item part, consider procedure pard is performed in a similar way to the existing bidding system. so, technical proposal tendering is appropriate for future Method of builder selection of remodeling. therefore, the study purpose is a evaluation element of technical proposal tendering for apartment remodeling business The methods of study is understanding concept through review of precedent literature. Next, case investigation through Analysis of focal points. Lastly, evaluation element deduction of technical proposal tendering for apartment remodeling business through specialist conversation. As a result, Alteration of a right & move management is added to evaluation element's professional field. And detail item is alteration of a right & move management.

Feasibility Evaluation of High-Tech New Product Development Projects Using Support Vector Machines

  • Shin, Teak-Soo;Noh, Jeon-Pyo
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2005.11a
    • /
    • pp.241-250
    • /
    • 2005
  • New product development (NPD) is defined as the transformation of a market opportunity and a set of assumptions about product technology into a product available for sale. Managers charged with project selection decisions in the NPD process, such as go/no-go choices and specific resource allocation decisions, are faced with a complicated problem. Therefore, the ability to develop new successful products has identifies as a major determinant in sustaining a firm's competitive advantage. The purpose of this study is to develop a new evaluation model for NPD project selection in the high -tech industry using support vector machines (SYM). The evaluation model is developed through two phases. In the first phase, binary (go/no-go) classification prediction model, i.e. SVM for high-tech NPD project selection is developed. In the second phase. using the predicted output value of SVM, feasibility grade is calculated for the final NPD project decision making. In this study, the feasibility grades are also divided as three level grades. We assume that the frequency of NPD project cases is symmetrically determined according to the feasibility grades and misclassification errors are partially minimized by the multiple grades. However, the horizon of grade level can be changed by firms' NPD strategy. Our proposed feasibility grade method is more reasonable in NPD decision problems by considering particularly risk factor of NPD in viewpoints of future NPD success probability. In our empirical study using Korean NPD cases, the SVM significantly outperformed ANN and logistic regression as benchmark models in hit ratio. And the feasibility grades generated from the predicted output value of SVM showed that they can offer a useful guideline for NPD project selection.

  • PDF

A Study on the Analysis of ERP System Selection Factors (ERP 시스템 선정요인 특성에 관한 연구)

  • 김진수;임세헌
    • Journal of Information Technology Applications and Management
    • /
    • v.9 no.1
    • /
    • pp.1-26
    • /
    • 2002
  • ERP is the key-enabler of enterprise's informatization. Seletion of a right ERP system is one of the critical issues. Previous study shows that since a very few methodologies of selecting ERP systems are provided, most of companies have difficulty in Implementing ERP system. The purpose of this study is to analyze the characteristics of ERP system selection factors and develop the ERP evaluation methodology An empirical study is performed and shows that there are signigicant differences in ERP selection factors among ERP consultant, ERP developer, and system manager. The result shows that five factors such as general characteristics of software and supplier, technology characteristics of software and supplier, and Project management shills are significant. Based on the five factors, the evaluation methodology is developed. The methodology will help enterprises to make better decision in selecting ERP systems.

  • PDF