• Title/Summary/Keyword: Selected Site

Search Result 1,997, Processing Time 0.027 seconds

A Comparative Analysis of the Priority and Evaluation Factors of the Renewable Energy Plan Site by Country (국가별 재생에너지 계획입지제도 절차별 우선순위 및 평가요소 비교 분석)

  • Sung-Hoon, Kim;Hwa-Young, Yoon
    • New & Renewable Energy
    • /
    • v.18 no.4
    • /
    • pp.54-63
    • /
    • 2022
  • This study compared and analyzed major policies and operational processes of countries that introduced the Renewable Energy Plan Site, through literature analysis of published governmet data, and previous research results. The procedures of the Renewable Energy Plan Site were classified into planned location designations, selection of power generation business operators, designation of the business' district and development and evaluating the factors derived for each procedure. Four contries were selected to be compared and analyzed, namely: Denmark, Germany, the United Kingdom and Japan. This was based on the criteria used to introduce and operate the Renewable Energy Plan Site, activate renewable energy supply and check the applicability of Korea's policies. It was analyzed that the priority of the planned location for the procedure was different for each country depending on the conditions there.

Site Classification and Design Response Spectra for Seismic Code Provisions - (II) Proposal (내진설계기준의 지반분류체계 및 설계응답스펙트럼 개선을 위한 연구 - (II) 제안)

  • Cho, Hyung Ik;Satish, Manandhar;Kim, Dong Soo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.20 no.4
    • /
    • pp.245-256
    • /
    • 2016
  • In the companion paper (I - Database and Site Response Analyses), site-specific response analyses were performed at more than 300 domestic sites. In this study, a new site classification system and design response spectra are proposed using results of the site-specific response analyses. Depth to bedrock (H) and average shear wave velocity of soil above the bedrock ($V_{S,Soil}$) were adopted as parameters to classify the sites into sub-categories because these two factors mostly affect site amplification, especially for shallow bedrock region. The 20 m of depth to bedrock was selected as the initial parameter for site classification based on the trend of site coefficients obtained from the site-specific response analyses. The sites having less than 20 m of depth to bedrock (H1 sites) are sub-divided into two site classes using 260 m/s of $V_{S,Soil}$ while the sites having greater than 20 m of depth to bedrock (H2 sites) are sub-divided into two site classes at $V_{S,Soil}$ equal to 180 m/s. The integration interval of 0.4 ~ 1.5 sec period range was adopted to calculate the long-period site coefficients ($F_v$) for reflecting the amplification characteristics of Korean geological condition. In addition, the frequency distribution of depth to bedrock reported for Korean sites was also considered in calculating the site coefficients for H2 sites to incorporate sites having greater than 30 m of depth to bedrock. The relationships between the site coefficients and rock shaking intensity were proposed and then subsequently compared with the site coefficients of similar site classes suggested in other codes.

CAUTION OF REGIONAL FLOOD FREQUENCY ANALYSIS BASED ON WEIBULL MODEL

  • Heo, Jun-Haeng;Lee, Dong-Jin;Kim, Kyung-Duk
    • Water Engineering Research
    • /
    • v.1 no.1
    • /
    • pp.11-23
    • /
    • 2000
  • Regional flood frequency analysis has been developed by employing the nearby site's information to improve a precision in estimating flood quantiles at the site of interest. In this paper, single site and regional flood frequency analyses were compared based of the 2-parameter Weibull model. For regional analysis, two approaches were employed. The First one is to use the asymptotic variances of the quantile estimators derived based of the assumption that all sites including the site of interest are independent each other. This approach may give the maximum regional gain due to the spatial independence assumption among sites. The second one in Hosking's regional L-moment algorithm. These methods were applied to annual flood data. As the results, both methods generally showed the regional gain at the site of interest depending on grouping the sites as homogeneous. And asymptotic formula generally shows smaller variance than those from Hosking's algorithm. If the shape parameter of the site of interest from single site analysis is quite different from that from regional analysis then Hosking's results might be better than the asymptotic ones because the formula was derived based on the assumption that all sites have the same regional shape parameter. Furthermore, in such a case, regional analysis might be worse than single site analysis in the sense of precision of flood quantile estimation. Even though the selected sites may satisfy Hosking's criteria, regional analysis may not give a regional gain for specific and nonexceedance probabilities.

  • PDF

Derivation of site-specific derived concentration guideline levels at Korea Research Reactor-1&2 sites

  • Kim, Geun-Ho;Do, Tae Gwan;Kwon, Jae;Ryu, Gangwoo;Kim, Kwang Pyo
    • Nuclear Engineering and Technology
    • /
    • v.54 no.2
    • /
    • pp.493-500
    • /
    • 2022
  • The objective of this study was to derive derived concentration guideline levels (DCGLs) reflecting the site-specific characteristics of KRR-1&2. A total of 7 nuclides (H-3, C-14, Co-60, Sr-90, Cs-137, Eu-152, and Eu-154) were selected for DCGLs derivation. Radiation dose at the sites was evaluated with RESRAD-ONSITE program. The dose contribution due to direct external exposure was the highest during the entire evaluation period. Ingestion had the second effect. The DCGLs of Co-60 was derived to be 0.051 Bq/g, and DCGLs of Cs-137 was 0.193 Bq/g. The DCGLs of H-3 showed the highest value of 129 Bq/g. The ratio of DCGLs derived by applying site-specific values and default values ranged from 0.27 to 19.6. For six nuclides excluding H-3, KRR-1&2 sites and the overseas NPP sites showed similar DCGLs. H-3 showed large differences in DCGLs from this study and overseas NPPs. The large difference resulted from input parameter values applied to the sites. In conclusion, it is critical to apply site-specific parameter values reflecting the site characteristics to derive DCGLs for decommissioned site clearance. The result of this study can be used as a reference for nuclide selection and DCGLs derivation reflecting the site characteristics when decommissioning nuclear facilities, including nuclear power plants in Korea.

Site Index Equations and Estimation of Productive Areas for Major Pine Species by Climatic Zones Using Environmental Factors (기후대별 입지환경 인자에 의한 소나무류의 지위지수 추정식 및 적지 구명)

  • Shin, Man-Yong;Won, Hyung-Kyu;Lee, Seung-Woo;Lee, Yoon-Young
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.9 no.3
    • /
    • pp.179-187
    • /
    • 2007
  • This study was conducted to develop site index equations for some pine species by climatic zones based on the relationships between site index and environmental factors. The selected pine species were Pinus densiflora Sieb. et. Zucc., Pinus densiflora for, erecta, and Pinus thunbergii. A total of 28 environmental factors were obtained from a digital forest site map. The influence of 28 environmental factors on site index was evaluated by multiple regression analysis. Four to eight environmental factors were selected in the final site index equation for pine species by climatic zones. The site index equations developed in this study was then verified by three evaluation statistics such as model's estimation bias, model's precision and mean square error type of measure. We concluded that the site index equations for the pine species by climatic Bones were capable of estimating forest site productivity. Based on these site index equations, the amount of productive areas for the species by climatic zones was estimated by applying the GIS technique to digital forest maps.

토양 및 지하수 Investigation 과 Remediation에 대한 현장적용

  • Wallner, Heinz
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2000.11a
    • /
    • pp.44-63
    • /
    • 2000
  • Situated close to Heathrow Airport, and adjacent to the M4 and M25 Motorways, the site at Axis Park is considered a prime location for business in the UK. In consequnce two of the UK's major property development companies, MEPC and Redrew Homes sought the expertise of Intergeo to remediate the contaminated former industrial site prior to its development. Industrial use of the twenty-six hectare site, started in 1936, when Hawker Aircraft commence aircraft manufacture. In 1963 the Firestone Tyre and Rubber Company purchased part of the site. Ford commenced vehicle production at the site in the mid-1970's and production was continued by Iveco Ford from 1986 to the plant's decommissioning in 1997. Geologically the site is underlain by sand and gravel, deposited in prehistory by the River Thames, with London Clay at around 6m depth. The level of groundwater fluctuates seasonally at around 2.5m depth, moving slowly southwest towards local streams and watercourses. A phased investigation of the site was undertaken, which culminated in the extensive site investigation undertaken by Intergeo in 1998. In total 50 boreholes, 90 probeholes and 60 trial pits were used to investigate the site and around 4000 solid and 1300 liquid samples were tested in the laboratory for chemical substances. The investigations identified total petroleum hydrocarbons in the soil up to 25, 000mg/kg. Diesel oil, with some lubricating oil were the main components. Volatile organic compounds were identified in the groundwater in excess of 10mg/l. Specific substances included trichloromethane, trichloromethane and tetrachloroethene. Both the oil and volatile compounds were widely spread across the site, The specific substances identified could be traced back to industrial processes used at one or other dates in the sites history Slightly elevated levels of toxic metals and polycyclic aromatic hydrocarbons were also identified locally. Prior to remediation of the site and throughout its progress, extensive liaison with the regulatory authorities and the client's professional representatives was required. In addition to meetings, numerous technical documents detailing methods and health and safety issues were required in order to comply with UK environmental and safety legislation. After initially considering a range of options to undertake remediation, the following three main techniques were selected: ex-situ bioremediation of hydrocarbon contaminated soils, skimming of free floating hydrocarbon product from the water surface at wells and excavations and air stripping of volatile organic compounds from groundwater recovered from wells. The achievements were as follows: 1) 350, 000m3 of soil was excavated and 112, 000m3 of sand and gravel was processed to remove gravel and cobble sized particles; 2) 53, 000m3 of hydrocarbon contaminated soil was bioremediated in windrows ; 3) 7000m3 of groundwater was processed by skimming to remove free floating Product; 4) 196, 000m3 of groundwater was Processed by air stripping to remove volatile organic compounds. Only 1000m3 of soil left the site for disposal in licensed waste facilities Given the costs of disposal in the UK, the selected methods represented a considerable cost saving to the Clients. All other soil was engineered back into the ground to a precise geotechnical specification. The following objective levels were achieved across the site 1) By a Risk Based Corrective Action (RBCA) methodology it was demonstrated that soil with less that 1000mg/kg total petroleum hydrocarbons did not pose a hazard to health or water resources and therefore, could remain insitu; 2) Soils destined for the residential areas of the site were remediated to 250mg/kg total petroleum hydrocarbons; in the industrial areas 500mg/kg was proven acceptable. 3) Hydrocarbons in groundwater were remediated to below the Dutch Intervegtion Level of 0.6mg/1; 4) Volatile organic compounds/BTEX group substances were reduced to below the Dutch Intervention Levels; 5) Polycyclic aromatic hydrocarbons and metals were below Inter-departmental Committee for the Redevelopment of Contaminated Land guideline levels for intended enduse. In order to verify the qualify of the work 1500 chemical test results were submitted for the purpose of validation. Quality assurance checks were undertaken by independent consultants and at an independent laboratory selected by Intergeo. Long term monitoring of water quality was undertaken for a period of one year after remediation work had been completed. Both the regulatory authorities and Clients representatives endorsed the quality of remediation now completed at the site. Subsequent to completion of the remediation work Redrew Homes constructed a prestige housing development. The properties at "Belvedere Place" retailed at premium prices. On the MEPC site the Post Office, amongst others, has located a major sorting office for the London area. Exceptionally high standards of remediation, control and documentation were a requirement for the work undertaken here.aken here.

  • PDF

Utilization of Selected Landfill Waste Soils for Road Embankment Materials (도로성토재료로서 폐기물 매립장 선별토사의 활용)

  • Kim, Young-Su;Jung, Sung-Kwan;Choi, Byung-Hak;Lee, Sang-Woong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.4 no.1
    • /
    • pp.29-39
    • /
    • 2003
  • The major objectives of this study were to investigate the physical characteristics of selected refuse landfill waste soils which are excepted general waste materials and assessed the possibility of recycling for road construction or embankment materials. The old landfill site which is selected for this study is located at Youngyang in Kyungsangpukdo and it had been dumped and closed for 16-25 years. Therefore, the selected landfill waste soil became to geotechnical engineering characteristics when the closed landfill site is reused for road embankment materials. It was found that it would be better to use the selected waste soil mixed with the ordinary soil.

  • PDF

Occurrence of Vesicular-Arbuscular Mycorrhizal (VAM) Fungi and Their Effect on Plant Growth in Endangered Vegetations

  • Selvaraj, Thangaswamy;Padmanabhan, Chellappan;Jeong, Yu-Jin;Kim, Hoon
    • Journal of Microbiology and Biotechnology
    • /
    • v.14 no.4
    • /
    • pp.885-890
    • /
    • 2004
  • A survey for vesicular-arbuscular mycorrhizae (VAM) occurrence was undertaken in three endangered vegetation sites in the area of Kudankulam atomic power station. Fifteen VAM fungal species were isolated from the root-zone soils of fourteen different plant species. There was a significant correlation observed between the number of spores and of percentage root colonization as exemplified by Phyllanthus niruri and Paspalum vaginatum (450, 95%; 60, 25%). Although VAM species are not known to be strictly site specific, the fact that Acaulospora elegans was observed only in site 1, Glomus pulvinatum in site 2 only, and Gl. intraradices in site 3 only, showed site-specificity in this study. To confirm the infection efficiency, two host plant species in the sites, P. niruri and Eclipta alba, were selected and inoculated in field with three selected VAM fungal spores. Gl. fasciculatum was found to be the most efficient VAM species in percentage root colonization, number of VAM spores, and dry matter content. When the nutrients in roots of P. niruri and E. alba were analyzed, there was higher uptake of K (4.2 and 3.4 times, respectively) and Ca (5.3 and 4.9 times, respectively), the analogues for $^{137}Cs$ and $^{90}Sr$, respectively. From the results, it might be concluded that VAM association helps the plants survive in a disturbed ecosystem and enhances uptake and cycling of radionuclides from the ecosystem.

Various Designs of Gluteal Artery Perforator Flap for Buttock Reconstruction (둔부재건을 위한 천공지피판의 다양한 도안)

  • Hong, Seung Eun;Pyon, Jai Kyong
    • Archives of Plastic Surgery
    • /
    • v.34 no.2
    • /
    • pp.197-202
    • /
    • 2007
  • Purpose: The gluteal artery perforator flaps earned its popularity in buttock reconstruction due to the lower morbidity of the donor site and the flexibility in the design. Speedy and safe reconstruction is important for the success of buttock reconstruction. If a proper design is selected, satisfactory results can be obtained with more simple method of surgery. Methods: Between April 2005 and April 2006, buttock reconstruction by using gluteal artery perforator flaps were performed on sacral sores(6 cases), ischial sores(2 cases) and malignant melanoma on buttock(1 case). Various designs depending on the location and the size of the defect was made. In those designs, perforator was used as an axis for the minimal dissection of the vessel. Donor site from which sufficient amount of soft tissue can be transferred was selected, and also not causing high tension against the recipient site during the donor site closure. In addition, postoperative aesthetics, and the possibility of another design of a second operation which can be necessary in the future, was considered. Results: Patient follow up was for a mean period of 10.8 months. All flaps survived except for one that had undergone partial necrosis. Wound dehiscence was observed in one patient treated by secondary closure. Most patients presented with cosmetically and functionally satisfying results Conclusion: By designing the flap using the perforator as an axis, depending on the defect size and degree, reconstruction can be performed with only a small tension to the donor and the recipient site. And the minimal perforator dissection allowed easier and faster reconstruction. Selection of a proper design is the key procedure which greatly affects operation time and result success.

Selection of Tree History Management System Items for Analyzing the Causes of Landscape Tree Defects in an Apartment Complex

  • Park, Sang Wook
    • Journal of People, Plants, and Environment
    • /
    • v.23 no.3
    • /
    • pp.347-362
    • /
    • 2020
  • Background and objective: It is difficult to conclusively determine the exact cause of tree defects since multiple causes are involved such as climate change, plantation, tree quality and planting time, construction, planting base, drainage, sunshine conditions, maintenance, and microclimate. The data related to landscaping construction defects are scattered or fragmented by companies and years, but not managed systematically by the defect information management system. Most of the earlier studies associated with tree defects in apartment complexes suggested defect rates after examining tree defects in the completed construction site and proposed fragmentary and subjective conclusions about the causes of defects observed in trees with high defect rates. It is proposed to continue to conduct studies on the establishment and analysis of systematic databases to identify the exact causes of tree defects and measures to improve, and the need to accumulate systematic data in the construction process where many defects arises. This study was conducted to reduce the defects of trees planted in apartment complexes. Methods: Main factors related to tree defects were subdivided based on the results of literature review and a defect investigation at the completion site, and tree history management items were selected and subdivided during the construction stage. Results: The criteria for the preparation of subdivided items were obtained, and the tree history management checklist was written for the site under actual construction and a systematic database was established. Items that are categorized based to the causes of defects include the location of nurseries, date, tree quality, site conditions, planting techniques, microclimates, and maintenance. Conclusion: This study suggested tree history management items based on the tree defects that can be identified at the construction stage and applied them to the selected study site, which differentiates this study from earlier studies. It will be necessary to conduct a comprehensive and objective time series analysis on tree defects that occur over time by continuously monitoring and collecting data after construction.