• Title/Summary/Keyword: Sediment management

Search Result 515, Processing Time 0.022 seconds

Flood Risk Management for Weirs: Integrated Application of Artificial Intelligence and RESCON Modelling for Maintaining Reservoir Safety

  • Idrees, Muhammad Bilal;Kim, Dongwook;Lee, Jin-Young;Kim, Tae-Woong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.167-167
    • /
    • 2020
  • Annual sediment deposition in reservoirs behind weirs poses flood risk, while its accurate prediction remains a challenge. Sediment management by hydraulic flushing is an effective method to maintain reservoir storage. In this study, an integrated approach to predict sediment inflow and sediment flushing simulation in reservoirs is presented. The annual sediment inflow prediction was carried out with Artificial Neural Networks (ANN) modelling. RESCON model was applied for quantification of sediment flushing feasibility criteria. The integrated approach was applied on Sangju Weir and also on estuary of Nakdong River (NREB). The mean annual sediment inflow predicted at Sangju Weir and NREB was 400,000 ㎥ and 170,000 ㎥, respectively. The sediment characteristics gathered were used to setup RESCON model and sediment balance ratio (SBR) and long term capacity ratio (LTCR) were used as flushing efficiency indicators. For Sangju Weir, the flushing discharge, Qf = 140 ㎥/s with a drawdown of 5 m, and flushing duration, Tf = 10 days was necessary for efficient flushing. At NREB site, the parameters for efficient flushing were Qf = 80 ㎥/s, Tf = 5 days, N = 1, Elf = 2.24 m. The hydraulic flushing was concluded feasible for sediment management at both Sangju Weir and NREB.

  • PDF

Development and Evaluation of Sediment Delivery Ratio Equation using Clustering Methods for Estimation of Sediment Discharge on Ungauged Basins in Korea (국내 미계측 유역의 유사유출량 예측을 위한 군집별 유사전달율 산정식 도출 및 평가)

  • Lee, Seoro;Park, Sang Deog;Shin, Seung Sook;Kim, Ki-sung;Kim, Jonggun;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.5
    • /
    • pp.537-547
    • /
    • 2018
  • Sediment discharge by rainfall runoff affects water quality in rivers such as turbid water, eutrophication. In order to solve various problems caused by soil loss, it is important to establish a sediment management plan for watersheds and rivers in advance. However, there is a lack of sediment data available for estimating sediment discharge in ungauged basins.. Thus, reasonable research is very important to evaluate and predict the sediment discharge quantitatively. In this study, cluster analysis was conducted to classify gauged watersheds into hydrologically homogeneous groups based on the watershed characteristics. Also, this study suggests a method to efficiently predict the sediment discharge for ungauged basins by developing and evaluating the SDR equations based on the PA-SDR module. As the result, the SDR equations for the classified watersheds were derived to predict the most reasonable sediment discharge of ungauged basins with 0.24 % ~ 10.89 % errors. It was found that the optimal parameters for the gauged basins reflect well characteristic of sediment movement. SDR equations proposed in this study will be available for estimating sediment discharge on ungauged basins. Also it is possible to utilize establishing the appropriate sediment management plan for integrated management of watershed and river in Korea.

Analysis of Sediment Flushing Effect for Reservoir Sedimentation Management of the Patrind Dam in Pakistan (파키스탄 파트린드댐의 저수지 퇴사관리를 위한 배사효과 분석)

  • Noh, Joonwoo;Park, Jinhyeog;Hur, Youngteck;Kim, Sangho
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.6
    • /
    • pp.799-807
    • /
    • 2013
  • Reservoir sedimentation is one of the major concerns for sustainable reservoir operation. Since sediment concentration of the rivers in the Himalayan Mountain is very high, a proper sediment management scheme is necessary. This paper presents long-term reservoir sedimentation and sediment flushing based on the gate operation. Focused on the reservoir to be constructed for the Patrind hydropower project in Pakistan, 4 different flushing scenarios were proposed in this study to prevent successive sedimentation. By extending flushing period and by increasing the flushing discharge for 2 times, the flushing rate increases up to 53.2% and 43.6% in proportion to flushing period and discharge, respectively. Based on the simulation presented in this paper, it is expected to establish efficient sediment management plan to increase hydro power generation and sediment flushing simultaneously.

LONG-TERM RESERVOIR SEDIMENT MANAGEMENT CONSIDERING OTHER OPERATIONAL OBJECTIVES

  • Ko, Seok-Ku;Kim, Woo-Gu;Lee, Gwang-Man
    • Water for future
    • /
    • v.35 no.5
    • /
    • pp.43-50
    • /
    • 2002
  • The Yellow River Basin located in the Northern part of China is well-known not only as the seriously limited water sources but the greatest sediment-carrying stream in the world. The observed annual average sediment concentration in this area is $37.6kg/\textrm{mm}^3$, and 3.1% of the water volume is occupied by sediments. Due to the reason, water development has been extremely limited and it has been appeared as one of the most difficult problems in reservoir development and management. The major obstacle to surface water uses is reservoir sedimentation so that it has been strongly requested to seek the method managing sediment by optimal fashion. To solve this problem, KOWACO (Korea Water Resources Corporation) has developed various methods on the optimal reservoir management schemes including sediment management for the Upper Fenhe Basin Reservoir System at the cooperation project with Chinese. Information Variable Dynamic Programming. which is one of them, was developed for the reservoir sediment management and a set of non-dominated solutions are generated to choose the best alternative in water supply and reservoir sediment objective problem.

  • PDF

Occurrence of butyltin compounds in marine environment of Gwangyang Bay, Korea

  • Park, Hee-Gu;Kim, Sang-Soo;Moon, Hyo-Bang;Gu, Bon-Kyu
    • Journal of Environmental Science International
    • /
    • v.11 no.8
    • /
    • pp.793-800
    • /
    • 2002
  • Butyltin (BT) compounds were measured in seawater, sediment, sediment core, settling solids, and plankton from Gwangyang Bay in 2001, Tributyltin (TBT) was detected in seawater from 1 out of the 7 seawater sampling sites and in sediment from 18 out of the 35 sediment sampling sites. The highest concentration of TBT was found in the sediment from the site near Yeosu Harbor (53 ng Sn/g dry wt), acting as the point source for TBT The mean concentrations of TBT were in the order of plankton> settling solids> sediment. The degradation indexes ([DBT]+[MBT]/[TBT]) for the plankton were less than 1, indicating the possibility of recent inputs of TBT. The indexes for the sediment and settling solids ranged from 1.14 to 8.73. The composition of the BT compounds found in the settling solids was similar to that found in the sediment. The vertical profile of the total BT compounds in the sediment was characterized by an abrupt decline from the surface. However, no butyltin compounds appeared below a depth of 10 cm, corresponding to the 1980s. Accordingly, the current results demonstrated that the levels of all butyltin species in the environment of Gwangyang Bay were relatively lower than those in other polluted coastal areas. The vertical profile also suggested a fairly recent history for the down-core.

Effect of forest road establishment based on forest management on occurrence of suspended sediment (산림경영기반의 임도개설이 부유사 발생에 미치는 영향)

  • 이성기
    • Journal of Environmental Science International
    • /
    • v.12 no.3
    • /
    • pp.247-255
    • /
    • 2003
  • Forest management starts from forest road facility, which is designated as generation source of muddy water in mountain stream during initial stage of establishment. Therefore, this study reviewed the effect of suspended sediment generated in forest road surface on the muddy water in mountain stream with respect to marsh area of forest. As a result, characteristics of outflow of suspended sediment was understood, and it was judged that generation of suspended sediment due to establishment of forest road is diluted by mountain stream this charged from drainage area so as to have small effect on muddy water in total mountain stream.

Analysis of Sediment Discharge by Long-term Runoff in Nakdong River Watershed using SWAT Model (SWAT 모형을 이용한 낙동강 유역의 장기 유출에 따른 유사량 분석)

  • Ji, Un;Kim, Tae-Geun;Lee, Eun-Jeong;Ryoo, Kyong-Sik;Hwang, Man-Ha;Jang, Eun-Kyung
    • Journal of Environmental Science International
    • /
    • v.23 no.4
    • /
    • pp.723-735
    • /
    • 2014
  • Sediment discharge by long-term runoff in the Nakdong River watershed should be predicted for the maintenance and management of the Nakdong River newly changed by the four major river restoration project. The data establishment by the analysis of runoff and sediment discharge using the long-term watershed model is necessary to predict possible problems by incoming sediments and to prepare countermeasures for the maintenance and management. Therefore, sediment discharges by long-term runoff in the main points of the Nakdong River were calculated using SWAT(soil and water assessment tool) model and the relations and features between rainfall, runoff, and sediment discharge were analyzed in this study. As a result of sediment discharge calculation in the main points of the Nakdong River and tributaries, the sediment discharge at the outlet of the Naesung Stream was greater than the Jindong Station in the Lower Nakdong River from 1999 to 2008 except the years with low precipitation. The sediment discharge at the Nakdong River Estuary Barrage (NREB) was corresponding to 20% of the Jindong Station which is located about 80 km upstream from NREB.

Management and Remediation Technologies of Contaminated Sediment (오염퇴적물 관리방향 및 처리공법)

  • Kim, Geon-Ha;Jeong, Woo-Hyeok
    • Journal of Soil and Groundwater Environment
    • /
    • v.12 no.3
    • /
    • pp.1-9
    • /
    • 2007
  • As Total Maximum Daily Load program is being implemented, needs for the management and treatment of contaminated sediment are rising to attain cleaner water resources. In this paper, impacts and management methods of contaminated sediment were reviewed. Remediation technologies for contaminated sediment including dredging, natural attenuation, in situ solidification/stabilization, in situ biological remediation, in situ chemical remediation and capping were reviewed. Integrated remediation scheme was presented as well.

The Effects of Hydrologic Characteristics on Sediment Discharge in Streams with Small and Medium Size Watersheds (중소유역의 수문학적 특성이 하천유사량에 미치는 영향)

  • 김활곤;서승덕
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.38 no.3
    • /
    • pp.127-136
    • /
    • 1996
  • The purpose of this study is to provide with information for the water resources development and management in stream management planning, such as information on the sediment trensport, design of dam and water facilities, river improvement and flood plains management. The major results obtained from the field measurement and analysis of the watershed characteristics, hydraulic and sediment characteristics are as follows ; 1. The rating curve formulas obtained from the analysis of the hydraulic characteristics data collected are ; Q-=110.563 $(H-0.474)^2$ for 0.7m$(H-0.146)^2$ for 0.4m$Sr=aX{^2} {_1} X^{c}{_2}$, in the experimental watershed.

  • PDF

Enhanced Sediment Assessment Tool for Effective Erosion Control (효과적인 토양유실 방지대책 수립을 위한 유사평가툴)

  • Lim, Kyoung-Jae;Engel, Bernard A.;Choi, Ye-Hwan;Choi, Joong-Dae;Kim, Ki-Sung;Shin, Yong-Cheol;Heo, Sung-Gu;Lyou, Chang Won
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.632-636
    • /
    • 2005
  • Accelerated soil erosion is a worldwide problem because of its economic and environmental impacts. To effectively estimate soil erosion and to establish soil erosion management plans, many computer models have been developed and used. The Revised Universal Soil Loss Equation (RUSLE) has been used in many countries, and input parameter data for RUSLE have been well established over the years. However, the RUSLE cannot be used to estimate the sediment yield for a watershed. Thus, the GIS-based Sediment Assessment Tool for Effective Erosion Control (SATEEC) was developed to estimate soil loss and sediment yield for any location within a watershed using the RUSLE and a spatially distributed sediment delivery ratio. SATEEC was enhanced in this study by developing new modules to:1) simulate the effects of sediment retention basins on the receiving water bodies, 2) prepare input parameters for the Web-based sediment decision support system using a GIS interface. This easy-to-operate SATEEC system can be used to identify areas vulnerable to soil loss and to develop efficient soil erosion management plans.

  • PDF