• 제목/요약/키워드: Sediment control dam

검색결과 55건 처리시간 0.027초

사방댐 설계방법의 문제점과 그 대책 (The Points of Issue and Countermeasure for Sediment Control Dam Designs)

  • 김운형;송병웅;김범석;김주한;이경희
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.1057-1064
    • /
    • 2009
  • Since the global warming causes debris flow damage has increased in Kangwon Area, Sediment control dam have increasingly founded to protect the damage. In spite of the realities design methods are well not established to determine type of the dam, design parameters and maintenance. Through comparison for design methods to sediment control dam in Korea, it raised some points to improve to correspond with realities. In addition, it pointed that some issues for the sediment control dams in Kangwon Area. Those are shown that unclear positions of the dams, unremoval of sediment, occurrence of seepage under the dams and uninstallation of roads to remove sediment. In addition, the countermeasure for the issues are proposed.

  • PDF

산림유역의 만사 사방댐에 의한 토사유출 조절 효과 추정 (Estimation of Sediment Discharge Controlled by Sediment-filled Check-dam in a Forested Catchment)

  • 서정일;전근우;송동근
    • 한국산림과학회지
    • /
    • 제105권3호
    • /
    • pp.321-329
    • /
    • 2016
  • 이 연구에서는 2006년 집중호우 시 산사태 및 토석류가 발생한 강원도 인제군의 기룡산 유역을 대상으로 사면붕괴 및 계상변동을 추정하여 만사 상태에 도달한 불투과형 사방댐이 토사유출 조절에 미치는 영향을 정량적으로 해석하고, 이를 토대로 사방댐의 설계 및 준설기준을 고도화하는 데에 필요한 새로운 인자를 제안하였다. 일반적으로 사방댐은 계획평형기울기 구간과 계획홍수기울기 구간에서 각각 토사유출의 억제와 조절 기능을 발휘하고 있다. 연구대상유역에 시공된 불투과형 사방댐은 계획억제토사량에 해당하는 저사량이 $2,111m^3$로 설계되었지만, 2006년 집중호우로 인한 산지교란 발생 시에는 해당 사방댐 직상부로부터 250 m의 계류구간에 걸쳐 $3,996m^3$의 유출토사를 조절한 것으로 관측되었다. 결과적으로 해당 사방댐은 유출토사 억제를 위한 계획억제토사량보다 큰 규모의 계획조절토사량을 나타내어 만사된 이후에도 유출토사의 조절이라는 사방댐의 기능을 발휘하고 있었다. 이와 같이 사방댐의 토사유출 조절기능은 토사유출 억제기능과 구분하여 평가하여야 하지만, 현재 우리나라에서는 현지에서 유역 특성을 실측한 자료를 기반으로 한 계획억제토사량 또는 계획조절토사량을 사방댐의 설계 및 준설기준 인자로서 고려하고 있지 않다. 따라서 합리적인 사방댐의 설계 및 유지관리 기준을 마련하기 위해서는 사방댐의 토사유출 억제기능과 조절기능을 정량적으로 해석한 현장자료가 축적되어야 하며, 이는 우리의 사방기술이 보다 객관적이고도 체계적인 면모를 갖춘 과학적 기술로 발전할 수 있는 방안일 것이다.

홍수조절댐에서의 배사관 설치에 따른 상류 하천의 하상변동에 관한 수치모의 연구 (Numerical Analysis for Bed Changes in the Upstream Channel due to the Installation of Sediment Release Openings in the Flood Control Dam)

  • 지운;손광익;김문모
    • 한국수자원학회논문집
    • /
    • 제42권4호
    • /
    • pp.319-329
    • /
    • 2009
  • 홍수피해를 경감시키고 홍수조절을 목적으로 계획되는 홍수조절용댐의 경우 홍수 발생 기간 외에는 상류와 하류 하천간의 흐름 차단을 억제하고 상류로부터 유입되는 유사가 댐 상류 부분에 퇴적되는 현상을 방지하기 위해 댐에 상시 개방되어 있는 배사관을 설치하기도 한다. 국내에서는 임진강 유역의 홍수피해 저감을 위해 건설되는 한탄강홍수조절댐에 배사관과 생태통로를 설치하도록 계획되었다. 본 연구에서는 1차원 HEC-6 모형을 이용하여 한탄강홍수조절댐 건설로 인한 댐 상류의 퇴사현상을 댐 건설 전의 현상과 비교 분석하였으며 연평균유량 조건뿐만 아니라 연간 유량변동을 고려한 대표유량수문곡선을 적용하여 퇴사현상을 모의하였다. 수치모의 결과, 댐 건설로 인한 하류단 수위 변화가 발생하더라도 하상변동의 영향은 댐에서 상류 2 km 구간을 넘지 않는 것으로 나타났다. 또한 댐 건설 후 배사관의 설치 유무에 따른 배사관 주변과 댐 상류 하상 변화를 예측하기 위해 2차원 RMA2 및 SED2D 모형을 이용하였으며 한탄강홍수조절용댐의 댐 저부에 설치된 배사관의 배사효과는 저수지 내의 퇴적고를 저감시키는 효과가 있는 것으로 나타났다.

댐 저수지의 퇴사위 결정 방법에 관한 연구 (Comparative analysis of methods for sediment level estimation in dam reservoir)

  • 주홍준;김형수;조운기;곽재원
    • 한국수자원학회논문집
    • /
    • 제51권1호
    • /
    • pp.61-70
    • /
    • 2018
  • 본 연구에서는 댐의 효율적인 계획 및 운영을 위해 댐 저수지의 최적 퇴사위 결정 방법에 대해 고찰하였다. 현재 우리나라는 안전한 설계에 의거하여 댐 저수지 사수위 내의 퇴사위 결정 방법은 비교적 높게 산정되는 수평퇴사법을 주로 적용하고 있지만, 댐 저수지의 퇴사위는 정확하게 계획되어야 하며, 이는 댐 생애주기 평가 차원에서도 중요한 요소이다. 댐 저수지의 퇴사위 결정을 위해 대표적인 방법으로는 RMA-2와 연계된 SED-2D의 모형에 의한 방법, 수평퇴사법, 면적증분법(area increment method), 경험적면적감소법(empirical area reduction method)이 있다. 본 연구에서는 최적 퇴사위 결정을 위해 이를 산정하여 2007년 기준 실측 퇴사위와 비교하였다. 또한, 현재 및 미래 퇴사위를 예측하여 각 방법별로 경향과 추이를 분석하였다. 실측 퇴사위와 산정된 퇴사위를 비교한 결과, 경험적면적감소법이 실측값과 가장 근사하게 산정된 것을 확인할 수 있었으며, 현재 및 미래의 퇴사위는 전반적으로 과거 퇴사위의 경향과 추이를 따라가는 것으로 확인되었다. 따라서, 본 연구의 결과를 토대로 보면 경험적 면적감소법의 이용이 적절할 것으로 판단되고, 모형에 의해 분석 결과의 타당성을 검정하는 것이 합리적이라 생각된다.

최적제어 이론을 이용한 댐 토사관리방안 : 이집트 아스완 댐 사례 (An Optimal Control Theory on Economic Benefits of Dam Management: A Case of Aswan High Dam in Egypt)

  • 이윤;김동엽
    • 환경정책연구
    • /
    • 제9권2호
    • /
    • pp.41-55
    • /
    • 2010
  • 댐은 사회전반에 걸쳐 많은 편익을 제공하고 있다. 이를 위해서는 일정수준 이상의 저수용량 확보가 필수적이다. 그러나 상류의 토사 유입으로 인하여 댐의 저수용량은 줄어들고 있는 실정이다. 전 세계적으로 5조 톤의 토사가 매년 댐 뒤에 쌓이는 실정이다. 강이 여러 지역에 걸쳐 흐르는 경우 상류의 농업에서 발생하는 토사는 장시간에 걸쳐서 지속적으로 발생하기 때문에 상류 농업종사자들은 관리를 소홀히 하는 경향이 있다. 특히 토사는 댐의 저수용량을 지속적으로 줄여 궁극적으로는 댐의 경제적 가치를 소멸시키는 효과가 있다. 따라서 상류 지역의 토사저감 노력과 함께 댐의 저수용량 확보가 급선무이다. 실증분석으로 나일강 상류의 수단 농업지역과 하류의 이집트 Aswan High Dam을 분석하였다. 실증분석 결과 상류 농업부문의 토사저감 노력과 댐의 토사제거 방안이 사회전체의 경제적 편익을 극대화하는 것으로 나타났다. 동태적 최적제어이론을 이용한 유역토사관리 모형에서 댐의 경제적 편익을 포함한 사회전체의 편익은 크게는 약 1,510억 달러로 추산되었다.

  • PDF

Impact of Estuarine Dams on the Estuarine Parameter Space and Sediment Flux Decomposition: Idealized Numerical Modeling Study

  • Figueroa, Steven M.;Lee, Guan-hong;Chang, Jongwi;Lagamayo, Kenneth D.;Jung, Nathalie W.;Son, Minwoo
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2022년도 학술발표회
    • /
    • pp.276-276
    • /
    • 2022
  • Estuarine dams are constructed for securing freshwater resources, flood control, and improving upstream navigability. However, their impact on estuarine currents, stratification, and sediment fluxes is not well understood. To develop a general understanding, an idealized modeling study was carried out. Tide and river forcing were varied to produce strongly stratified, partially mixed, periodically stratified, and well-mixed estuaries. Each model ran for one year. Next, the models were subject to the construction of an estuarine dam and run for another year. Then, the pre- and post-dam conditions were compared. Results showed that estuarine dams can amplify the tidal range and reduce the tidal currents. The post-dam estuaries tended to be a salt wedge during freshwater discharge and a bay during no freshwater discharge. For all estuaries, the estuarine turbidity maximum moved seaward, and the suspended sediment concentrations tended to decrease. In terms of sediment flux mechanisms, the estuarine dam increased the seaward river runoff for cases with strong river, and increased the landward tidal pumping for cases with strong tides.

  • PDF

남강댐하류의 물리적 하천교란 평가 (Assessment of Physical River Disturbances in the Namgang-dam Downstream)

  • 김기홍
    • 한국환경복원기술학회지
    • /
    • 제11권3호
    • /
    • pp.74-86
    • /
    • 2008
  • To assessment the disturbances of the Namgang caused by dam construction, upstream area was selected for the reference reach and downstream area was selected for the comparison reach. And these reaches were surveyed and analyzed according to the assessment criteria of the river disturbances.The artificial factors of river disturbances were classified as river improvement works, dam construction and aggregate dredging. The indexes were physical factors as like epifaunal (bottom), embeddedness, velocity/depth regime, sediment deposition, channel flow status, channel alteration, frequency of riffles, bank stability, vegetative protection, riparian zone etc.The assessment results showed 46% of the assessment criteria which was serious status in dam downstream area and 89.5% of it which was excellent status in dam upstream.Finally, the results showed that physical river environment in downstream area was disturbed by the discharge control and the interception of sediment discharge by dam, consequently this disturbance give rise to impact of ecosystem in river.

댐하류의 하천환경 개선 (Improvement of river environment in the downstream reaches of dams)

  • Ozawa, Takashi
    • 한국환경생태학회:학술대회논문집
    • /
    • 한국환경생태학회 2003년도 추계학술논문발표회 논문집
    • /
    • pp.1-21
    • /
    • 2003
  • I introduce the Flexible Dam Operation (FDO) and some of sediment control techniques In dams which are implemented as trials to avoid or reduce environmental impact of dams on the downstream reaches. The FDO is a dam management method to improve river environment in the downstream reaches by means of the flushing flow, the maintenance flow and so on utilizing a vacant portion of capacity for flood control without interrupting prime flood control function during the rainy/typhoon season. It Is suggested by the guideline of the FDO that EDO should be implemented regularly after the trial for about three years. The basic conception of the FDO is described here. The example of excavation of deposited sediments in check dams and placement of sand ana gravel immediately downstream of the dams and the example of coordinated sediment flushing are described as some of sediment control techniques in dams. Now they are at the stage of experiment and trial. Therefore, it is important to increase examples and establish the technical methodology and the environmental evaluation method for them.

  • PDF

대청댐 저층 퇴적물 박테리아 군집과 활성 평가 (Assessment of Bacterial Abundance and Activities in Sediment of Daecheong Dam Reservoir)

  • 공인철;이용상
    • 환경영향평가
    • /
    • 제12권1호
    • /
    • pp.35-44
    • /
    • 2003
  • Bacterial activities of dam reservoir sediments were assessed using the methods of viable counts, ATP contents, dehydrogenase activity, and oxygen consumption. Viable heterotrophs in collected sediments were observed in the range of $10^6{\sim}10^{10}$ CFU/g dry wt. sediment. All assessed methods showed high activities in sediment samples collected from near dam site. In addition, bacteria increase in sediments amended with cellulose, starch, lipid, and protein compounds. Various ranges of antibiotics and heavy metals resistance bacteria were also detected, especially, 10~100 times less numbers of Cd resistance bacteria were observed compared with those of Pb and Cr. In general, antibiotics resistance groups were in the range of $10^{-1}{\sim}10^{-6}$ times of control.

SHIHMEN SEDIMENT PREVENTION DIVERSION TUNNEL PLANNING AND DESIGN

  • Ho-Shong Hou;Ming-Shun Lee;Percy Hou
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.168-172
    • /
    • 2009
  • Shihmen reservoir was started in May 1963. The main purposes of Shihmen reservoir are for agriculture, power supply, flood control and tourism. Shihme Asn dam is an earth dam. Its crown height is 133m above mean sea level, with length 360 m, watershed 763.4 km2, and maximum volume 309 million cms. Turbidity in Shihmen dam was severely affected by typhoons Aere (2004) and Masa (2005). Increased deposition after Aere was 28 million cms. Turbidity at Shihmen Canal Inlet is 3000 NTU (Nephelometry Turbidity Unit). Sediment sluicing strategies for downstream channel are demanded. Therefore, diversionary sediment preventing channel is planned in the upstream of Shihmen reservoir. Finally, turbid flow in tunnel channel is bypassed and diverted its flow down to downstream.

  • PDF